| 1 | Dismantling of following road, brick work or stone work in lime or cement mortar and including stacking of materials as directed by E/IC with in a distance of 60 meters. (Jal Nigam Agra DSR) |
| 2 | Bitumin Road |
| 3 | C.C. Interlocking Road |
| 4 | Excavation in soil with mixed kankar bolder in foundation requaring use of all req. tools & tackles, lift upto 1.5 mt & lead upto 30 mtr and removal of surplus earth as directed by engineer incharge upto a distance of 30 mtr from foundation trench incl. royalty @ 9.00 Cum (Jal Nigam Agra DSR) |
| 5 | Providing of 150 mm D.I. K-7 ISI make working labour T&P and all complete. (Jal Nigam Agra DSR) 2022 |
| 6 | Supply of pipe Special (labour, 150mm D.I. Incl. End cap, reducer, socket) T&P complete. (5% cost of pipe) |
| 7 | Laying & Jointing of 150mm & 300mm D.I. K-7 Pipe Line with all labour,T&P Complete.(Rate of Jal Nigam) |
| 8 | Providing, lowering, laying in trenches, aligning, fixing in position and jointing ductile Iron (DI) ISI marked K-7 grade S&S pipes as per IS:8329-2000 (amended upto date), with internal cement mortar lining suitable for potable water with rubber ring (EPDM) joints as per IS: 5382-1985 including all taxes (Central and local), transportation and frieght charges, inspection charges loading/unloading charges, including cost of labour and material, specials, (Tee, bend etc) satisfactory hydraulic testing, disinfection, commissioning etc complete as per technical specification and direction ofn Engineer-in-charge. (excluding earth work) Note:Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shal not be paid |
| 9 | Supply & fixing of 150mm valve (Brass) all complete. (MR) |
| 10 | Supply & fixing of 80mm Air valve all complete. (MR) |
| 11 | Supply of 160 mm C.I.D. Joint with rubber ring & Nutt bolt etc. all complete (M.R.) |
| 12 | Shifting of house connection. (Jal Nigam Agra DSR) |
| 13 | Barricading of site with all required material labour T&P supporting material of public vehicle Safety (Jal Nigam Agra DSR) |
| 14 | Supply & fixing of flow meter labour, T&P complete (M.R.) |
| 15 | Interconnection with new line following dia distribution main and already laid 900mm dia pipe line incl. hanging out 150mm dia D.I. pipe required excavation cutting and talking out of pipe, making face of pipe in proper shape lowering and fixing of special and its jointing excluding all materials, Tee, nut-bolts, rubber packing etc incl.barricading, dismantling of road etc required for proper completion of the work. (Jal Nigam Agra DSR) |
| 16 | Making Chamber for sluice valve constructing brick masonary chamber for underground C.I. inspection chamber and bands with bricks in cement mortar 1:4 (1cement :4 coarse sand) R.C.C. cover with frame (light Duty) 455x610mm internal demention ,total weight of cover with frame tobe not less than 38kg (weight of cover 23kg and weight of frame 15kg), R.C.C top slab with 1:2:4 mix (1cement :2 coarse sand :4 graded stone aggregate 20mm normal size) foundation concrete 1:5:10 (1cement :5 fine sand :10 graded stone aggregate 40mm nominal size) inside plastering 12mm thick with cement mortar 1:3 (1cement :3 coarse sand) finished smooth with a floating coat of neat cement on walls and bed concrete etc complete as per standard design: (c) |
| 17 | Re-instatement of following type of road surfaces after laying of pipe line and house connection incl. supply of all materials, T&P etc, required for proper completion of work as per direction of eingineer-in-charge. the quantity of re-instatement has been increased by thirty percent in the view of 15 additional damaged of dismantled road due to traffic/vehicle movement. (Jal Nigam Agra) |
| 18 | Bitumin Road |
| 19 | C.C. Interlocking Road |
| 20 | Contigency work |
| 21 | GST 18% Please Enable Macros to View BoQ information |