| 1 | DRILLING WORK |
| 2 | Transportation, erection and dismantaling of Rig machine. |
| 3 | DC/RC Drilling of 400mm Dia upto 100m Deep. |
| 4 | Water Arrangement for drilling of bore hole upto lowering completion of tubewell work including digging of Pits. |
| 5 | BORING MATERIAL AND LOWERING WORK |
| 6 | 200mm Dia PVC Plain Pipe 10 Kg/cm2 |
| 7 | 200mm Dia PVC Rubbed screen Pipe 10 Kg/cm2 |
| 8 | Providing and fixing Bail Plug/ Bottom Plug of required data(200mm) to the bottom of the Pipe assembly of tubewell as per IS:2800 Part 1. |
| 9 | Lowering of PVC assembly i/c all comp work |
| 10 | 200mm Dia PVC Centre Guide |
| 11 | Supply of plastic Gola, Rippet and solvent |
| 12 | Pea Gravel (According to specification) |
| 13 | Bentonite Powder as per requirement |
| 14 | Providing and fixing MS Clamp of required dia (200mm) to the Top of casing/ housing Pipe of tubewell assembly as per IS:2800 Part 1. including necessary bolts & nuts of required size complete. |
| 15 | TUBEWELL DEVELOPMENT |
| 16 | Transportation, erection and dismantaling of 150 Psi Compressor. |
| 17 | Charges for development by 150 Psi Compressor per hour. |
| 18 | SITC OF PUMPING PLANT INCLUDING STARTER, CONTROL PANEL, CABLE COMPLETE IN ALL RESPECT WITH ALL REQUIRED MATERIAL, T&P LABOUR ETC. |
| 19 | 15 H.P |
| 20 | S/F of dia 80mm/m G.I Pipe with flanged B- Class ISI mark (Length 3m each) |
| 21 | Safety wire |
| 22 | PUMP FITTINGS & OTHERS |
| 23 | S/F of ISI Marked Double flanged MS pipe |
| 24 | S/F of MS Pipe 80mm B class ISI Mark |
| 25 | S/F of 80 mm NRV |
| 26 | S/F of 80 mm Sluice Valve |
| 27 | MS Flange 80mm |
| 28 | MS Flange welding on 80mm MS Pipe |
| 29 | Nut & Bolts |
| 30 | MS panel Box back side Backelite with 1.25m angle iron stand, locking arrangement in box with grouting. |
| 31 | Supply of Kit kat 100 Amp |
| 32 | Fixing of All electrical items as per direction by site engineer |
| 33 | RCC Platform 1m dia and 9'' Brick Piller for Tee Support |
| 34 | Welding work, Pipe Line digging, D joint fitting and connect to Pipe Line. |
| 35 | Site cleaning and Malba Disposal |
| 36 | Chemical and Bacterological test of water sample from departmently/Approved lab. |
| 37 | RATES FOR POWER CONNECTIONS |
| 38 | Energy Meter (5KW to 20 KW) |
| 39 | Processing fees |
| 40 | Security charges@4500/KVA |
| 41 | XLPE insulated Al. armoured cable size 1x3.5cx35sq mm. from transformer LV side to meter panel and meter panel to starter. |
| 42 | Add 18 % GST Amount Please Enable Macros to View BoQ information |