|
| 1 | IR Testing of LT Cables | IR & PI testing of LT cable, Connection Opening & Closing shall be inclient scope |
| 2 | IR Testing of LT Motors | IR & PI testing of LT Motors, Connection Opening & Closing shall be inclient scope |
| 3 | WR Testing of LT Motors | Connection Opening & Closing shall be in client scope |
| 4 | Relay Testing | Thermal Relays |
| 5 | Thermography | of Electrical Panels as per OISD 137 |
| 6 | Transformer oil Testing | Di-Electric Strength, Water Content, IFT, Tan Delta, Resistivity, Acidity,Sludge & Sediment, Flash Point, DGA(07 Gases) |
| 7 | Ammeter and Voltmeter Calibration | Ammeter & Voltmeter Calibration |
| 8 | IR and PI Testing of HT Cable | IR & PI Testing of HT Cable |
| 9 | Inspection and Testing of Installed MCB | Inspection/Testing of Installed MCB |
| 10 | PD Testing of Transformer | using Fully Automatic Testing Kit without Manual Intervention |
| 11 | PD Testing of HT Cable | using Fully Automatic Testing Kit without Manual Intervention |
| 12 | Calibration of Multifunction Meter | Calibration of Multifunction Meter or Energy Meter |
| 13 | OTI Calibration, OISD 137 | OTI Calibration as per OISD 137 |
| 14 | WTI Calibration, OISD 137 | WTI Calibration as per OISD 137 |
| 15 | Bucholz Relay Testing | Bucholz Relay Testing as per OISD 137 |
| 16 | Transformer Routine Testing | Transformer Routine Testing |
| 17 | Tan Delta Testing of Transformer | using Fully Automatic Testing Kit without Manual Intervention |
| 18 | Tan Delta Testing of HT Cable | using Fully Automatic Testing Kit without Manual Intervention |
| 19 | VLF Testing of Cables | using Fully Automatic Testing Kit without Manual Intervention |
| 20 | LA Testing, 3rd Harmonic | 1 Each i.e. 3 Nos LA , using Fully Automatic Testing Kit without Manual Intervention |
| 21 | VCB Maintenance | VCB Maintenance General Maintenance |
| 22 | VCB Testing | Includes, IR, CRM, Breaker Timings |
| 23 | VCB Bottle Testing | using Fully Automatic Testing Kit without Manual Intervention, 1 Set means 3Nos Bottles |
| 24 | ACB Maintenance | General Maintenance |
| 25 | ACB Testing, IR, CRM, Breaker Timing | ACB Testing - Includes, IR, CRM, Breaker Timings |
| 26 | Trip, Alarm Signal Simulation Transfor | Trip/Alarm Signal Simulation of Transformer |
| 27 | Numerical Relay Testing | Numerical Relay Testing |
| 28 | Aux. Relays Relay Testing | Aux. Relays Relay Testing |
| 29 | SFRA Testing of Transformer | using Fully Automatic Testing Kit without Manual Intervention |
| 30 | DFRA Testing of Transformer | using Fully Automatic Testing Kit without Manual Intervention |
| 31 | Arc Flash Study | As per Requirement of CEA Regulations 2023 |
| 32 | Relay Coordination Study | As per Requirement of CEA Regulations 2023 |