| 1 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.15.7.4 In cement mortar |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 5 | Dismantling steel work in built up sections in angles, tees, flats andchannels including all gusset plates, bolts, nuts, cutting rivets, weldingetc. including dismembering and stacking within 50 metres lead. |
| 6 | Dismantling roofing including ridges, hips, valleys and gutters etc., andstacking the material within 50 metres lead of: FRP Sheet |
| 7 | Demolishing R.C.C. work manually/ by mechanical means includingstacking of steel bars and disposal of unserviceable material within 50metres lead as per direction of Engineer - in- charge. |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantledor waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 9 | Cleaning of choked rainwater spout including removal of silt, rubbish, malba etc. and disposal within 50 m lead as per direction of Engineer-in-Charge.” |
| 10 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) |
| 11 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 12 | Providing & fixing UV stabilised fiberglass reinforced plastic sheet roofing up to any pitch, including fixing with polymer coated ‘J’ or ‘L’ hooks, bolts & nuts 8 mm dia. G.I plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-violet stabiliser in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866.The sheets shall be opaqueor translucent, clear or pigmented, textured or smooth as specified. mm thick corrugated (2.5\\" or 4.2\\" or 6”) or step-down (2\\" or 3” or 6” ) as specified |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 14 | Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plasteredsurfaces : One coat |
| 15 | Supplying, transporting, and fixing prefabricated speed breakers (rumble strips) of size 900 mm equilateral triangle, made of durable materials such as high-density polyethylene (HDPE), rubber, or thermoplastic, on existing road surfaces. The work includes surface preparation, alignment, fixing with appropriate fasteners, and ensuring proper visibility and reflectivity as per the direction of the Engineer-in-Charge. Rate includes all materials, labor, tools, and accessories required for proper installation. |
| 16 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing thesurface & cleaning with mechanical broom. With rapid setting bitumen emulsion16.31.1.1 On W.B.M / W.M.M. @ 0.4kg/sqm |
| 17 | providing and laying stone matrix asphalt (SMA) using crushed stone aggregates of specified grading combined with bituminous binder and lime filler and cellulose fiber transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density, as per specification complete as per directions of Engineer-in-Charge.(a) 40/50 mm compacted thickness with bitumen of grade VG-30 @ 6.00% (percentage by weight of total mix) and lime filler @ 6% to 10% (percentage by weight of aggregates) and cellulose fiber pellets @ 0.30% of total mix prepared in batch type hot mix plant of 100-120 TPH capacity. |
| 18 | Providing and fixing precast RCC barrier of trapezoidal section having base width 300 mm tapering to 100 mm in first 100 mm height and thereafter rectangular section of 100 mm thickness up to 600 mm overall height, including casting in approved moulds with M-30 grade concrete, vibration, curing, lifting, transportation to site, placing in position, alignment, jointing with cement mortar, grouting and finishing complete as per approved drawing and direction of Engineer-in-Charge. |
| 19 | Providing precast cement concrete Jali 1:2:4 (1 cement : 2 coarse sand(zone-lll) : 4 graded stone aggregate 6 mm nominal size ), reinforced with 1.6 mm dia mild steel wire, including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete, excluding plastering of the jambs, sills and soffits.5.18.1 50 mm thick` |
| 20 | Deduction for dismantled structural steel obtained from dismantling/demolition, the contractor shall dispose of the dismantled steel at his own cost, including loading, unloading and carriage for all leads, complete as directed by Engineer-in-Charge. The weight of dismantled steel shall be recorded on an automatic weighing machine and the receipt issued by the authorized weighbridge agency/operator shall be final. Payment / deduction shall be made accordingly. Disposal or transportation of the material shall be allowed only in the presence of JE/AE. The rate includes a factor of 0.6 of the market value of scrap steel to account for rusting and other wastage. The contractor must visit the site and satisfy himself about the quality, condition, of the material before quoting the rate. |
| 21 | Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS : 164, on bituminous surface in white/yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign material etc. complete.16.48.1 New work (Two or more coats) |
| 22 | Add GST factor @0.973= 18018581.75 |
| 23 | Add Cost Index @-0.09% except item no. 6,9,15,8,20 Please Enable Macros to View BoQ information |