| 1 | 63 KVA DTR RCC Muff 2000mm Long with concrete filling |
| 2 | MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] for Incomer Line. |
| 3 | MS Angle Iron (50X50x6 mm), Length: 2800 mm x (1 Nos for LA's). |
| 4 | MS Channel Iron X-Arm:[Size (75x40x4.8)mm, Length : 2800 mm x 4 Nos] supporting DO fuse unit & GO switch. |
| 5 | MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] for Transformer Bed. |
| 6 | MS Channel Iron X-Arm:[Size (100x50x6 mm), Length : 460 mm x 2 Nos] for supporting Main Channel of Transformer]. |
| 7 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos. for Belting of Transformer |
| 8 | MS Angle Iron (35X35x6 mm), Length : 460 mm x 2 Nos for supporting Belt X Arms. |
| 9 | MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracings. |
| 10 | MS Angle Iron (50X50x6 mm), Length: 2800 mm x ( 2 No. for LT Distribution Panel Box). |
| 11 | MS Angle Iron (50X50x6 mm), Length: 450 mm x ( 1 No. GO S/W fixing). |
| 12 | MS Chanel Iron (75x40x6 mm), Length: 460 mm x ( 1 No. for GO Switch Handle mounting). |
| 13 | GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type |
| 14 | D.O Fuse Unit |
| 15 | Surge Arrester, 9 kV ,10 kA Station Class (Porcelain Type) |
| 16 | Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.) |
| 17 | HT Stay Set Complete i/c Guy Assembly , Egg Insulator and Helically fittings) |
| 18 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 19 | Sub-Station Pipe Earthing Set (Complete in all respect) |
| 20 | 6 SWG GI wire For Earthing |
| 21 | LT Panel Distribution Box MS Sheet od 1.6mm 900x500x200mm) cubide Box complete with stand etc and AI Busbar (25x5mm)inside painted/poweder caated after primary coating etc allied assembly MCCB 100amo 3P 35KV,ICS-100% ICU,KIT-KAT 200Amp for 25 KVA DTR |
| 22 | Half Clamp made of MS Flat 50x6mm |
| 23 | Full Clamp made of MS Flat 50x6mm |
| 24 | M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 25 | Aluminium Thimble of various sizes |
| 26 | Copper Thimble suitable for main LT cable 35 mm2 |
| 27 | Danger Plate (250X200X1.6 mm) |
| 28 | Barbed Wire |
| 29 | LT Cable (3.5 Core) 3.5 X 120 mm² |
| 30 | LT Switched Capacitor 9-KVAr for 63 KVA (rate per 27 KVAr) |
| 31 | Aluminium Paint. |
| 32 | LT Line RCC Muff 2000 mm long with concrete filling material |
| 33 | Channel iron Iron (75X40x5 mm), ( Length-1.50Mtr+0.2Mtr)mm x1 Nos. Per Pole |
| 34 | Shackle Insulator (16 kN) |
| 35 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 36 | Earh Knob |
| 37 | LT Stay Set Complete i/c stay clamp) |
| 38 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 39 | Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). |
| 40 | Half Clamp made of MS Flat 50x6mm |
| 41 | LT Earthing Set complete in all respect |
| 42 | Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m} |
| 43 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 44 | Aluminium Paint |
| 45 | LT egg insulator |
| 46 | Erection of 11/0.4KV, 63 KVA Sub-Station Structure using Steel Tubular Poles a/w RCC Muff & its concrete filling as per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, Filling muffs with PCC mixture, re-filling of pit & ramming, drilling of holes in Cross X Arms, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, Painting of Complete structure with red oxide paint & then alluminium paint, fixing of GO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Energy Meter. Erection of S/Stn. Pipe Earthing Set (3Nos.) complete in all respect including providing Char Coal, Salt etc., Erection of Transformer, Providing Earthing Connection to GO Switch, Transformer, Lighteneing Arrestor etc. Erection of Stay Sets, Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect. |
| 47 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 48 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 49 | Erection of LT Earthing as per latest standard practices /specification of REC / HPSEBL including digging of pit fixing of LT Earth Set, refilling the same and prov. earthing connection completein all respect. |
| 50 | Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 50mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 51 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 52 | Add Transportation charges/mannual carriage , loading unloding of material from site to store & store to site as instruction from Site Incharge complete job in all respect. Please Enable Macros to View BoQ information |