|
| 1 | prov. 1ph LT Extension to left out houses at vill Ladiyar and Tiyanin E section Uhal UESD Kakkar. TS No -72/2024-25 WBS No- 32100257-001-hmr-lt-284 RCC Muff 2000 mm long with concrete filling material |
| 2 | Angal Iron (50X50x6 mm), 950 mm2 |
| 3 | Shackle Insulator (16 kN) |
| 4 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 5 | LT Stay Set Complete i/c stay clamp) |
| 6 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 7 | Half Clamp made of MS Flat 50x6mm |
| 8 | LT Earthing Set complete in all respect |
| 9 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 10 | Aluminium Paint |
| 11 | LT egg insulator |
| 12 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 13 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 14 | Erection of LT Earthing as per latest standard practices /specification of REC / HPSEBL including digging of pit fixing of LT Earth Set, refilling the same and prov. earthing connection completein all respect. |
| 15 | Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 30mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 16 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 17 | prov. 3ph LT Extension & reorganization of LT line & AB cable in Gehra Madiyar village in E section Kakkar UESD Kakkar. TS No -73/2024-25 WBS No- 32100257-001-hmr-lt-285 RCC Muff 2000 mm long with concrete filling material |
| 18 | Angel Iron (50X50x6 mm), 950 mm2 |
| 19 | Shackle Insulator (16 kN) |
| 20 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 21 | LT Stay Set Complete i/c stay clamp) |
| 22 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 23 | Half Clamp made of MS Flat 50x6mm |
| 24 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 25 | Aluminium Paint |
| 26 | LT egg insulator |
| 27 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 28 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 29 | Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 30mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 30 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 31 | Erection Charges of AB cable |
| 32 | Add Transportation charges/mannual carriage , loading unloding of material from site to store & store to site as instruction from Site Incharge complete job in all respect. Please Enable Macros to View BoQ information |