| 1 | 1Prov. Single phase LT extension for newly constructed houses in vill. Dharyara RCC Muff 2000 mm long with concrete filling material |
| 2 | Channel iron Iron 100X50X5 mm), ( Length-750 mm x1 Nos. Per Pole |
| 3 | Shackle Insulator (16 kN) |
| 4 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 5 | LT Stay Set Complete i/c stay clamp) |
| 6 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 7 | Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). |
| 8 | Half Clamp made of MS Flat 50x6mm |
| 9 | Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m} |
| 10 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 11 | Aluminium Paint |
| 12 | LT egg insulator |
| 13 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 14 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 15 | Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 50mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 16 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 17 | 2.prov. 1-phase lt ext. for newly constructed houses in vill. Gabha in ES Kale Amb UESD Tauni Devi. T.S. 122/2025-26. WBS no. 32100257-001-HMR-LT-351 RCC Muff 2000 mm long with concrete filling material |
| 18 | Channel iron Iron (75X40x5 mm), ( Length-600 mm |
| 19 | Shackle Insulator (16 kN) |
| 20 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 21 | LT Stay Set Complete i/c stay clamp) |
| 22 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 23 | Half Clamp made of MS Flat 50x6mm |
| 24 | LT Earthing Set complete in all respect |
| 25 | Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m} |
| 26 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 27 | Aluminium Paint |
| 28 | LT egg insulator |
| 29 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 30 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 31 | Erection of LT Earthing as per latest standard practices /specification of REC / HPSEBL including digging of pit fixing of LT Earth Set, refilling the same and prov. earthing connection completein all respect. |
| 32 | Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 50mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 33 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 34 | 3. Replacement of lengthy services with AB cable in vill Dart & prov. 1 phase LT line to newly constructed houses in ES Tikkari UESD HPPSEBL Tauni Devi. T.S. no.126/2025-26 WBS no. 32100257-001-HMR-LT-354 : RCC Muff 2000mm Long with concrete filling |
| 35 | Anchoring Assembly for HT |
| 36 | Suspension Assembly for HT |
| 37 | Angle Iron 50X50X5 mm), ( Length-750 mm x1 Nos. Per Pole |
| 38 | Shackle Insulator (16 kN) |
| 39 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 40 | LT Stay Set Complete i/c stay clamp) |
| 41 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 42 | Half Clamp made of MS Flat 50x6mm |
| 43 | Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m} |
| 44 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 45 | façade hook |
| 46 | Aluminium Paint |
| 47 | LT egg insulator |
| 48 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 49 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 50 | Laying of cable, Stringing, Sagging complete in all respect. |
| 51 | Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 50mm² and binding with Insulators (3 wires) and fixing of jumper.complete in all respect. |
| 52 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 53 | 4. Prov. 1 ph-3 ph LT extension & aug. of 1 ph to 3-ph LT line under various DTR,s in ES Kale Amb UESD HPPSEBL Tauni Devi. T.S. no.199/2024-25 WBS no. 32100257-001-HMR-LT-326 : RCC Muff 2000mm Long with concrete filling |
| 54 | Angle Iron 50X50X5 mm), ( Length-750 mm x1 Nos. Per Pole |
| 55 | Shackle Insulator (16 kN) |
| 56 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 57 | LT Stay Set Complete i/c stay clamp) |
| 58 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 59 | LT earthing Set Complete i/c stay clamp) |
| 60 | Half Clamp made of MS Flat 50x6mm |
| 61 | Full Clamp made of M.S. Flat of size(50 x 6mm). |
| 62 | Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m} |
| 63 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 64 | Aluminium Paint |
| 65 | LT egg insulator |
| 66 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 67 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 68 | Erection of LT Earthing as per latest standard practices /specification of REC / HPSEBL including digging of pit fixing of LT Earth Set, refilling the same and prov. earthing connection completein all respect. |
| 69 | Laying of cable, Stringing, Sagging complete in all respect. |
| 70 | Laying of Conductor, Stringing, Sagging of AAAC 7/2.50mm² and binding with Insulators (3 wires) and fixing of jumper.complete in all respect. |
| 71 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 72 | Add Transportation charges/mannual carriage , loading unloding of material from site to store & store to site as instruction from Site Incharge complete job in all respect. Please Enable Macros to View BoQ information |