| 1 | Dismantling concrete Poles/RCC Poles/struts, any size and removing from the site as directed by Engineer in charge. |
| 2 | Supply and erection of Steel tubular swaged poles complete with base plate 8mm thick welded with pole, finial taper plug, bolt, nut and screws as specified type 410 SP-31 (9.00m long) including one coat of red-oxide zinc chrome primer and two coats of aluminium paint on surfaces exposed to view and making 30cm wide strips (total 5 Nos) with white and black paint alternately on external surface above PCC benching including numbering with black paint and painting with bituminous paint internally complete and externally for portion embedded in PCC including dismantling of old unsv any type of poles any length , complete all as specified and directed. (Note : Excavation, earth work and PCC shall be measrued and paid separately. |
| 3 | Plain cement concrete M-7.5 nominal mix, type D-2 using 40mm graded crushed stone aggregate as in foundation of poles, stays etc. as mass concrete, complete all as specified. |
| 4 | Plain cement concrete M-10 nominal mix, type C-1 using 20mm graded crushed stone aggregate as in coping of pole including necessary form work , complete all as specified. |
| 5 | Excavating in trenches in hard and dense soil, n exc 1.50 m wide and n exc 1.50 m in depth; for foundation, Cable laying . or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sqm on plan and n exc 1.5 m in depth and getting out complete all as specified and directed. |
| 6 | All as per srl item 5 above but depth exc 1.50m and not exc 3.00 metres for foundation and getting out in any type of soil, all as specified. |
| 7 | Returning filling in including spreading leveling, watering and well ramming in layers n. exc 25cm, all as specified. |
| 8 | Removal of excavated material to be distance n.exc 50M and depositing where directed at a level n.exc 1.5m high from the starting point, all as specified. |
| 9 | Sand cushioning to under ground cables, 8 cm thick layer before laying and testing the cable and 15 cm thick after laying and directed by Engr-in-Charge. |
| 10 | Supply and laying Sub class ‘B’bricks for covering to cable protection with width equal to the length of bricks complete all as specified and as directed. |
| 11 | Laying only old bricks in trenches as cable protection with width equal to the length of bricks complete all as specified and as directed. |
| 12 | Replacement of GI light grade pipe of 50mm dia with all fitting; laid in trenches, across road or pole for cable protection complete all as specified. |
| 13 | Taking out Old unserviceable, PVC insulated, PVC sheathed, armoured LT U/G cables, from trenches / duct / poles etc of any type & Size complete all as directed. Please Enable Macros to View BoQ information |
| 14 | Taking out Old unserviceable, PVC insulated, PVC sheathed, armoured LT U/G cables, from trenches / duct / poles etc of any type & Size complete all as directed. Please Enable Macros to View BoQ information |