|
| 1 | Taking up carefully from trenches/walls/pillar CI/DI water mains incl all fittings with spigot and socket ends incl joint/rubber gaskets/lead wool/tyton joint for the following sizes:- |
| 2 | (a) 80 mm bore. |
| 3 | (b) 100 mm bore. |
| 4 | (c) 150 mm bore. |
| 5 | (d) 200 mm bore. |
| 6 | (e) 250 mm bore. |
| 7 | (f) 350 mm bore. |
| 8 | (g) 400 mm bore. |
| 9 | Relaying, realigning the DI/CI pipe line with spigot and socket ends (in any length) on trench/surface/pillars with necessary fitments (tyton joint/rubber gasket,etc) for complete assembly of following sizes complete in all respect all as specified & directed by Engineer-in-charge. |
| 10 | (a) 80 mm bore. |
| 11 | (b) 100 mm bore. |
| 12 | (c) 150 mm bore. |
| 13 | (d) 200 mm bore. |
| 14 | (e) 250 mm bore. |
| 15 | (f) 350 mm bore. |
| 16 | (g) 400 mm bore. |
| 17 | Supply and laying ductile iron pipe with internal cement mortar lining and external zink pipes with class of pipe K-9 of following sizes:- |
| 18 | (a) 80 mm bore. |
| 19 | (b) 100 mm bore. |
| 20 | (c) 150 mm bore. |
| 21 | (d) 200 mm bore. |
| 22 | (e) 250 mm bore. |
| 23 | (f) 350 mm bore. |
| 24 | (g) 400 mm bore. |
| 25 | Excavating in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth for foundation etc or for shaft, wells, cesspits, manholes, pier holes etc not exceeding 10 sqm on plan and n exceeding 1.5 m in depth and in any type of soil complete all as specified & directed by Engineer-in-Charge. |
| 26 | Excavating in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth for foundation etc or for shafts, wells, cesspits, manholes, pier holes etc not exceeding 10 Sqm on plan and n exceeding 1.5 m in depth and getting out in soft/ disintegrated rock complete all as specified & directed by Engineer-in-Charge. |
| 27 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in any type of soil all as specified & directed by Engineer-in-Charge. |
| 28 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick with soft/ disintegrated rock all as specified & directed by Engineer-in-Charge. |
| 29 | Removing excavated soil to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified & directed by Engineer-in-Charge. |
| 30 | Removing excavated soft/ disintegrated rock to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified & directed by Engineer-in-Charge. |
| 31 | S & F butterfly valve, high pressure with crutch or butterfly handle for iron pipe or for unions including taking out unserviceable butterfly valve complete of follwing size all as specified and directed by Engineer-in-charge. |
| 32 | (a) 80 mm bore. |
| 33 | (b) 100 mm bore. |
| 34 | Taking down old u/s Sluice valve of any size complete all as specified & directed by Engineer-in-Charge. |
| 35 | Supply and fix Sluice valve PN-1.6 with SS spindle and wedge nut ISI maked (IS-14846:2000) complete with iron wheel of following sizes:-Note:- Rate includes neccesary arrangements and cutting the pipe of required dimension with attachments for fitting the sluice valve. |
| 36 | (a) 80 mm bore. |
| 37 | (b) 100 mm bore. |
| 38 | (c) 150 mm bore. |
| 39 | (d) 350 mm bore. |
| 40 | Fixing only Sluice valve (Schedule-'B' item) complete with iron wheel of following sizes:-Note:- (i) Rate includes neccesary arrangements and cutting the pipe of required dimension with attachments for fitting the sluice valve. (ii) Old u/s valve issued against sch of credit |
| 41 | (a) 200 mm bore. |
| 42 | (b) 250 mm bore. |
| 43 | M & L for fixing of gland in sluice valve complete of following sizes :- |
| 44 | (a) 80 mm bore. |
| 45 | (b) 100 mm bore. |
| 46 | (c) 150 mm bore. |
| 47 | (d) 200 mm bore. |
| 48 | (e) 250 mm bore. |
| 49 | (f) 350 mm bore. |
| 50 | (g) 400 mm bore. |
| 51 | M & L for taking out sluice valves refacing , regrinding and refixing alongwith rubber gasket complete of following sizes :- |
| 52 | (a) 80 mm bore. |
| 53 | (b) 100 mm bore. |
| 54 | (c) 150 mm bore. |
| 55 | (d) 200 mm bore. |
| 56 | (e) 250 mm bore. |
| 57 | (f) 350 mm bore. |
| 58 | (g) 400 mm bore. |
| 59 | M & L for taking out stainless steel spindle out of sluice valve and refixing it with new one including check nut with neccessay attachments to fit the existing valve complete for the following sizes :- |
| 60 | (a) 80 mm bore. |
| 61 | (b) 100 mm bore. |
| 62 | (c) 150 mm bore. |
| 63 | (d) 200 mm bore. |
| 64 | (e) 250 mm bore. |
| 65 | (f) 350 mm bore. |
| 66 | (g) 400 mm bore. |
| 67 | S & F in repairs foot valve cast iron assembly of following sizes:- |
| 68 | (a) 50 mm bore. |
| 69 | (b) 65 mm bore. |
| 70 | (c) 80 mm bore. |
| 71 | (d) 100 mm bore. |
| 72 | (e) 150 mm bore. |
| 73 | Repairs to foot valve (cast iron) by opening from suction line of pumpset , replacement of u/s rubber gasket sheet, nut boltsand refixing on existing position and testing of foot valve fuctioning of following sizes:- |
| 74 | (a) 50 mm bore. |
| 75 | (b) 65 mm bore. |
| 76 | (c) 80 mm bore. |
| 77 | (d) 100 mm bore. |
| 78 | (e) 150 mm bore. |
| 79 | Supply and fix in replacement cast iron non return (reflux) valve both flanged ends in swing type design as per IS 5312 Part-1, PN-1.0, of following sizes:- |
| 80 | (a) 80 mm bore. |
| 81 | (b) 100 mm bore. |
| 82 | (c) 150 mm bore. |
| 83 | Repairs to cast iron air release valve with two air outlet including replacement of washer, sheet ,lever mechanism and float , nut bolts as per existing capacity from DI pipeline complete of follwing sizes all as specified & directed by Engineer-in-charge. |
| 84 | (a) 100 mm |
| 85 | (b) 80 mm |
| 86 | (c) 65 mm |
| 87 | M&L in repair for fixing MS leakage clamps 150 mm in width made out of 6 mm thick MS Sheet in shape and size duly drilled 2 holes in each side with necessary rubber insertion sheet of required size and MS bolt,nuts & washers incl. excavation/earth work in any type of strata and dewatering of line water for prevention of water leakage from pipeline all as specified and directed suitable for following sizes of CI/DI pipelines:- |
| 88 | (a) 80 mm bore. |
| 89 | (b) 100 mm bore. |
| 90 | (c) 150 mm bore. |
| 91 | (d) 200 mm bore. |
| 92 | (e) 250 mm bore. |
| 93 | (f) 350 mm bore. |
| 94 | (g) 400 mm bore. |
| 95 | M & L for Burning of lead joint in position (old lead will be contractors property for which credit will be given separately) for the pipes of following sizes:- |
| 96 | (a) 80 mm bore. |
| 97 | (b) 100 mm bore. |
| 98 | (c) 150 mm bore. |
| 99 | (d) 400 mm bore. |
| 100 | S&F in replacement mechanical/Detachable/Victaulic joints(class 10) with nut bolts washers rubber gaskets etc suitable for CI/DI pipes of following sizes:- |
| 101 | (a) 80/100 mm bore. |
| 102 | (b) 150/200 mm bore. |
| 103 | (c) 250/300 mm bore. |
| 104 | (d) 350/400 mm bore. Please Enable Macros to View BoQ information |
| 105 | (d) 350/400 mm bore. Please Enable Macros to View BoQ information |