| 1 | Excavation in Soil (any type) using Hydraulic Excavator CK90 with \hydraulic excavator of 0.9 cum bucket capacity including cutting , trimming bottom and side slopes, in accordance with requirements of lines,grade sand cross sections, including all lifts and combined lead upto 30m |
| 2 | Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Double Flanged pipes with screwed flanged as per IS:8329- 2000, Class-K9 and laying the same in trenches to correct alignment and gradients, jointed with nut bolts and rubber insertion joints fitted complete including all cartage.200mm i/d pipe lines laid complete |
| 3 | Providing&fixingC.I/D.I Flangedend, stem of SS (AIS1410) and Bronze (gunmetal) working parts S luice Valves ISI marked 14846-2000, including jointing, testing & cost of Nut ,Bolt & insertion sheet, all carriage complete (with the approval of Engineer in charge).200mm i/d Sluice Valves flanged |
| 4 | Construction of masonary Sluice Valve Chamber excluding Sluice valve cover as per standard design &drawings of public health department. Size 0.9 m. x 0.9 m. |
| 5 | Cement concrete 1:3:6(a)with stone ballast or shingle (ii)mixing by mechanical means using concrete mixer volumetric type |
| 6 | Reinforced cement concrete M-30 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. |
| 7 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. |
| 8 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete in all respects. |
| 9 | Dismantling brick work tile, masonry or tile lining (b) In cement |
| 10 | Compaction Extra for laying earth/fly ash as per specifications in 20cm.Layer sand dressing but excluding cost of rolling. |
| 11 | Compaction Extra for laying earth/fly ash as per specifications in 20cm.Layer sand dressing but excluding cost of rolling. |
| 12 | Compaction Extra for laying earth/fly ash as per specifications in 20cm.Layer sand dressing but excluding cost of rolling. |
| 13 | Earthwork for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing. |
| 14 | Centering and shuttering for faces of walls, partitions, retaining wall sand the like (vertical or battering) including attached pilasters, buttresses etc when curved. |
| 15 | Any Other Item (CSR + SP) Please Enable Macros to View BoQ information |