| 1 | Earth work excavation in hard soil withen 50 met initial lead and 1.5 met lift including dressing and levelling the foundation bed….etc |
| 2 | Sand filling in foundation and plinth with well watered and and ramming ..etc |
| 3 | PCC (1:3:6) using 40 mm size CBHG metal in foundation and base including cost conveyance royality ..etc |
| 4 | RCC M20 using 12mm size C.B.H.G chips etc incl cost of all materials & Labours:- Ground Floor |
| 5 | Supplying, fitting,fixing & placing Uncoated HYSD bar reinforcement complete. |
| 6 | Rigid and smooth centering ,shuttering for R.C.C. work including false works and dismantling them after casting. Columns (Toilet) |
| 7 | Plinth Bend Toilet and Fitting Area |
| 8 | lintel (Toilet) |
| 9 | Wall beam (Toilet) |
| 10 | Slab (Toilet) |
| 11 | Brick work with FLY ASH.23x11x8 Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in foundationin and plinth including cost, carriage and royalty etc. (Toilet and Fitting Area) |
| 12 | Brick work with FLY ASH. Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in super structure including cost, carriage and royalty etc. (Toilet and Fitting Area) |
| 13 | 6 mm thick Cement Plaster with C.M (1:4) on ceiling including all cost, conveyance & royalty etc. complete. (Toilet) |
| 14 | 12 mm thick CP with CM (1:6) including all cost, conveyance & royalty etc all complete. (Toilet and Fitting Area) |
| 15 | 16 mm thick Cement Plaster with CM (1:6) including all cost, conveyance & royalty etc. complete. (Toilet and Fitting Area) |
| 16 | Supplying fitting fixing of M S door & window ….etc (Toilet) |
| 17 | Fixing Vetrified tiles in floors,treads of steps and landing on 20 mm thick bed of cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, labours T&P, rubbing and polishing etc all complete. (Toilet) |
| 18 | Fixing Ceramic tiles in dados skirting and risers of steps on 12 mm thick bed of cement plaster (1:3) jointed with neat cement slury mixed with pigments to match the shade of the tiles including rubbing and polishing etc all complete. (Toilet) |
| 19 | Finishing surface of wall with Acrilic Wall Putty (Water based) of approved make and finished smooth and even surface to received painting including cost of puty all labour T&P etc complete. (Toilet) |
| 20 | Priming one coat of Wall cement Primer (Water bound) including cost of primer all labour T&P etc complete. (Toilet) |
| 21 | Finishing wall painting two coats with any approved weather seal coat paint including all cost, carriage,royalty etc co (Toilet) |
| 22 | Finishing wall painting two coats with any approved weather seal coat paint including all cost, carriage,royalty etc co (Toilet) |
| 23 | Painting two coat with any approved paint on Iron work over a coat of priming including all cost,carriage,royalty etc omplete. (Ground Floor) Please Enable Macros to View BoQ information |