| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (including equivalent design mix). Including Supply of all material labour T & P etc required for proper completion of the work. |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 15.7.4 In cement mortar |
| 4 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: Channels, angles, tees and flats |
| 5 | Structural steel work riveted, bolted or welded in builtup sections, trusses and framed work, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer all complete. |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.)trussesetc, including cutting, hoisting, fixing in position and applying apriming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes |
| 7 | Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS:2222 in super structure above plinth level upto floor five level in cement mortar1:6(1cement:6coarse sand): With F.P.S.(nonmodular)bricks |
| 8 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm). Including Supply of all material labour T & P etc required for proper completion of the work. |
| 10 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 11 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour : New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 12 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound ) content less than 50 gram/ litre, of approved brand and manufacturer including applying additional coats wherever required to achieve even shade and colour Old work (one or more coats). Including Supply of all material labour T & P etc required for proper completion of the work. |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 15 | Dismantling old plaster or skirting/Dado raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 16 | 12 mm cement plaster of mix 1:6 (1 cement : 6 coarse sand) . Including Supply of all material labour T & P etc required for proper completion of the work. |
| 17 | 12 mm cement plaster of mix 1:4 (1 cement : 4 coarse sand) . Including Supply of all material labour T & P etc required for proper completion of the work. |
| 18 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work up to plinth level and in kerbs, steps and the like at or near ground level. 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). Including Supply of all material labour T & P etc required for proper completion of the work. |
| 19 | Attending minor type of repair for full day by engaging and supplying one suitable carpenter, Mistry/Mason/Plumber for carrying simple type of repairing of all work including all T&P etc. complete but excluding cost of material. |
| 20 | Supply Beldar/ Mali/Mazdoor for full day as per requirement for attending miscellaneous works as per direction of the Engineer In Charge for proper completion of the work in emergency with T&P as required. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 21 | Engaging & Operation of one tractore along with one driver & trolley having hydraulic jack arrangement. Including cost of fuel lubricants and repair maintenance etc complete in all respect as per direction of I/C. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 22 | Hire charges of welding machine with single phase with welder, helper and electrodes etc. for repair and welding of gates, door, window etc. for 8 hrs. in a day complete with all material labour, T&P etc. required for proper completion of work. (NSI) |
| 23 | Lettering with black Japan paint of approved brand and manufacture. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 24 | Re-lettering with black Japan paint of approved brand and manufacture. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 25 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 26 | Painting with aluminium paint of approved brand and manufacture to give an even shade. 13.63.1 Two or more coats on new work. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 27 | Painting with aluminium paint of approved brand and manufacture to give an even shade: 13.100.1 One or more coats on old work. Including Supply of all material labour T & P etc required for proper completion of the work. |
| 28 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer, 3mm thick water proofing membrane, black finished reinforced with glass fibre matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 ltr/sqm. by the same membrane manufactured of density at 25?C, 0.87 - 0.89 kg/ltr and viscocity 70 - 160 cps. Over the primer coat the layer of membrane shall be laid using butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 350/300 N/5cm. Tear strength in longitudinal and transverse direction as 60/80N. Softening point of membrane not less than 150°C.. Cold flexibility shall be upto -2 C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane: 3 mm thick. Including Supply of all material labour, T&P etc required for proper completion of the work. |
| 29 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1 cement : 4 fine sand) |
| 30 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction Please Enable Macros to View BoQ information |