|
| 1 | All in all comprehensive maintenance of various type air conditioners After Defect Laibility Period of Equipment including repair/replacement of compressor, condensing/ cooling coil, refrigerant piping, fan motor, remote, charging of refrigerant when ever required and periodical servicing as per EIC recommendations to meet out the efficient performance of the equipment. 1.0/1.5/2.0 Tr window type air conditioner |
| 2 | All in all comprehensive maintenance of various type airconditioners After Defect Laibility Period of Equipment including repair/replacement of compressor, condensing/ cooling coil, refrigerant piping, fan motor , remote, charging of refrigerant when ever required and periodical servicing as per EIC recommendations to meet out the efficient performance of the equipment.1.5/1.8/2.0 Tr Split type air conditioner |
| 3 | All in all comprehensive maintenance of various type airconditioners After Defect Laibility Period of Equipment including repair/replacement of compressor, condensing/ cooling coil, refrigerant piping, fan motor, remote, charging of refrigerant when ever required and periodical servicing as per EIC recommendations to meet out the efficient performance of the equipment.1.5/2.0/3.0/4.0 Tr Cassette type Split type air conditioner 1.5/2.0/3.0/4.0 Tr Cassette AC Split/ VRB type air conditioner |
| 4 | All in all comprehensive maintenance of various type airconditioners After Defect Laibility Period of Equipment including repair/replacement of compressor, condensing/ cooling coil, refrigerant piping, fan motor, remote, charging of refrigerant when ever required and periodical servicing as per EIC recommendations to meet out the efficient performance of the equipment.3.0/4.0/5.0 Tr Ductable type Split type air conditioner |
| 5 | SITC of Interconnecting refrigerant pipe work with closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications including chase cutting, supports etc. as required.6.35 mm |
| 6 | SITC of Interconnecting refrigerant pipe work with closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications including chase cutting, supports etc. as required 9.53 mm |
| 7 | SITC of Interconnecting refrigerant pipe work with closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications including chase cutting, supports etc. as required.12.7 mm |
| 8 | S & F of rigid CPVC (20mm) drain piping of 6 kg/ cm2 with 6mm thick nitrile rubber insulation. |
| 9 | S & F of rigid CPVC (25mm) drain piping of 6 kg/ cm2 with 6mm thick nitrile rubber insulation. |
| 10 | S & F of FR PVC insulated & sheathed 3 core flexible copper conductor ISI marked (IS:694) of 1.1 kV grade of 4.0 Sq.mm rating: |
| 11 | Supply & fixing MS powder coated stand suitable for 1.0/1.5/ 2.0 Tr outdoor type of Split AC. |
| 12 | Supply & fixing MS powder coated stand suitable for 2.5/3.0/4.0 Tr outdoor type of Split/Ductable/Tower AC. |
| 13 | Supply & fixing of Celdec pads FRP complete in all respect of Munter/ Hutech/ Ecocool |
| 14 | Removing/replacement, all in all comprehensive repairing of this removed 1.5 tr split type airconditioners including repair/replacement of compressor, condensing/cooling coil, refrigerant piping, fan motor, remote, charging of refrigerant when ever required for one year and periodical servicing as per EIC recommendations to meet out the efficient performance of the equipment and installation of this 1.5 tr split type airconditioners at required location as directed by EIC. |
| 15 | Removing/replacement, all in all comprehensive repairing of this removed 4.5 tr cassette type airconditioners including repair/replacement of compressor, condensing/cooling coil, refrigerant piping, fan motor, remote, charging of refrigerant when ever required for one year and periodical servicing as per EIC recommendations to meet out the efficient performance of the equipment and installation of this 4.5 tr cassette type airconditioners at required location as directed by EIC. Please Enable Macros to View BoQ information |