Name of Work:- नगर पालिका लक्ष्मंगढ़ मे कलाकृति बनाने का कार्य
Sl. No.
Item Description
1
Eagle-• Designing, Fabrication, Installation of Sculptures with all required machinery, purchase & carriage of Scrap/junk/discard Metal material The structure needs to be made with a minimum area as per below details, using the Scrap/junk/discard Metal material with electrical, mechanical & Art work.• Minimum Height – 5 feet• Minimum Depth – 2.5 feet• Minimum Length – 8 feet (Including basic plastered foundation work) Applying primer coats (two or more coats) of approved quality primer, painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing with all necessary work as per direction of work-in-charge.
2
Category 1 Artist
3
Assistant Artists
4
Architect (designer)
5
Specialized Painters
6
Welders
7
Helpers
8
Purchase of Scrap material (Approx.)
9
Material used for fabrication
10
Transportation of junk material (Tractor with trolly ,hydra and labour)
11
PU Paint and other painting material
12
MACHINERY (RENTAL FOR WELDING MACHINES GRINDR, BIG CUTTER, LASER CUTTING MACHINE
13
FLOOD LED LIGHTS FORM SECULPTURE LIGHTINING ELECTRIC WORK
14
BASE/ FOUNDATION WORK
15
GST 18 %
16
CONTRACTOR PROFIT 8 %
17
Peacock-• Designing, Fabrication, Installation of Sculptures with all required machinery, purchase & carriage of Scrap/junk/discard Metal material The structure needs to be made with a minimum area as per below details, using the Scrap/junk/discard Metal material with electrical, mechanical & Art work.• Minimum Height – 7 feet• Minimum Depth – 1.5 feet• Minimum Length – 5 feet (Including basic plastered foundation work) Applying primer coats (two or more coats) of approved quality primer, painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing with all necessary work as per direction of work-in-charge.
18
Category 1 Artist
19
Assistant Artists
20
Architect (designer)
21
Specialized Painters
22
Welders
23
Helpers
24
Purchase of Scrap material (Approx.)
25
Material used for fabrication
26
Transportation of junk material (Tractor with trolly ,hydra and labour)
27
PU Paint and other painting material
28
MACHINERY (RENTAL FOR WELDING MACHINES GRINDR, BIG CUTTER, LASER CUTTING MACHINE
29
FLOOD LED LIGHTS FORM SECULPTURE LIGHTINING ELECTRIC WORK
30
BASE/ FOUNDATION WORK
31
GST 18 %
32
CONTRACTOR PROFIT 8 % Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.