| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil: |
| 2 | Providing and Laying of stone soling hand packed in horizontal on level including cost of stones. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 7 | Foundations, footings, bases of columns etc. for mass concrete. |
| 8 | Suspended floors, roofs, landings, balconies and access platforms. |
| 9 | Edges of slabs and breaks in floors and walls : |
| 10 | Below 20 cm wide |
| 11 | Above 20 cm wide |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 13 | Carriage of different materials by Mechanical Transport including loading ,unloading and stacking from different sources upto site of work. |
| 14 | Sand for an average lead of 5km. |
| 15 | 40mm stone aggregate for an average lead of 5 km. |
| 16 | 20mm stone aggregate for an average lead of 5 km. |
| 17 | Stones/Stone Soling from for an average lead of 5 Km. Please Enable Macros to View BoQ information |