Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Supply & Installation of Manual Test Station complete with lower bend and with PCC foundation including terminal plate, diagram plate, cable identification ferrules and proper cable termination with lugs, numbering of Test Station etc. as per drawing & specification (with IP55) complete in all respect and per instruction of EIC. |
| 2 | Supply & Installation of Manual Test Station with out lower bend & with out PCC foundation including terminal plate, diagram plate, cable identification ferrules and proper cable termination with lugs, numbering of Test Station etc. as per drawing & specification (with IP55) complete in all respect and per instruction of EIC. |
| 3 | Shifting of Manual Test Station along with foundation and cable to suitable location as per instruction of EIC. (Excluding additional Cable if required). |
| 4 | Repairing of Manual Test Stations foundation with supply and replacement of foundation bolts and nuts including labour,tools,tackles consumeables like cement,sand aggregates etc complete in all respect as per scope of work, specifications and direction of EIC. |
| 5 | Repairing of Manual Test Stations including supply and replacement of damaged door, door locks,terminal plate ,diagram plate,neoprene gasket, brass links cable identification ferrules etc in Manual Test Station with proper cable termination, cable jointing,lugs with numbering of Test Station complete in all respect including labour,tools,tackles,consumeables like MS /brass bolts, nuts, washers,insulation tape etc.as per scope of work, specifications and the direction of EIC. |
| 6 | Supply & replacement of damaged/missing locks in Manual Test Station including labor, consumables, tools & tackles as per drawings, specifications & instructions of EIC. |
| 7 | Supply & replacement of damaged/missing doors in Manual Test Station including lock,neoprene gasket, diagram plate labor, consumables , tools & tackles as per drawings, specifications and instructions of EIC. |
| 8 | Supply & installation of damaged/missing terminal plates (all types) with M10 brass studs, washers, links, lugs & nuts, tools & tackles and consumables including labor as per instruction of EIC. |
| 9 | Supply and Fixing of diagram plate in the existing test station of all types complete in all respect including labour,tools,tackles ,consumeables etc. as per scope of work specifications and the direction of EIC. |
| 10 | Supply, installation, testing and commissioning of Anode Lead Junction Box (ALJB) including required backelite plate brass nut bolts, port type resistor & shunt arrangement, civil works with materials as per EIC. |
| 11 | Repairing of ALJB including supply of new locks and latch for the outer enclosure, shunt, variable resistance, brass links, ALJB doors including welding mechanical, fittings, hinges, labour, tools tackles, consumables like lugs, MS/Brass nuts, bolts, washers, insulation tape etc complete in all respect as per approved drawings,specification and as per direction of EIC. |
| 12 | Supply of 660/1100V grade single core ,stranded tinned copper conductor cables,XLPE insulated,PVC sheathed armoured cables of following sizes as per scope of work , specifications and direction of EIC of : |
| 13 | Size: 1C X 4 sq mm Cable. |
| 14 | Size: 1C X 6 sq mm Cable. |
| 15 | Size: 1C X 10 sq mm Cable. |
| 16 | Size: 1C X 16 sq mm Cable. |
| 17 | Size: 1C X 25 sq mm Cable. |
| 18 | Size: 1C X 35 sq mm Cable. |
| 19 | Cable laying of given Size ( XLPE armoured cable) inside the test station / over ground & under ground/inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of EIC of : |
| 20 | Size : 1 C x 4 SQ MM |
| 21 | Size : 1 C x 6 SQ MM |
| 22 | Size : 1 C x 10 SQ MM |
| 23 | Size : 1 C x 16 SQ MM |
| 24 | Size : 1 C x 25 SQ MM |
| 25 | Size : 1 C x 35 SQ MM |
| 26 | Cable jointing/ repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit (raychem/equivalent), termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for given Cable Size XLPE armoured Cu cable as per scope of work , specifications and directions of EIC of : |
| 27 | Size: 1 C x 4 sq mm |
| 28 | Size: 1 C x 6 sq mm |
| 29 | Size: 1 C x 10 sq mm |
| 30 | Size: 1 C x 16 sq mm |
| 31 | Size: 1 C x 25 sq mm |
| 32 | Size: 1 C x 35 sq mm |
| 33 | Making of Pipe to cable connection as per approved proedure, of all types of cable including excavation and backfilling, surface preparation, pipe to cable connection by means of pin brazing its encapsulation, holiday testing of the exposed section, labour, tools, tackles etc as per scope of work, specifications and direction of EIC . |
| 34 | Painting of Manual Test station including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 35 | Painting of Anode Lead Junction Box (ALJB)including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 36 | Painting of TR/CPPSM Units including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 37 | SUPPLY AND INSTALLATION OF Cu/CuSO4 PERMANENT REFERENCE CELL: Supply and installation of Cu/CuSO4 permanent reference cell having stability of +/-10mV with 3 micro amp load . The cell should be place in corrugated PVC pipe of min 80 mm dia, min 1.5 mtrs long for test point along with backfilled material like Gypsum 75% + Bentonite Powder 20% + Sodium Sulphate 05% prepacked in Cotton Bag of 8in dia x 16in long This also includes supply of required Qty , including jointing (MAKE: RAYCHEM OR 3M) of 4 sqmm PVC insulated, XLPE sheathed, Cu conductor cable with reference cable , excavation (by using pneumatic hammer / Elect concrete breaker on PCC/RCC wherever required as per hazardous area classification applicable) & back filling, tools, tackles, all other consumable/ material required to carry out the job as per technical specification, scope of work , drawings defined in the Tender document and as per direction of EIC. |
| 38 | Supply of portable Cu-CuSO4 Half cell for measuring of PSP (Pipe to Soil Potential) of Pipeline. |
| 39 | Supply & installation of explsoin proof spark gap arrestors make across insulating joints at SV/IP/RR/terminals including required cable, lugs, nuts & bolts, labor, tools & tackles, and sundry consumables. |
| 40 | Supply, Installation and Commissioning of Polarization Cell / Solid State Decoupler (SSD) along with the enclosure suitable for housing of Polarization Cells in all respect as per specification & directions of Engineer In charge. (Supply of cable, cable laying upto the test station, Cable Joint to pipe & Zn anode for grounding shall be treated as seperate, if required). Sonipat |
| 41 | Preventive Maintenence of Polarisation cells supply of KOH electrolyte / Solid State Decoupler (SSD), complete in all respect to make the cell in working condition and as per specifications and instructions of EIC. |
| 42 | Supply and installation of pre-packed Magnesium anodes with cable having weight 17 pounds including excavation, backfilling, cable laying up to test station and cable temination in test station, cable identification ferrules, with consumables labour etc. as per approved drawing, specification and direction of EIC. |
| 43 | Supply,replacement & installation of prepacked High Silicon Chromiunm/Iron Solid Anodes(22kg) of reputed make including excavation, backfilling, anode to tail cable connection, cable identification, coke breeze backfill complete with labor, tools & tackles as per drawings, specifications & instructions of EIC (item is applicable for Normal AGE not for Deep Well AGB) |
| 44 | Supply and Installation of pre packed Zinc grounding cell 22Kg (H-Type) including all tools, tackles, consumables, labour chemical back fill, excavation, backfilling, cable to insert joint , laying of tail cable, cable temination at TS complete and in all respect as per drawing, specification and asp er direction of EIC. |
| 45 | Supply and Installation of pre packed Zinc Grounding Anode (Weight: 17 lbs) including all tools, tackles, consumables, labour ,chemical back fill, excavation, backfilling, cable to insert joint , laying of tail cable, cable termination at TS complete and in all respect as per drawing, specification and as per direction of EIC. |
| 46 | Supply, installation,Testing and Commissioning of Deep Well Anode Ground Bed (MMO Titanium anodes). |
| 47 | Preventive maintenance of Anode Ground Bed -The scope of work includes necessary excavation for carrying out ground bed curing with 500 kg of common salt and water of 18 KL. The work includes necessary backfilling and restoration to the original condition as per the direction of EIC. The contractor shall measure the grounded resistance after the treatment of ground bed. The resistance of grounded after the maintenance shall be less than 01 ohm. |
| 48 | Supply, installation, comissioning of earthpits as per scope of work & enclosed drawing and specififcations including supply and installation of of GI Pipe earth electrode, salt, charcoal, sand and brick masonary work,excavation and backfilling in all type of soils and MS cover at the top. |
| 49 | Half-yearly Monitoring of Earthpits: Resistance measuring of earth-pit, pouring of water to bring down the resistance if required, painting, numbering and cleaning of connecting nuts and bolts, etc as per directions of EIC. Jobs also included painting/ pasting of Earthpit number, Resistance value, Grid Value, Testing date, Next due date on metallic plate, this plate is to be fixed on Earthpit chamber or chamber top plate or nearest structure, as per the instruction of GAIL Gas representative. (Approx. 320 earthpits, Rates to be quoted on Half yearly basis)(Qty is for two years) |
| 50 | Recharging of existing earth pits. Job includes supply of new GI Pipes, material and consumables, transportation of material and manpower, painting of top cover plates and numbering, recharging of earth pit by pouring sufficient salt, charcoal and water in it for bringing down the circuit resistance including making, necessary excavation, backfilling etc complete in all respect and as per directions of EIC. |
| 51 | Chamber Repair of Earth Pit. Job includes reconstruction of Earth pit chamber with raising the height of civil foundation, repair of cement plastering, painting of top cover plates and numbering the earthpit, charging the earth pit with common salt 50 Kg and water 100L for bringing down the circuit resistance including making necessary excavation, mixing & pouring of salt & water, replacement & cleaning of connecting nuts and bolts, etc complete in all respect and as per directions of EIC |
| 52 | Earthpit chamber MS Cover thickness 5 mm (Approx) (600 X 600 X 5), with collapsible lifting handle and painting. |
| 53 | Supply and installation of cable markers for underground cables and equipment as per the specifications. |
| 54 | Excavation & Backfilling of pipeline in all type of soils and ordinary rocks for a width of D+500 mm on each side of pipe and exposing the pipeline from top upto 500mm below the bottom of Pipeline including the stacking of excavated earth ,lead upto 50m,stacked earth to be levelled and neatly dressed 'as per the scope of work and directions of EIC. (IF RCC breaking and restoration is needed, payment of RCC quantity same shall be done in seperate SOR). Job includes excavation and restoration for Bell hole examinations. |
| 55 | Coating repair, Removing the old/ damaged coating/rust greese,moisture and all foreign material at defect material with scrapper,manual surface preparation using hand wire brush ,emery paper,scrappers or a combination of all processes,repairng of the coating with supply of raychem sleeves/cold applied tape/PERP/patch repair kit ,holiday testing after repair,as per the scope of work and to the entire satisfaction of EIC .Multiple patch repairing at one location within one meter span shall be trated as single quantity only.(Compensation if required to land owners shall be in the scope of contractor) |
| 56 | Quarterly Monitoring and Collection of data related to CP System from Manual Test Stations along the pipeline route including compilation and preperation of the reports in the office by a technically qualified person.Quarterly monitoring includes On-Off Potential Survey using current Interrupters twice in a year. Total length of pipeline for Firozabad is approximately 90 Km and rates to be quoted on quarterly basis. Monitoring of MTSs (310 Nos in Firozabad CGD) are for eight quarters. |
| 57 | Monthly Monitoring and Collection of data from TR / CPPSM Units including compilation and preperation of the reports in the office by a technically qualified person. Total numbers of TR/CPPSM unit is 6 (five). Monitoring of CPPSM/TR units are for 24 (twenty four) months. |
| 58 | Half-yearly Monitoring and Collection of data related to CP System from Anode Ground bed including compilation and preperation of the reports in the office by a technically qualified person. Total number of anode beds in Firozabad CGD is 6 and rates to be quoted on Half Yearly basis. Monitoring of Anode Beds (6 No in Firozabad CGD) are for Four Half-years. |
| 59 | Annual Monitoring and Collection of data related to CP System from Reference electrodes including compilation and preperation of the reports in the office by a technically qualified person. Total number of reference electrodes in Firozabad CGD are 18 and rates to be quoted on annual basis. Monitoring of reference electrodes (18 Nos in Firozabad CGD) are for two years. |
| 60 | Supply and Installation of Kriston make Solid State Polarisation Cell for AC De-coupling and AC interference suppression for pipeline |
| 61 | Design of Anode Ground Bed including Soil Resistivity Survey for specified locations |
| 62 | IJ SUPPLY JOINT,INSULATING, DESIGN PRESSURE- 49 Kg/cm2(g), DESIGN TEMP- 0°C to 65°C, BUTT-WELD AT BOTH ENDS, DESIGN CODE- ASME SECTION-VIII DIV-I, CORROSION ALLOWANCE-1.5 MM, HYDROSTATIC TEST PRESSURE- 76 Kg/cm2(g), CHARPY TEST(BODY, WELDING ENDS)- As per ASTM A 370, HARDNESS TEST REQUIRED AS PER SPEC.BIDDER HAS TO QUOTE & SUPPLY INSULATING JOINT, TEST CERTIFICATE OF THE PRODUCT TO BE PROVIDED WITH THE MATERIAL.GAIL GAS MAY WITNESS TEST & DO PRE DISPATCH INSPECTION OF MATERIAL. |
| 63 | 4 IN, BODY-ASTM A-694, F-52, PUPS- API 5L GR. X-52, 6.4 mm THK.(MIN.) |
| 64 | 2 IN, BODY-ASTM A-694, F-52, PUPS- API 5L GR. X-52, 6.4 mm THK.(MIN.) |
| 65 | Supply, Installation & Commissioning of Cu Earth Pits as per scope of work & enclosed drawing (Drawings No.- MEC/SD/05/E9/02/02 ) and specifications including supply and installation of copper plate, GI Pipe, salt, charcoal, sand and brick masonry work, excavation and backfilling in all type of soils and MS cover at the top, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc,. (Earthing Cable/ strip extra) any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 66 | Supply, Installation & Commissioning of Maintenance free Earth Pits as per scope of work & enclosed drawing. Chemical Earthpits at Firozabad GA which includes supply and installation of copper bonded solid steel rods made by high quality molecular bonding 99.9 % pure electrolytic copper on a low carbon, high tensile steel core with the bonding range of 250 micron, supply of earth enhancement materials, supply of copper bus bar, supply and construction of earthing Pit Chamber including supply of Pit cover, requisite SS nuts & bolts, soil excavation, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc, any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 67 | Supply & Laying/ Erection of 25 mm X 3 mm G.I strip at 0.50 metre below ground as strip including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm) including all associated civil work/ restoration and labour for Grid Fabrication of Existing Earth Pits as per IS 3043. |
| 68 | Testing of Insulation Joints by using Radio Frequency IJ Tester1.Contractor shall carryout testing of Insulation Joints to find shorting of Insulation Joints to find out shorting of Insulation Joints by using Radio Frequency IJ Tester.2.RF IJ Tester for carrying out IJ testing is in the scope of the Contractor. 3.Contractor shall provide Test Certificate of RF IJ tester before carrying out testing job. |
| 69 | Checking and Repairing of Cased Crossing |
| 70 | Carry out of Soil Resistivity Test by Wenner 4-Point Method along the steel pipeline @ 3KM interval including preparation and submission of report and review by authorized engineer as per the direction of E-I-C. |
| 71 | Breakdown maintenance :To carry out the breakdown maintenance/ complaints of TR units. EIC/SIC shall issue Job orders for attending breakdown maintenance, Immediately upon receiving such orders, the contractor shall make necessary arrangements and submit schedules thereof in line with the time frame given by EIC/SIC. The scope of work includes tracing out the fault in the TR unit, carrying out necessary repairs and rectification (including Main transformer Rewinding, or replacement of Gail supplied Control Cards or any of the issued Spares required to make the Unit Functional in all respects to get desired polarization Levels. The contractor should attend the break down call within 48 hours for diagnosis & if required, Activities to be performed as defined in the Tender document & as per direction of the EIC/SIC. |
| 72 | Supply and installation of Vent Pipe for cased crossing including excavations, backfilling with compactions, removing of old one, welding, painting, application of coating if required etc all complete as per the direction of EIC/SIC. |
| 73 | Supply and Installation of Cable Gland plate of required size to installed inside the pole opening at Manual Test Station as per direction of the EIC/SIC. |
| 74 | Supply & Installation of Manual Test Station complete with lower bend and with PCC foundation including terminal plate, diagram plate, cable identification ferrules and proper cable termination with lugs, numbering of Test Station etc. as per drawing & specification (with IP55) complete in all respect and per instruction of EIC. |
| 75 | Supply & Installation of Manual Test Station with out lower bend & with out PCC foundation including terminal plate, diagram plate, cable identification ferrules and proper cable termination with lugs, numbering of Test Station etc. as per drawing & specification (with IP55) complete in all respect and per instruction of EIC. |
| 76 | Shifting of Manual Test Station along with foundation and cable to suitable location as per instruction of EIC. (Excluding additional Cable if required). |
| 77 | Repairing of Manual Test Stations foundation with supply and replacement of foundation bolts and nuts including labour,tools,tackles consumeables like cement,sand aggregates etc complete in all respect as per scope of work, specifications and direction of EIC. |
| 78 | Repairing of Manual Test Stations including supply and replacement of damaged door, door locks,terminal plate ,diagram plate,neoprene gasket, brass links cable identification ferrules etc in Manual Test Station with proper cable termination, cable jointing,lugs with numbering of Test Station complete in all respect including labour,tools,tackles,consumeables like MS /brass bolts, nuts, washers,insulation tape etc.as per scope of work, specifications and the direction of EIC. |
| 79 | Supply & replacement of damaged/missing locks in Manual Test Station including labor, consumables, tools & tackles as per drawings, specifications & instructions of EIC. |
| 80 | Supply & replacement of damaged/missing doors in Manual Test Station including lock,neoprene gasket, diagram plate labor, consumables , tools & tackles as per drawings, specifications and instructions of EIC. |
| 81 | Supply & installation of damaged/missing terminal plates (all types) with M10 brass studs, washers, links, lugs & nuts, tools & tackles and consumables including labor as per instruction of EIC. |
| 82 | Supply and Fixing of diagram plate in the existing test station of all types complete in all respect including labour,tools,tackles ,consumeables etc. as per scope of work specifications and the direction of EIC. |
| 83 | Supply, installation, testing and commissioning of Anode Lead Junction Box (ALJB) including required backelite plate brass nut bolts, port type resistor & shunt arrangement, civil works with materials as per EIC. |
| 84 | Repairing of ALJB including supply of new locks and latch for the outer enclosure, shunt, variable resistance, brass links, ALJB doors including welding mechanical, fittings, hinges, labour, tools tackles, consumables like lugs, MS/Brass nuts, bolts, washers, insulation tape etc complete in all respect as per approved drawings,specification and as per direction of EIC. |
| 85 | Supply of 660/1100V grade single core ,stranded tinned copper conductor cables,XLPE insulated,PVC sheathed armoured cables of following sizes as per scope of work , specifications and direction of EIC of : |
| 86 | Size: 1C X 4 sq mm Cable. |
| 87 | Size: 1C X 6 sq mm Cable. |
| 88 | Size: 1C X 10 sq mm Cable. |
| 89 | Size: 1C X 16 sq mm Cable. |
| 90 | Size: 1C X 25 sq mm Cable. |
| 91 | Size: 1C X 35 sq mm Cable. |
| 92 | Cable laying of given Size ( XLPE armoured cable) inside the test station / over ground & under ground/inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of EIC of : |
| 93 | Size : 1 C x 4 SQ MM |
| 94 | Size : 1 C x 6 SQ MM |
| 95 | Size : 1 C x 10 SQ MM |
| 96 | Size : 1 C x 16 SQ MM |
| 97 | Size : 1 C x 25 SQ MM |
| 98 | Size : 1 C x 35 SQ MM |
| 99 | Cable jointing/ repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit (raychem/equivalent), termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for given Cable Size XLPE armoured Cu cable as per scope of work , specifications and directions of EIC of : |
| 100 | Size: 1 C x 4 sq mm |
| 101 | Size: 1 C x 6 sq mm |
| 102 | Size: 1 C x 10 sq mm |
| 103 | Size: 1 C x 16 sq mm |
| 104 | Size: 1 C x 25 sq mm |
| 105 | Size: 1 C x 35 sq mm |
| 106 | Making of Pipe to cable connection as per approved proedure, of all types of cable including excavation and backfilling, surface preparation, pipe to cable connection by means of pin brazing its encapsulation, holiday testing of the exposed section, labour, tools, tackles etc as per scope of work, specifications and direction of EIC . |
| 107 | Painting of Manual Test station including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 108 | Painting of Anode Lead Junction Box (ALJB)including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 109 | Painting of TR/CPPSM Units including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 110 | SUPPLY AND INSTALLATION OF Cu/CuSO4 PERMANENT REFERENCE CELL: Supply and installation of Cu/CuSO4 permanent reference cell having stability of +/-10mV with 3 micro amp load . The cell should be place in corrugated PVC pipe of min 80 mm dia, min 1.5 mtrs long for test point along with backfilled material like Gypsum 75% + Bentonite Powder 20% + Sodium Sulphate 05% prepacked in Cotton Bag of 8in dia x 16in long This also includes supply of required Qty , including jointing (MAKE: RAYCHEM OR 3M) of 4 sqmm PVC insulated, XLPE sheathed, Cu conductor cable with reference cable , excavation (by using pneumatic hammer / Elect concrete breaker on PCC/RCC wherever required as per hazardous area classification applicable) & back filling, tools, tackles, all other consumable/ material required to carry out the job as per technical specification, scope of work , drawings defined in the Tender document and as per direction of EIC. |
| 111 | Supply of portable Cu-CuSO4 Half cell for measuring of PSP (Pipe to Soil Potential) of Pipeline. |
| 112 | Supply & installation of explsoin proof spark gap arrestors make across insulating joints at SV/IP/RR/terminals including required cable, lugs, nuts & bolts, labor, tools & tackles, and sundry consumables. |
| 113 | Supply, Installation and Commissioning of Polarization Cell / Solid State Decoupler (SSD) along with the enclosure suitable for housing of Polarization Cells in all respect as per specification & directions of Engineer In charge. (Supply of cable, cable laying upto the test station, Cable Joint to pipe & Zn anode for grounding shall be treated as seperate, if required). Sonipat |
| 114 | Preventive Maintenence of Polarisation cells supply of KOH electrolyte / Solid State Decoupler (SSD), complete in all respect to make the cell in working condition and as per specifications and instructions of EIC. |
| 115 | Supply and installation of pre-packed Magnesium anodes with cable having weight 17 pounds including excavation, backfilling, cable laying up to test station and cable temination in test station, cable identification ferrules, with consumables labour etc. as per approved drawing, specification and direction of EIC. |
| 116 | Supply,replacement & installation of prepacked High Silicon Chromiunm/Iron Solid Anodes(22kg) of reputed make including excavation, backfilling, anode to tail cable connection, cable identification, coke breeze backfill complete with labor, tools & tackles as per drawings, specifications & instructions of EIC (item is applicable for Normal AGE not for Deep Well AGB) |
| 117 | Supply and Installation of pre packed Zinc grounding cell 22Kg (H-Type) including all tools, tackles, consumables, labour chemical back fill, excavation, backfilling, cable to insert joint , laying of tail cable, cable temination at TS complete and in all respect as per drawing, specification and asp er direction of EIC. |
| 118 | Supply and Installation of pre packed Zinc Grounding Anode (Weight: 17 lbs) including all tools, tackles, consumables, labour ,chemical back fill, excavation, backfilling, cable to insert joint , laying of tail cable, cable termination at TS complete and in all respect as per drawing, specification and as per direction of EIC. |
| 119 | Supply, installation,Testing and Commissioning of Deep Well Anode Ground Bed (MMO Titanium anodes). |
| 120 | Preventive maintenance of Anode Ground Bed -The scope of work includes necessary excavation for carrying out ground bed curing with 500 kg of common salt and water of 18 KL. The work includes necessary backfilling and restoration to the original condition as per the direction of EIC. The contractor shall measure the grounded resistance after the treatment of ground bed. The resistance of grounded after the maintenance shall be less than 01 ohm. |
| 121 | Supply, installation, comissioning of earthpits as per scope of work & enclosed drawing and specififcations including supply and installation of of GI Pipe earth electrode, salt, charcoal, sand and brick masonary work,excavation and backfilling in all type of soils and MS cover at the top. |
| 122 | Half-yearly Monitoring of Earthpits: Resistance measuring of earth-pit, pouring of water to bring down the resistance if required, painting, numbering and cleaning of connecting nuts and bolts, etc as per directions of EIC. Jobs also included painting/ pasting of Earthpit number, Resistance value, Grid Value, Testing date, Next due date on metallic plate, this plate is to be fixed on Earthpit chamber or chamber top plate or nearest structure, as per the instruction of GAIL Gas representative. Rates to be quoted on Half yearly basis(Qty is for two years) |
| 123 | Recharging of existing earth pits. Job includes supply of new GI Pipes, material and consumables, transportation of material and manpower, painting of top cover plates and numbering, recharging of earth pit by pouring sufficient salt, charcoal and water in it for bringing down the circuit resistance including making, necessary excavation, backfilling etc complete in all respect and as per directions of EIC. |
| 124 | Chamber Repair of Earth Pit. Job includes reconstruction of Earth pit chamber with raising the height of civil foundation, repair of cement plastering, painting of top cover plates and numbering the earthpit, charging the earth pit with common salt 50 Kg and water 100L for bringing down the circuit resistance including making necessary excavation, mixing & pouring of salt & water, replacement & cleaning of connecting nuts and bolts, etc complete in all respect and as per directions of EIC |
| 125 | Earthpit chamber MS Cover thickness 5 mm (Approx) (600 X 600 X 5), with collapsible lifting handle and painting. |
| 126 | Supply and installation of cable markers for underground cables and equipment as per the specifications. |
| 127 | Excavation & Backfilling of pipeline in all type of soils and ordinary rocks for a width of D+500 mm on each side of pipe and exposing the pipeline from top upto 500mm below the bottom of Pipeline including the stacking of excavated earth ,lead upto 50m,stacked earth to be levelled and neatly dressed 'as per the scope of work and directions of EIC. (IF RCC breaking and restoration is needed, payment of RCC quantity same shall be done in seperate SOR). Job includes excavation and restoration for Bell hole examinations. |
| 128 | Coating repair, Removing the old/ damaged coating/rust greese,moisture and all foreign material at defect material with scrapper,manual surface preparation using hand wire brush ,emery paper,scrappers or a combination of all processes,repairng of the coating with supply of raychem sleeves/cold applied tape/PERP/patch repair kit ,holiday testing after repair,as per the scope of work and to the entire satisfaction of EIC .Multiple patch repairing at one location within one meter span shall be trated as single quantity only.(Compensation if required to land owners shall be in the scope of contractor) |
| 129 | Quarterly Monitoring and Collection of data related to CP System from Manual Test Stations along the pipeline route including compilation and preperation of the reports in the office by a technically qualified person.Quarterly monitoring includes On-Off Potential Survey using current Interrupters twice in a year. rates to be quoted on quarterly basis. Monitoring of MTSs are for eight quarters. |
| 130 | Monthly Monitoring and Collection of data from TR / CPPSM Units including compilation and preperation of the reports in the office by a technically qualified person. Monitoring of CPPSM/TR units are for 24 (twenty four) months. |
| 131 | Half-yearly Monitoring and Collection of data related to CP System from Anode Ground bed including compilation and preperation of the reports in the office by a technically qualified person. Total number of anode beds in Agra CGD is 5 and rates to be quoted on Half Yearly basis. Monitoring of Anode Beds (are for Four Half-years. |
| 132 | Annual Monitoring and Collection of data related to CP System from Reference electrodes including compilation and preperation of the reports in the office by a technically qualified person. rates to be quoted on annual basis. Monitoring of reference electrodes are for two years. |
| 133 | Supply and Installation of Kriston make Solid State Polarisation Cell for AC De-coupling and AC interference suppression for pipeline |
| 134 | Design of Anode Ground Bed including Soil Resistivity Survey for specified locations |
| 135 | IJ SUPPLY JOINT,INSULATING, DESIGN PRESSURE- 49 Kg/cm2(g), DESIGN TEMP- 0°C to 65°C, BUTT-WELD AT BOTH ENDS, DESIGN CODE- ASME SECTION-VIII DIV-I, CORROSION ALLOWANCE-1.5 MM, HYDROSTATIC TEST PRESSURE- 76 Kg/cm2(g), CHARPY TEST(BODY, WELDING ENDS)- As per ASTM A 370, HARDNESS TEST REQUIRED AS PER SPEC.BIDDER HAS TO QUOTE & SUPPLY INSULATING JOINT, TEST CERTIFICATE OF THE PRODUCT TO BE PROVIDED WITH THE MATERIAL.GAIL GAS MAY WITNESS TEST & DO PRE DISPATCH INSPECTION OF MATERIAL. |
| 136 | 4 IN, BODY-ASTM A-694, F-52, PUPS- API 5L GR. X-52, 6.4 mm THK.(MIN.) |
| 137 | 2 IN, BODY-ASTM A-694, F-52, PUPS- API 5L GR. X-52, 6.4 mm THK.(MIN.) |
| 138 | Supply, Installation & Commissioning of Cu Earth Pits as per scope of work & enclosed drawing (Drawings No.- MEC/SD/05/E9/02/02 ) and specifications including supply and installation of copper plate, GI Pipe, salt, charcoal, sand and brick masonry work, excavation and backfilling in all type of soils and MS cover at the top, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc,. (Earthing Cable/ strip extra) any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 139 | Supply, Installation & Commissioning of Maintenance free Earth Pits as per scope of work & enclosed drawing. Chemical Earthpits at Firozabad GA which includes supply and installation of copper bonded solid steel rods made by high quality molecular bonding 99.9 % pure electrolytic copper on a low carbon, high tensile steel core with the bonding range of 250 micron, supply of earth enhancement materials, supply of copper bus bar, supply and construction of earthing Pit Chamber including supply of Pit cover, requisite SS nuts & bolts, soil excavation, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc, any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 140 | Supply & Laying/ Erection of 25 mm X 3 mm G.I strip at 0.50 metre below ground as strip including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm) including all associated civil work/ restoration and labour for Grid Fabrication of Existing Earth Pits as per IS 3043. |
| 141 | Testing of Insulation Joints by using Radio Frequency IJ Tester1.Contractor shall carryout testing of Insulation Joints to find shorting of Insulation Joints to find out shorting of Insulation Joints by using Radio Frequency IJ Tester.2.RF IJ Tester for carrying out IJ testing is in the scope of the Contractor. 3.Contractor shall provide Test Certificate of RF IJ tester before carrying out testing job. |
| 142 | Checking and Repairing of Cased Crossing |
| 143 | Carry out of Soil Resistivity Test by Wenner 4-Point Method along the steel pipeline @ 3KM interval including preparation and submission of report and review by authorized engineer as per the direction of E-I-C. |
| 144 | Breakdown maintenance :To carry out the breakdown maintenance/ complaints of TR units. EIC/SIC shall issue Job orders for attending breakdown maintenance, Immediately upon receiving such orders, the contractor shall make necessary arrangements and submit schedules thereof in line with the time frame given by EIC/SIC. The scope of work includes tracing out the fault in the TR unit, carrying out necessary repairs and rectification (including Main transformer Rewinding, or replacement of Gail supplied Control Cards or any of the issued Spares required to make the Unit Functional in all respects to get desired polarization Levels. The contractor should attend the break down call within 48 hours for diagnosis & if required, Activities to be performed as defined in the Tender document & as per direction of the EIC/SIC. |
| 145 | Supply and installation of Vent Pipe for cased crossing including excavations, backfilling with compactions, removing of old one, welding, painting, application of coating if required etc all complete as per the direction of EIC/SIC. |
| 146 | Supply and Installation of Cable Gland plate of required size to installed inside the pole opening at Manual Test Station as per direction of the EIC/SIC. |
| 147 | Supply & Installation of Manual Test Station complete with lower bend and with PCC foundation including terminal plate, diagram plate, cable identification ferrules and proper cable termination with lugs, numbering of Test Station etc. as per drawing & specification (with IP55) complete in all respect and per instruction of EIC. |
| 148 | Supply & Installation of Manual Test Station with out lower bend & with out PCC foundation including terminal plate, diagram plate, cable identification ferrules and proper cable termination with lugs, numbering of Test Station etc. as per drawing & specification (with IP55) complete in all respect and per instruction of EIC. |
| 149 | Shifting of Manual Test Station along with foundation and cable to suitable location as per instruction of EIC. (Excluding additional Cable if required). |
| 150 | Repairing of Manual Test Stations foundation with supply and replacement of foundation bolts and nuts including labour,tools,tackles consumeables like cement,sand aggregates etc complete in all respect as per scope of work, specifications and direction of EIC. |
| 151 | Repairing of Manual Test Stations including supply and replacement of damaged door, door locks,terminal plate ,diagram plate,neoprene gasket, brass links cable identification ferrules etc in Manual Test Station with proper cable termination, cable jointing,lugs with numbering of Test Station complete in all respect including labour,tools,tackles,consumeables like MS /brass bolts, nuts, washers,insulation tape etc.as per scope of work, specifications and the direction of EIC. |
| 152 | Supply & replacement of damaged/missing locks in Manual Test Station including labor, consumables, tools & tackles as per drawings, specifications & instructions of EIC. |
| 153 | Supply & replacement of damaged/missing doors in Manual Test Station including lock,neoprene gasket, diagram plate labor, consumables , tools & tackles as per drawings, specifications and instructions of EIC. |
| 154 | Supply & installation of damaged/missing terminal plates (all types) with M10 brass studs, washers, links, lugs & nuts, tools & tackles and consumables including labor as per instruction of EIC. |
| 155 | Supply and Fixing of diagram plate in the existing test station of all types complete in all respect including labour,tools,tackles ,consumeables etc. as per scope of work specifications and the direction of EIC. |
| 156 | Supply, installation, testing and commissioning of Anode Lead Junction Box (ALJB) including required backelite plate brass nut bolts, port type resistor & shunt arrangement, civil works with materials as per EIC. |
| 157 | Repairing of ALJB including supply of new locks and latch for the outer enclosure, shunt, variable resistance, brass links, ALJB doors including welding mechanical, fittings, hinges, labour, tools tackles, consumables like lugs, MS/Brass nuts, bolts, washers, insulation tape etc complete in all respect as per approved drawings,specification and as per direction of EIC. |
| 158 | Supply of 660/1100V grade single core ,stranded tinned copper conductor cables,XLPE insulated,PVC sheathed armoured cables of following sizes as per scope of work , specifications and direction of EIC of : |
| 159 | Size: 1C X 4 sq mm Cable. |
| 160 | Size: 1C X 6 sq mm Cable. |
| 161 | Size: 1C X 10 sq mm Cable. |
| 162 | Size: 1C X 16 sq mm Cable. |
| 163 | Size: 1C X 25 sq mm Cable. |
| 164 | Size: 1C X 35 sq mm Cable. |
| 165 | Cable laying of given Size ( XLPE armoured cable) inside the test station / over ground & under ground/inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of EIC of : |
| 166 | Size : 1 C x 4 SQ MM |
| 167 | Size : 1 C x 6 SQ MM |
| 168 | Size : 1 C x 10 SQ MM |
| 169 | Size : 1 C x 16 SQ MM |
| 170 | Size : 1 C x 25 SQ MM |
| 171 | Size : 1 C x 35 SQ MM |
| 172 | Cable jointing/ repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit (raychem/equivalent), termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for given Cable Size XLPE armoured Cu cable as per scope of work , specifications and directions of EIC of : |
| 173 | Size: 1 C x 4 sq mm |
| 174 | Size: 1 C x 6 sq mm |
| 175 | Size: 1 C x 10 sq mm |
| 176 | Size: 1 C x 16 sq mm |
| 177 | Size: 1 C x 25 sq mm |
| 178 | Size: 1 C x 35 sq mm |
| 179 | Making of Pipe to cable connection as per approved proedure, of all types of cable including excavation and backfilling, surface preparation, pipe to cable connection by means of pin brazing its encapsulation, holiday testing of the exposed section, labour, tools, tackles etc as per scope of work, specifications and direction of EIC . |
| 180 | Painting of Manual Test station including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 181 | Painting of Anode Lead Junction Box (ALJB)including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 182 | Painting of TR/CPPSM Units including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 183 | SUPPLY AND INSTALLATION OF Cu/CuSO4 PERMANENT REFERENCE CELL: Supply and installation of Cu/CuSO4 permanent reference cell having stability of +/-10mV with 3 micro amp load . The cell should be place in corrugated PVC pipe of min 80 mm dia, min 1.5 mtrs long for test point along with backfilled material like Gypsum 75% + Bentonite Powder 20% + Sodium Sulphate 05% prepacked in Cotton Bag of 8in dia x 16in long This also includes supply of required Qty , including jointing (MAKE: RAYCHEM OR 3M) of 4 sqmm PVC insulated, XLPE sheathed, Cu conductor cable with reference cable , excavation (by using pneumatic hammer / Elect concrete breaker on PCC/RCC wherever required as per hazardous area classification applicable) & back filling, tools, tackles, all other consumable/ material required to carry out the job as per technical specification, scope of work , drawings defined in the Tender document and as per direction of EIC. |
| 184 | Supply of portable Cu-CuSO4 Half cell for measuring of PSP (Pipe to Soil Potential) of Pipeline. |
| 185 | Supply & installation of explsoin proof spark gap arrestors make across insulating joints at SV/IP/RR/terminals including required cable, lugs, nuts & bolts, labor, tools & tackles, and sundry consumables. |
| 186 | Supply, Installation and Commissioning of Polarization Cell / Solid State Decoupler (SSD) along with the enclosure suitable for housing of Polarization Cells in all respect as per specification & directions of Engineer In charge. (Supply of cable, cable laying upto the test station, Cable Joint to pipe & Zn anode for grounding shall be treated as seperate, if required). |
| 187 | Preventive Maintenence of Polarisation cells supply of KOH electrolyte / Solid State Decoupler (SSD), complete in all respect to make the cell in working condition and as per specifications and instructions of EIC. |
| 188 | Supply and installation of pre-packed Magnesium anodes with cable having weight 17 pounds including excavation, backfilling, cable laying up to test station and cable temination in test station, cable identification ferrules, with consumables labour etc. as per approved drawing, specification and direction of EIC. |
| 189 | Supply,replacement & installation of prepacked High Silicon Chromiunm/Iron Solid Anodes(22kg) of reputed make including excavation, backfilling, anode to tail cable connection, cable identification, coke breeze backfill complete with labor, tools & tackles as per drawings, specifications & instructions of EIC (item is applicable for Normal AGE not for Deep Well AGB) |
| 190 | Supply and Installation of pre packed Zinc grounding cell 22Kg (H-Type) including all tools, tackles, consumables, labour chemical back fill, excavation, backfilling, cable to insert joint , laying of tail cable, cable temination at TS complete and in all respect as per drawing, specification and asp er direction of EIC. |
| 191 | Supply and Installation of pre packed Zinc Grounding Anode (Weight: 17 lbs) including all tools, tackles, consumables, labour ,chemical back fill, excavation, backfilling, cable to insert joint , laying of tail cable, cable termination at TS complete and in all respect as per drawing, specification and as per direction of EIC. |
| 192 | Supply, installation,Testing and Commissioning of Deep Well Anode Ground Bed (MMO Titanium anodes). |
| 193 | Preventive maintenance of Anode Ground Bed -The scope of work includes necessary excavation for carrying out ground bed curing with 500 kg of common salt and water of 18 KL. The work includes necessary backfilling and restoration to the original condition as per the direction of EIC. The contractor shall measure the grounded resistance after the treatment of ground bed. The resistance of grounded after the maintenance shall be less than 01 ohm. |
| 194 | Supply, installation, comissioning of earthpits as per scope of work & enclosed drawing and specififcations including supply and installation of of GI Pipe earth electrode, salt, charcoal, sand and brick masonary work,excavation and backfilling in all type of soils and MS cover at the top. |
| 195 | Half-yearly Monitoring of Earthpits: Resistance measuring of earth-pit, pouring of water to bring down the resistance if required, painting, numbering and cleaning of connecting nuts and bolts, etc as per directions of EIC. Jobs also included painting/ pasting of Earthpit number, Resistance value, Grid Value, Testing date, Next due date on metallic plate, this plate is to be fixed on Earthpit chamber or chamber top plate or nearest structure, as per the instruction of GAIL Gas representative. (Approx. 60 earthpits, Rates to be quoted on Half yearly basis)(Qty is for two years) |
| 196 | Recharging of existing earth pits. Job includes supply of new GI Pipes, material and consumables, transportation of material and manpower, painting of top cover plates and numbering, recharging of earth pit by pouring sufficient salt, charcoal and water in it for bringing down the circuit resistance including making, necessary excavation, backfilling etc complete in all respect and as per directions of EIC. |
| 197 | Chamber Repair of Earth Pit. Job includes reconstruction of Earth pit chamber with raising the height of civil foundation, repair of cement plastering, painting of top cover plates and numbering the earthpit, charging the earth pit with common salt 50 Kg and water 100L for bringing down the circuit resistance including making necessary excavation, mixing & pouring of salt & water, replacement & cleaning of connecting nuts and bolts, etc complete in all respect and as per directions of EIC |
| 198 | Earthpit chamber MS Cover thickness 5 mm (Approx), with collapsible lifting handle and painting. |
| 199 | Supply and installation of cable markers for underground cables and equipment as per the specifications. |
| 200 | Excavation & Backfilling of pipeline in all type of soils and ordinary rocks for a width of D+500 mm on each side of pipe and exposing the pipeline from top upto 500mm below the bottom of Pipeline including the stacking of excavated earth ,lead upto 50m,stacked earth to be levelled and neatly dressed 'as per the scope of work and directions of EIC. (IF RCC breaking and restoration is needed, payment of RCC quantity same shall be done in seperate SOR). Job includes excavation and restoration for Bell hole examinations. |
| 201 | Coating repair, Removing the old/ damaged coating/rust greese,moisture and all foreign material at defect material with scrapper,manual surface preparation using hand wire brush ,emery paper,scrappers or a combination of all processes,repairng of the coating with supply of raychem sleeves/cold applied tape/PERP/patch repair kit ,holiday testing after repair,as per the scope of work and to the entire satisfaction of EIC .Multiple patch repairing at one location within one meter span shall be trated as single quantity only.(Compensation if required to land owners shall be in the scope of contractor) |
| 202 | Quarterly Monitoring and Collection of data related to CP System from Manual Test Stations along the pipeline route including compilation and preperation of the reports in the office by a technically qualified person.Quarterly monitoring includes On-Off Potential Survey using current Interrupters twice in a year. Total length of pipeline for Bharatpur is approximately 52 Km and rates to be quoted on quarterly basis. Monitoring of MTSs (65 Nos in Bharatpur CGD) are for eight quarters. |
| 203 | Monthly Monitoring and Collection of data from TR / CPPSM Units including compilation and preperation of the reports in the office by a technically qualified person. Total numbers of TR/CPPSM unit is 1 (one). Monitoring of CPPSM/TR units are for 24 (twenty four) months. |
| 204 | Half-yearly Monitoring and Collection of data related to CP System from Anode Ground bed including compilation and preperation of the reports in the office by a technically qualified person. Total number of anode beds in Bharatpur CGD is 1 and rates to be quoted on Half Yearly basis. Monitoring of Anode Beds (1 No in Bharatpur CGD) are for Four Half-years. |
| 205 | Annual Monitoring and Collection of data related to CP System from Reference electrodes including compilation and preperation of the reports in the office by a technically qualified person. Total number of reference electrodes in Bharatpur CGD are 3 and rates to be quoted on annual basis. Monitoring of reference electrodes (3 Nos in Bharatpur CGD) are for two years. |
| 206 | Supply and Installation of Kriston make Solid State Polarisation Cell for AC De-coupling and AC interference suppression for pipeline |
| 207 | Design of Anode Ground Bed including Soil Resistivity Survey for specified locations |
| 208 | IJ SUPPLY JOINT,INSULATING, DESIGN PRESSURE- 49 Kg/cm2(g), DESIGN TEMP- 0°C to 65°C, BUTT-WELD AT BOTH ENDS, DESIGN CODE- ASME SECTION-VIII DIV-I, CORROSION ALLOWANCE-1.5 MM, HYDROSTATIC TEST PRESSURE- 76 Kg/cm2(g), CHARPY TEST(BODY, WELDING ENDS)- As per ASTM A 370, HARDNESS TEST REQUIRED AS PER SPEC.BIDDER HAS TO QUOTE & SUPPLY INSULATING JOINT, TEST CERTIFICATE OF THE PRODUCT TO BE PROVIDED WITH THE MATERIAL.GAIL GAS MAY WITNESS TEST & DO PRE DISPATCH INSPECTION OF MATERIAL. |
| 209 | 4 IN, BODY-ASTM A-694, F-52, PUPS- API 5L GR. X-52, 6.4 mm THK.(MIN.) |
| 210 | 2 IN, BODY-ASTM A-694, F-52, PUPS- API 5L GR. X-52, 6.4 mm THK.(MIN.) |
| 211 | Supply, Installation & Commissioning of Cu Earth Pits as per scope of work & enclosed drawing (Drawings No.- MEC/SD/05/E9/02/02 ) and specifications including supply and installation of copper plate, GI Pipe, salt, charcoal, sand and brick masonry work, excavation and backfilling in all type of soils and MS cover at the top, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc,. (Earthing Cable/ strip extra) any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 212 | Supply, Installation & Commissioning of Maintenance free Earth Pits as per scope of work & enclosed drawing. Chemical Earthpits at Firozabad GA which includes supply and installation of copper bonded solid steel rods made by high quality molecular bonding 99.9 % pure electrolytic copper on a low carbon, high tensile steel core with the bonding range of 250 micron, supply of earth enhancement materials, supply of copper bus bar, supply and construction of earthing Pit Chamber including supply of Pit cover, requisite SS nuts & bolts, soil excavation, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc, any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 213 | Supply & Laying/ Erection of 25 mm X 3 mm G.I strip at 0.50 metre below ground as strip including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm) including all associated civil work/ restoration and labour for Grid Fabrication of Existing Earth Pits as per IS 3043. |
| 214 | Testing of Insulation Joints by using Radio Frequency IJ Tester1.Contractor shall carryout testing of Insulation Joints to find shorting of Insulation Joints to find out shorting of Insulation Joints by using Radio Frequency IJ Tester.2.RF IJ Tester for carrying out IJ testing is in the scope of the Contractor. 3.Contractor shall provide Test Certificate of RF IJ tester before carrying out testing job. |
| 215 | Checking and Repairing of Cased Crossing |
| 216 | Carry out of Soil Resistivity Test by Wenner 4-Point Method along the steel pipeline @ 3KM interval including preparation and submission of report and review by authorized engineer as per the direction of E-I-C. |
| 217 | Breakdown maintenance :To carry out the breakdown maintenance/ complaints of TR units. EIC/SIC shall issue Job orders for attending breakdown maintenance, Immediately upon receiving such orders, the contractor shall make necessary arrangements and submit schedules thereof in line with the time frame given by EIC/SIC. The scope of work includes tracing out the fault in the TR unit, carrying out necessary repairs and rectification (including Main transformer Rewinding, or replacement of Gail supplied Control Cards or any of the issued Spares required to make the Unit Functional in all respects to get desired polarization Levels. The contractor should attend the break down call within 48 hours for diagnosis & if required, Activities to be performed as defined in the Tender document & as per direction of the EIC/SIC. |
| 218 | Supply and installation of Vent Pipe for cased crossing including excavations, backfilling with compactions, removing of old one, welding, painting, application of coating if required etc all complete as per the direction of EIC/SIC. |
| 219 | Supply and Installation of Cable Gland plate of required size to installed inside the pole opening at Manual Test Station as per direction of the EIC/SIC. |
| 220 | Supply & Installation of Manual Test Station complete with lower bend and with PCC foundation including terminal plate, diagram plate, cable identification ferrules and proper cable termination with lugs, numbering of Test Station etc. as per drawing & specification (with IP55) complete in all respect and per instruction of EIC. |
| 221 | Supply & Installation of Manual Test Station with out lower bend & with out PCC foundation including terminal plate, diagram plate, cable identification ferrules and proper cable termination with lugs, numbering of Test Station etc. as per drawing & specification (with IP55) complete in all respect and per instruction of EIC. |
| 222 | Shifting of Manual Test Station along with foundation and cable to suitable location as per instruction of EIC. (Excluding additional Cable if required). |
| 223 | Repairing of Manual Test Stations foundation with supply and replacement of foundation bolts and nuts including labour,tools,tackles consumeables like cement,sand aggregates etc complete in all respect as per scope of work, specifications and direction of EIC. |
| 224 | Repairing of Manual Test Stations including supply and replacement of damaged door, door locks,terminal plate ,diagram plate,neoprene gasket, brass links cable identification ferrules etc in Manual Test Station with proper cable termination, cable jointing,lugs with numbering of Test Station complete in all respect including labour,tools,tackles,consumeables like MS /brass bolts, nuts, washers,insulation tape etc.as per scope of work, specifications and the direction of EIC. |
| 225 | Supply & replacement of damaged/missing locks in Manual Test Station including labor, consumables, tools & tackles as per drawings, specifications & instructions of EIC. |
| 226 | Supply & replacement of damaged/missing doors in Manual Test Station including lock,neoprene gasket, diagram plate labor, consumables , tools & tackles as per drawings, specifications and instructions of EIC. |
| 227 | Supply & installation of damaged/missing terminal plates (all types) with M10 brass studs, washers, links, lugs & nuts, tools & tackles and consumables including labor as per instruction of EIC. |
| 228 | Supply and Fixing of diagram plate in the existing test station of all types complete in all respect including labour,tools,tackles ,consumeables etc. as per scope of work specifications and the direction of EIC. |
| 229 | Supply, installation, testing and commissioning of Anode Lead Junction Box (ALJB) including required backelite plate brass nut bolts, port type resistor & shunt arrangement, civil works with materials as per EIC. |
| 230 | Repairing of ALJB including supply of new locks and latch for the outer enclosure, shunt, variable resistance, brass links, ALJB doors including welding mechanical, fittings, hinges, labour, tools tackles, consumables like lugs, MS/Brass nuts, bolts, washers, insulation tape etc complete in all respect as per approved drawings,specification and as per direction of EIC. |
| 231 | Supply of 660/1100V grade single core ,stranded tinned copper conductor cables,XLPE insulated,PVC sheathed armoured cables of following sizes as per scope of work , specifications and direction of EIC of : |
| 232 | Size: 1C X 4 sq mm Cable. |
| 233 | Size: 1C X 6 sq mm Cable. |
| 234 | Size: 1C X 10 sq mm Cable. |
| 235 | Size: 1C X 16 sq mm Cable. |
| 236 | Size: 1C X 25 sq mm Cable. |
| 237 | Size: 1C X 35 sq mm Cable. |
| 238 | Cable laying of given Size ( XLPE armoured cable) inside the test station / over ground & under ground/inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of EIC of : |
| 239 | Size : 1 C x 4 SQ MM |
| 240 | Size : 1 C x 6 SQ MM |
| 241 | Size : 1 C x 10 SQ MM |
| 242 | Size : 1 C x 16 SQ MM |
| 243 | Size : 1 C x 25 SQ MM |
| 244 | Size : 1 C x 35 SQ MM |
| 245 | Cable jointing/ repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit (raychem/equivalent), termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for given Cable Size XLPE armoured Cu cable as per scope of work , specifications and directions of EIC of : |
| 246 | Size: 1 C x 4 sq mm |
| 247 | Size: 1 C x 6 sq mm |
| 248 | Size: 1 C x 10 sq mm |
| 249 | Size: 1 C x 16 sq mm |
| 250 | Size: 1 C x 25 sq mm |
| 251 | Size: 1 C x 35 sq mm |
| 252 | Making of Pipe to cable connection as per approved proedure, of all types of cable including excavation and backfilling, surface preparation, pipe to cable connection by means of pin brazing its encapsulation, holiday testing of the exposed section, labour, tools, tackles etc as per scope of work, specifications and direction of EIC . |
| 253 | Painting of Manual Test station including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 254 | Painting of Anode Lead Junction Box (ALJB)including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 255 | Painting of TR/CPPSM Units including removing of old paint, rust etc, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. (Final dry paint thickness not less than 100 micron), Numbering of Test Station as per scope of work, specification and as per direction of EIC. |
| 256 | SUPPLY AND INSTALLATION OF Cu/CuSO4 PERMANENT REFERENCE CELL: Supply and installation of Cu/CuSO4 permanent reference cell having stability of +/-10mV with 3 micro amp load . The cell should be place in corrugated PVC pipe of min 80 mm dia, min 1.5 mtrs long for test point along with backfilled material like Gypsum 75% + Bentonite Powder 20% + Sodium Sulphate 05% prepacked in Cotton Bag of 8in dia x 16in long This also includes supply of required Qty , including jointing (MAKE: RAYCHEM OR 3M) of 4 sqmm PVC insulated, XLPE sheathed, Cu conductor cable with reference cable , excavation (by using pneumatic hammer / Elect concrete breaker on PCC/RCC wherever required as per hazardous area classification applicable) & back filling, tools, tackles, all other consumable/ material required to carry out the job as per technical specification, scope of work , drawings defined in the Tender document and as per direction of EIC. |
| 257 | Supply of portable Cu-CuSO4 Half cell for measuring of PSP (Pipe to Soil Potential) of Pipeline. |
| 258 | Supply & installation of explsoin proof spark gap arrestors make across insulating joints at SV/IP/RR/terminals including required cable, lugs, nuts & bolts, labor, tools & tackles, and sundry consumables. |
| 259 | Supply, Installation and Commissioning of Polarization Cell / Solid State Decoupler (SSD) along with the enclosure suitable for housing of Polarization Cells in all respect as per specification & directions of Engineer In charge. (Supply of cable, cable laying upto the test station, Cable Joint to pipe & Zn anode for grounding shall be treated as seperate, if required). Sonipat |
| 260 | Preventive Maintenence of Polarisation cells supply of KOH electrolyte / Solid State Decoupler (SSD), complete in all respect to make the cell in working condition and as per specifications and instructions of EIC. |
| 261 | Supply and installation of pre-packed Magnesium anodes with cable having weight 17 pounds including excavation, backfilling, cable laying up to test station and cable temination in test station, cable identification ferrules, with consumables labour etc. as per approved drawing, specification and direction of EIC. |
| 262 | Supply,replacement & installation of prepacked High Silicon Chromiunm/Iron Solid Anodes(22kg) of reputed make including excavation, backfilling, anode to tail cable connection, cable identification, coke breeze backfill complete with labor, tools & tackles as per drawings, specifications & instructions of EIC (item is applicable for Normal AGE not for Deep Well AGB) |
| 263 | Supply and Installation of pre packed Zinc grounding cell 22Kg (H-Type) including all tools, tackles, consumables, labour chemical back fill, excavation, backfilling, cable to insert joint , laying of tail cable, cable temination at TS complete and in all respect as per drawing, specification and asp er direction of EIC. |
| 264 | Supply and Installation of pre packed Zinc Grounding Anode (Weight: 17 lbs) including all tools, tackles, consumables, labour ,chemical back fill, excavation, backfilling, cable to insert joint , laying of tail cable, cable termination at TS complete and in all respect as per drawing, specification and as per direction of EIC. |
| 265 | Supply, installation,Testing and Commissioning of Deep Well Anode Ground Bed (MMO Titanium anodes). |
| 266 | Preventive maintenance of Anode Ground Bed -The scope of work includes necessary excavation for carrying out ground bed curing with 500 kg of common salt and water of 18 KL. The work includes necessary backfilling and restoration to the original condition as per the direction of EIC. The contractor shall measure the grounded resistance after the treatment of ground bed. The resistance of grounded after the maintenance shall be less than 01 ohm. |
| 267 | Supply, installation, comissioning of earthpits as per scope of work & enclosed drawing and specififcations including supply and installation of of GI Pipe earth electrode, salt, charcoal, sand and brick masonary work,excavation and backfilling in all type of soils and MS cover at the top. |
| 268 | Half-yearly Monitoring of Earthpits: Resistance measuring of earth-pit, pouring of water to bring down the resistance if required, painting, numbering and cleaning of connecting nuts and bolts, etc as per directions of EIC. Jobs also included painting/ pasting of Earthpit number, Resistance value, Grid Value, Testing date, Next due date on metallic plate, this plate is to be fixed on Earthpit chamber or chamber top plate or nearest structure, as per the instruction of GAIL Gas representative. (Qty is for two years) |
| 269 | Recharging of existing earth pits. Job includes supply of new GI Pipes, material and consumables, transportation of material and manpower, painting of top cover plates and numbering, recharging of earth pit by pouring sufficient salt, charcoal and water in it for bringing down the circuit resistance including making, necessary excavation, backfilling etc complete in all respect and as per directions of EIC. |
| 270 | Chamber Repair of Earth Pit. Job includes reconstruction of Earth pit chamber with raising the height of civil foundation, repair of cement plastering, painting of top cover plates and numbering the earthpit, charging the earth pit with common salt 50 Kg and water 100L for bringing down the circuit resistance including making necessary excavation, mixing & pouring of salt & water, replacement & cleaning of connecting nuts and bolts, etc complete in all respect and as per directions of EIC |
| 271 | Earthpit chamber MS Cover thickness 5 mm (Approx) (600 X 600 X 5), with collapsible lifting handle and painting. |
| 272 | Supply and installation of cable markers for underground cables and equipment as per the specifications. |
| 273 | Excavation & Backfilling of pipeline in all type of soils and ordinary rocks for a width of D+500 mm on each side of pipe and exposing the pipeline from top upto 500mm below the bottom of Pipeline including the stacking of excavated earth ,lead upto 50m,stacked earth to be levelled and neatly dressed 'as per the scope of work and directions of EIC. (IF RCC breaking and restoration is needed, payment of RCC quantity same shall be done in seperate SOR). Job includes excavation and restoration for Bell hole examinations. |
| 274 | Coating repair, Removing the old/ damaged coating/rust greese,moisture and all foreign material at defect material with scrapper,manual surface preparation using hand wire brush ,emery paper,scrappers or a combination of all processes,repairng of the coating with supply of raychem sleeves/cold applied tape/PERP/patch repair kit ,holiday testing after repair,as per the scope of work and to the entire satisfaction of EIC .Multiple patch repairing at one location within one meter span shall be trated as single quantity only.(Compensation if required to land owners shall be in the scope of contractor) |
| 275 | Quarterly Monitoring and Collection of data related to CP System from Manual Test Stations along the pipeline route including compilation and preperation of the reports in the office by a technically qualified person.Quarterly monitoring includes On-Off Potential Survey using current Interrupters twice in a year. rates to be quoted on quarterly basis. Monitoring of MTSs |
| 276 | Monthly Monitoring and Collection of data from TR / CPPSM Units including compilation and preperation of the reports in the office by a technically qualified person.Monitoring of CPPSM/TR units are for 24 (twenty four) months. |
| 277 | Half-yearly Monitoring and Collection of data related to CP System from Anode Ground bed including compilation and preperation of the reports in the office by a technically qualified person. Total number of anode beds in Firozabad CGD is 6 and rates to be quoted on Half Yearly basis. Monitoring of Anode Beds (6 No in Firozabad CGD) are for Four Half-years. |
| 278 | Annual Monitoring and Collection of data related to CP System from Reference electrodes including compilation and preperation of the reports in the office by a technically qualified person. Rates to be quoted on annual basis. Monitoring of reference electrodes are for two years. |
| 279 | Supply and Installation of Kriston make Solid State Polarisation Cell for AC De-coupling and AC interference suppression for pipeline |
| 280 | Design of Anode Ground Bed including Soil Resistivity Survey for specified locations |
| 281 | IJ SUPPLY JOINT,INSULATING, DESIGN PRESSURE- 49 Kg/cm2(g), DESIGN TEMP- 0°C to 65°C, BUTT-WELD AT BOTH ENDS, DESIGN CODE- ASME SECTION-VIII DIV-I, CORROSION ALLOWANCE-1.5 MM, HYDROSTATIC TEST PRESSURE- 76 Kg/cm2(g), CHARPY TEST(BODY, WELDING ENDS)- As per ASTM A 370, HARDNESS TEST REQUIRED AS PER SPEC.BIDDER HAS TO QUOTE & SUPPLY INSULATING JOINT, TEST CERTIFICATE OF THE PRODUCT TO BE PROVIDED WITH THE MATERIAL.GAIL GAS MAY WITNESS TEST & DO PRE DISPATCH INSPECTION OF MATERIAL. |
| 282 | 4 IN, BODY-ASTM A-694, F-52, PUPS- API 5L GR. X-52, 6.4 mm THK.(MIN.) |
| 283 | 2 IN, BODY-ASTM A-694, F-52, PUPS- API 5L GR. X-52, 6.4 mm THK.(MIN.) |
| 284 | Supply, Installation & Commissioning of Cu Earth Pits as per scope of work & enclosed drawing (Drawings No.- MEC/SD/05/E9/02/02 ) and specifications including supply and installation of copper plate, GI Pipe, salt, charcoal, sand and brick masonry work, excavation and backfilling in all type of soils and MS cover at the top, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc,. (Earthing Cable/ strip extra) any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 285 | Supply, Installation & Commissioning of Maintenance free Earth Pits as per scope of work & enclosed drawing. Chemical Earthpits at Firozabad GA which includes supply and installation of copper bonded solid steel rods made by high quality molecular bonding 99.9 % pure electrolytic copper on a low carbon, high tensile steel core with the bonding range of 250 micron, supply of earth enhancement materials, supply of copper bus bar, supply and construction of earthing Pit Chamber including supply of Pit cover, requisite SS nuts & bolts, soil excavation, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc, any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 286 | Supply & Laying/ Erection of 25 mm X 3 mm G.I strip at 0.50 metre below ground as strip including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm) including all associated civil work/ restoration and labour for Grid Fabrication of Existing Earth Pits as per IS 3043. |
| 287 | Testing of Insulation Joints by using Radio Frequency IJ Tester1.Contractor shall carryout testing of Insulation Joints to find shorting of Insulation Joints to find out shorting of Insulation Joints by using Radio Frequency IJ Tester.2.RF IJ Tester for carrying out IJ testing is in the scope of the Contractor. 3.Contractor shall provide Test Certificate of RF IJ tester before carrying out testing job. |
| 288 | Checking and Repairing of Cased Crossing |
| 289 | Carry out of Soil Resistivity Test by Wenner 4-Point Method along the steel pipeline @ 3KM interval including preparation and submission of report and review by authorized engineer as per the direction of E-I-C. |
| 290 | Breakdown maintenance :To carry out the breakdown maintenance/ complaints of TR units. EIC/SIC shall issue Job orders for attending breakdown maintenance, Immediately upon receiving such orders, the contractor shall make necessary arrangements and submit schedules thereof in line with the time frame given by EIC/SIC. The scope of work includes tracing out the fault in the TR unit, carrying out necessary repairs and rectification (including Main transformer Rewinding, or replacement of Gail supplied Control Cards or any of the issued Spares required to make the Unit Functional in all respects to get desired polarization Levels. The contractor should attend the break down call within 48 hours for diagnosis & if required, Activities to be performed as defined in the Tender document & as per direction of the EIC/SIC. |
| 291 | Supply and installation of Vent Pipe for cased crossing including excavations, backfilling with compactions, removing of old one, welding, painting, application of coating if required etc all complete as per the direction of EIC/SIC. |
| 292 | Supply and Installation of Cable Gland plate of required size to installed inside the pole opening at Manual Test Station as per direction of the EIC/SIC. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail