| 1 | Excavation in trenches not exc 1.5 m in depth and not exc 1.5 m wide for taking out/laying CI/GI/PPR pipes and getting out in soft/loose soil complete all as specified and as directed. |
| 2 | Returning filling in including spreading, levelling, watering and well ramming in layer not exc 25 cm in soft/loose soil, complete all as specified and as directed. |
| 3 | Removing excavated materials to a distance not exceeding 50 m and depositing at a level not exceeding 1.5 m from starting point, complete all as specified and as directed. |
| 4 | Taking up old unserviceable 100 to 150 mm bore GI Pipe from trenches/floors with necessary fittings and valves etc complete all as specified and all as directed by Engr-in-Charge. |
| 5 | All as per item No 4 (here-in-before) above but 80mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 6 | All as per item No 4 (here-in-before) above but 50mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 7 | All as per item No 4 (here-in-before) above but 40 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 8 | All as per item No 4 (here-in-before) above but 25 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 9 | All as per item No 4 (here-in-before) above but 20 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 10 | All as per item No 4 (here-in-before) above but 15 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 11 | Supply, laying, and testing galvanised iron pipes of 100 mm bore medium grade with ISI Marked with all necessary fittings ( such as bends, elbows, tees, short pieces of medium grade pipe, connectors, back-nuts, caps, plugs and unions etc.) laying in trenches/ floors/ ducts and also cutting pipes, screwing, and for making forged bends on piping as required, complete all as specified and as directed by Engr-in-Charge. |
| 12 | All as per item No 11 (here-in-before) above but 80 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 13 | All as per item No 11 (here-in-before) above but 50 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 14 | All as per item No 11 (here-in-before) above but 40 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 15 | All as per item No 11 (here-in-before) above but 25 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 16 | All as per item No 11 (here-in-before) above but 20 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. |
| 17 | All as per item No 11 (here-in-before) above but 15 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. Please Enable Macros to View BoQ information |
| 18 | All as per item No 11 (here-in-before) above but 15 mm bore GI Pipe, complete all as specified and as directed by Engr-in-Charge. Please Enable Macros to View BoQ information |