| 1 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soil of all types ,sand,gravel and soft murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed , normal dewatering, preparing the bed for foundation and excluding backfilling , etc. complete |
| 2 | Item No.2:- Excavation for foundation / pipe trenches in hard murum and boulders ,W.B.M. Road including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling , etc. complete |
| 3 | Item No. 3 : Providing dry/trap/granite/quartzite rubble stone soling 15 cm … etc complete |
| 4 | Item No. 4 : Providing & laying in situ. C.C of trap granite/ quartzite / gneiss/ metal for foundation & bedding including dewatering , from work,compacting, curing, finishing etc. complete. M 150 |
| 5 | Item No.5:- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. ( By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-250grade chajjas/ paropels/ qurtain boalls/ partition wall / pardies |
| 6 | Item No.6:- Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes,caps,footing, foundation,slab,beams,columns,canopies, staircase, newels,chajjas, lintels,pardies,coping,fine arches etc. as per detailed designs, drawing & schedule s including cutting,bending,hooking the bars,bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). With Lebour Rate Tor Steel |
| 7 | Itemno:7 - Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. |
| 8 | Item No.8:- Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. |
| 9 | Item No 9:-Providing and fixing Sign Board of Standard Size |
| 10 | Item No.10-Test Report Charges |
| 11 | Add 18% GST Please Enable Macros to View BoQ information |