| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All Kind of Soil 100% |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying damp-proof Course 50 mm thick with cement concrete1:2:4 (1cement :2 coarse sand: 4 graded stone aggregate 20 mm nominalsize) and curing complete |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 8 | Suspended floors, roofs, landings, balconies and access platforms |
| 9 | Edges of slabs and breaks in floors and walls Under 20cm wide |
| 10 | Hand-packing stones in wire-crates; including cost of crates and stones. |
| 11 | Dumping stone including cost of stones in Horizontal on level (Back Filling) |
| 12 | River bed material (RBM) behind R/Wall complete job. |
| 13 | Carriage of materials by M.T. from source to site of work incl. loading/unloading completea) Carriage of sand & Agg Below 40mm Avg. Dist. 10km by MT |
| 14 | b) Carriage of stone aggregate above 40mm as per carriage chart Avg. Distance 10km by MT |
| 15 | c) Carriage of stone as per carriage chart Avg. Distance 10km by MT Please Enable Macros to View BoQ information |