| 1 | Excavation for structures. Earthwork in Excavation for structures in all kind of soil, soft rock, hard rock as per drawing and technical specification clause 305.1 including setting out, Construction of shoring and bracing removal of stumps and other deleterious material and disposal upto lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material upto 3m depth. |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete incl curing but excluding the cost of centering , shuttering, finishing and reinforcement all work upto plinth level 1:1.5:3 ( 1 cement :1.5 coarse sand :3 graded stone agg. 20 mm nominal size) |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 6 | Providing and laying of boulder apron laid in wire crates with 4mm dia GI wireconforming to IS:280 and IS:4826 in 100mm x 100 mm mesh ( woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25Kg each as per drawing & |
| 7 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete |
| 8 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge |
| 9 | Tack Coat Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On bitumen surface @ 0.50 Kg/sqm |
| 10 | 2 cm premix carpet surfacing with 1.8cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 size respectively, per 100 sqm and 52kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).With paving Asphalt grade VG-30 with no solvent |
| 11 | Seal CoatProviding and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180micron sieve) with bitumen using 128 kg of bitumen of grade VG-30 bitumen per cum of fineaggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling andfinishing with road all complete |
| 12 | Supplying and laying including digging, carrying by lorry, filling River Bed Material includingwatering & consolidation in layers to specified lines, camber, grades and cross sections. Finishedwork including material , labour all leads , lifts and carriage of material by MT/HL. ( for bermfilling) |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for:a) Foundations, footings, bases of columns etc. for mass concrete. |
| 14 | c)Suspended floors, roofs, landings, balconies and access platforms Please Enable Macros to View BoQ information |