|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres Ordinary soil 80%, Ordinary rock 20% |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) incl. all leads, lifts & carriage of material by MT/ H.L. |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level thermomechanically treated bars of Fe500D or more. |
| 6 | Centring and shuttering including strutting propping etc and removal of form work for Foundations, footings, bases of columns etc. for mass concrete. |
| 7 | Supplying and packing of stone boulder in 4mm dia (100mm x100m mesh) GI wire crates apron complete as per technical specifications and directions of engineer in charge including cost of wire crates |
| 8 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work including material , labour all leads , lifts and carriage of material by MT/HL |
| 9 | Carriage of materials by M.T. from source to site of work incl. loading/unloading complete Carriage of sand for an Average lead of 10.0km |
| 10 | Carriage of Aggregate for an Average lead of 10.0km. 40mm aggregate |
| 11 | Carriage of Aggregate for an Average lead of 10.0km. 20mm aggregate |
| 12 | Carriage of boulders for an avg lead of 6.0 km Please Enable Macros to View BoQ information |