| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil tem-A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundaton trenches removing roots of trees shrubs all complete as per approved design and per building specification and direction E/I.S.O.R Item No. 5.1.1+ 5.1.2 |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, Labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume).S.O.R Item No. 5.1.10 |
| 3 | Supplying ans laying (properly as per design and efawing) rip-rap with good quality of boulder duly packed packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.S.O.R Item No. 5.6.8 |
| 4 | Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing. (1:1.5:3).S.O.R Item No. 5.3.1.4 |
| 5 | Providing random rabble stone masonry in C.M. (1:4) in foundatino and plingh with hammer dressed stone of less than 0.03 cube meter in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening-ranking out joints to 20mm, depth curing taxes and royalty all complete as per building specificaiton and direction of E/I.S.O.R Item No. 5.2.28 |
| 6 | Providing random rubble stone masonry in Cement Mortar. (1:4) in super structure -do- including cost of screening of material, Scaffolding, raking out joints to 20mm, depth -do-do-.S.O.R Item No. 5.2.31 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering finishing and reinforcement (1:1.5:3) 1 cement:1.5 coarse sand (zone-iii): 3 graded stone aggregate 20 mm nominal size all complete as per building specification and direction of E/I.S.O.R Item No. 5.3.9.1 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering finishing and reinforcement (1:1.5:3) 1 cement:1.5 coarse sand (zone-iii): 3 graded stone aggregate 20 mm nominal size all complete as per building specification and direction of E/I.S.O.R Item No. 5.3.9.1 |
| 9 | Providing TMT steel reinforcement 8mm dia rods as per approved design and drawing TMT Fe 500 (ONLY valid for SAIL & TATA steel ) (a) 10 mm (TMT coil Fe 500 )(Only vaild for SAIL & TATA steel) (ii)12 mm (TMT coil Fe 500 )(Only vaild for SAIL & TATA steel ) (iii)16 mm (TMT coil Fe 500 )(Only vaild for SAIL & TATA steel) S.O.R Item No.5.5.5 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering finishing and reinforcement (1:1.5:3) 1 cement:1.5 coarse sand (zone-iii): 3 graded stone aggregate 20 mm nominal size all complete as per building specification and direction of E/I.S.O.R Item No. 5.3.9.1 |
| 11 | Providing 25mm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening curing with all leads and lifts of water scaffolding taxes and royalty all complete as per building specification and direction of E/I.S.O.R Item No. 5.7.12 |
| 12 | Providing Weep hole with dry graded----do-----do---- as per specification and direction of E/I.S.O.R Item No. 6.7.6 |
| 13 | Filling in foundation treches and plinth in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained agter cutting within a lead of 50 M and lift of 1.5 M all complete job as per building specification and direction of Engineer in charge.S.O.R Item No.5.1.8 |
| 14 | Carriage of Materials |
| 15 | Cement |
| 16 | Chips |
| 17 | Metal |
| 18 | Boulder |
| 19 | Add 18% GST |
| 20 | Add 1% Labour Cess Please Enable Macros to View BoQ information |