| 1 | Dismantiling of CGI safety Panels including Careful removal and proper Stacking at SASB store. |
| 2 | Repairs the Steel structure of prefabricated huts to make it fit for fixing of PUF Panels in MS channels of huts including tightening leveling and fixed up at appropriate position for side walls, with repair, fixing of doors. windows etc. complete job including all leads and lifts of material from store to erection site fixed required nuts bolts, J & L hooks, bitumen and limpet washers including fabrication where ever required etc. Complete job |
| 3 | Providing and fixing PPGI precoated galvanized iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-incharge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 4 | Providing and Fixing precoated galvanised steel sheet roofing accessories0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : |
| 5 | Providing Wood work for ceiling and partition with available material at site with head load of all material both available and new from source to hut site (budloo/ fur wood). |
| 6 | i. Available Wood |
| 7 | ii. New Wood budloo or fur . |
| 8 | iii. Poplar wood for kitchen and other required spots |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete |
| 10 | Supply and fixing of new decorative Ply wood for wall lining of huts.4 mm/ 6mm thick inc all head load up to working site: 4 Rooms near Helipad. |
| 11 | Supply and fixing of PVC Flexible Tarpaulin water resistant for laying upon the roof of huts of size 24ft x18 ft to retain the rain water with all carriages of material up to site, |
| 12 | Providing Temperary electrification to hut rooms by way of supply and fixing of all electrical fittings and fixtures including wire and LED Lamps 9 Watt, and charging points etc of approved quality. |
| 13 | Carriage of material by mechnical transport from anantnag to Chandanwari including loading and unloading( CGI sheets & plywood & cement ) |
| 14 | Head load of material from Chandanwari to Sheshnag By porters |
| 15 | Head load of cement from chandanwari to sheshnag |
| 16 | Sand and coarse aggregate from 3km lead Please Enable Macros to View BoQ information |