| 1 | Construction of Brick masonry sluice valve chambers for the valves to be installed in the system |
| 2 | Supply , erection testing of new architectural cum decorative poles 6 m high two section construction complete in all respect |
| 3 | Supply , erection testing decorative lights 45 watt LED type light with effcay of 120 watt complete in all respect |
| 4 | Supply , testing and Commissioning of 30 watt LED light complete in all respect |
| 5 | 3 Phase Street light panel with astro times 3 for street light |
| 6 | Providing an d Fixing 150 mm dia electromagnetic Flow meter |
| 7 | Providing Electric connection for Tube well |
| 8 | Supply , lowering and Fixing MS Special socket to connect SS Strainer to MS pipe complete in all respect |
| 9 | Construction of bricks masonry well around bore well for holding gravel for packing |
| 10 | Providing and fixing of fibre glass in all respect |
| 11 | Providing and fixing of IP20 SMD in all respect |
| 12 | Cost of providing and fixing chain pulley in all respect |
| 13 | Providing and fixing 150mm dia |
| 14 | providing electric connection in all respect |
| 15 | 200 watt flood lights complete |
| 16 | providing and fixing od steel gate with pllars |
| 17 | elliptical exerciser in all respect |
| 18 | supply of panel box hut in all respect |
| 19 | labour charges for making connection with existing line excavation with existing line in all respect |
| 20 | supply and erection of decorarive bracket 150 cm long |
| 21 | repairing charge 101 to 200 watt led flood light installed 12/16.20 mtr complete in all respect |
| 22 | repair and maintenance of change of 24 to 100 watt LED installed on pole light complete |
| 23 | single axis nest complete |
| 24 | sea saw two seater complete |
| 25 | inclusive roundabout complete |
| 26 | horse spring rocker complete |
| 27 | chimes complete |
| 28 | metallophone complete |
| 29 | drums set complete |
| 30 | drum plates complete |
| 31 | multiplay station complete |
| 32 | flexible net climber complete |
| 33 | flower designed light poles |
| 34 | tree solar canopy complete |
| 35 | tyre railing complete |
| 36 | curve bench complete |
| 37 | sensors and safety devices complete |
| 38 | signage complete |
| 39 | elliptical exerciser complete |
| 40 | sit up station complete |
| 41 | arm wheel complete |
| 42 | seated chest press complete |
| 43 | air walker complete |
| 44 | step and twist complete |
| 45 | P/F of tensile canopy complete |
| 46 | water supply household connection |
| 47 | sewer household connection |
| 48 | Estimate for Augmentation of Water Supply, Sewerage, Drainage system, Street lighting and Park Development in Village Budhena Distt. Faridabad. Please Enable Macros to View BoQ information |