| 1 | (NS item) credit of pipes |
| 2 | (NS item)credit of bricks is not included |
| 3 | (HSR item) [10.34]Providing and laying dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. [Through Rate] |
| 4 | (HSR item) [10.77]Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate] |
| 5 | (HSR item) [14.2]Dressing side slopes and preparation of sub grade for lining by mechanical/ mannual means [Through Rate] |
| 6 | (HSR item) [14.34.2]Single layer brick lining for irrigation channels for any discharge consisting of (i)Laying polythene film 200 micron over sub grade (ii)First layer of 6.83 cm thick bricks 22.86x11.11 cm laid in 1:4 mortar over 6 mm thick cement mortar 1:4 2. In side slopes [Through Rate] |
| 7 | (HSR item)[17.15.1]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material [Through Rate] |
| 8 | (HSR item)[17.26.1]Tack Coat 1. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate] |
| 9 | (HSR item) [17.75]Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within any lead. [Through Rate] |
| 10 | (HSR item)[21.95.8]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 8. 900 mm [Through Rate] |
| 11 | (HSR item) [27.1]Brick masonry work in 1:3 in sub-structure including scaffolding complete excluding pointing and plastering, as per drawing and MoRTandH Specifications 1300 and 2200 [Through Rate] |
| 12 | (HSR item)[27.10.1.2]RCC Grade M25 1.2. With Batching Plant, Transit Mixer and Concrete Pump [Through Rate] |
| 13 | (HSR item) [27.13]Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and MoRTandH Specifications 1600 & 2200. [Through Rate] |
| 14 | (HSR item)[27.15]Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and MoRTandH Specifications 2706 & 2200. [Through Rate] |
| 15 | (HSR item)[27.17]Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and MoRTH and Specification 710.1.4 of IRC: 78 and 2200. [Through Rate] |
| 16 | (HSR item)[27.28.1.1]Using Batching Plant, Transit Mixer and Concrete Pump 1.1. For formwork and staging add the following: For solid slab super-structure, 20-30 per cent of labour, material and machinery cost Height up to 5m [Through Rate] |
| 17 | (HSR item)[27.41]Mastic Asphalt wearing coat ( 516 & 2702) Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm centre to centre in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516 of MoRTH Specification (5th Revision, 2013) [Through Rate] |
| 18 | (HSR item)[27.44.1]Drainage Spouts complete as per drawing no. SD/205 and MoRTandH MoRTandH specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges) 1. For fabrication [Through Rate] |
| 19 | (HSR item)[27.49]Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm and MORT&H specification 800. [Through Rate] |
| 20 | (HSR item)[27.5]Plain/Re-inforced cement concrete in sub-structure complete as per drawing and MoRTandH specifications 1500,1700 and 2200.PCC Grade M15 (with concrete Mixer) Height up to 5m [Through Rate] |
| 21 | (HSR item) [34.19.1]Hazard Marker sign board 300x900mm rectangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and IRC 67 2012, fixed over 4mm thick Aluminium Composite Material (ACM) sheeting having skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 firmly fixed to ground including foundation concrete M-25 of size 0.45x0.45x0.60m for vertical post complete as per clause 801 of MORTandH specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting and a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67- 2012. 1. Using retro reflective Sheeting Class C as per IRC 67 2012 [Through Rate] |
| 22 | (HSR item)[35.6]Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates. Including excavation for trimming for preparation of bed. Nominal excavation required for preparation of bed has been taken into account while making provision for labour. [Through Rate] |
| 23 | (HSR item)[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 24 | (HSR item)[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate] |
| 25 | (HSR item) [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] |
| 26 | (HSR item) [5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [Through Rate] |
| 27 | (HSR item) [5.53.2]Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 2. above 600 mm dia [Through Rate] |
| 28 | (HSR item) [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate] |
| 29 | (HSR item)[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate] Please Enable Macros to View BoQ information |