|
| 1 | NS Item |
| 2 | Less Credit of Old Bricks ( - ) |
| 3 | Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head 12. 00 m as per the indicated requirements of discharge in LPM and power capacity in 7.50 BHP , 1400 LPM , 12.00 M. HEAD |
| 4 | Supplying, erection, testing and commissioning of Horizontal motor pumping set for clear water having head 60. 00 m as per the indicated requirements of discharge in LPM and power capacity in 35.00 BHP , 1400 LPM , 60.00 M HEAD |
| 5 | Credit for old Raw Water Pumping Machinery 7.50 BHP , 1000 LPM , 12.00 M. HEAD |
| 6 | Credit for old Clear Water Pumping Machinery 30.00 BHP , 1440 LPM , 45.00 M. HEAD |
| 7 | Less Credit of Old Brick Bats (-) |
| 8 | Supplying, erection, testing and commissioning of Horizontal split casing pump set for Raw water having head 110. 00 m as per the indicated requirements of discharge in LPM and power capacity in BHP 5700 LPM , 250 BHP complete in all respect as per stipulated specifications and makes, as per direction of Engineer in charge. |
| 9 | PANEL BOARDS FOR MOTORS: Supply, erection, testing and commissioning of wall mounted electrical LT Panel board, fabricated from 16 SWG CRCA sheet duly stouten with suitable angle iron frame work and completely powder coated of suitable size deep having following items for Raw water Pumping set of following LPM X Head) a) Main switch suitable ampere 1 No.b) CT 100/3 = 1 Nos. c) Digital Multi function meter = 1 No.d) SPP = 1 No. of approved makee) Motor starter, star delta 1 Nof) VSS 1 No. and ASS 1 Nos. of approved make.g) Capacitor KVAR as per site requirement = 1 No.h) Indicating Lamp = One Seti) Change over switch of suitable Amp = 1 No.and suitable for 5700 LPM X 110.00 M Head (For R/W Pump At RWPS) |
| 10 | Providing, lowering, laying, aligning, fixing in position in pipe line, Resilient Seated D/F DI Sluice valves of approved make and design standard of following dia complete (including jointing and jointing material ) including all material, labour, testing and commissioning along with pipe line as per prescribed Technical Specifications confirming to IS 14846 : 2000 and as per direction of Engineer-in-charge.450 mm i/d |
| 11 | Providing, lowering, laying, aligning, fixing in position in pipe line, Resilient Seated D/F DI Sluice valves of approved make and design standard of following dia complete (including jointing and jointing material ) including all material, labour, testing and commissioning along with pipe line as per prescribed Technical Specifications confirming to IS 14846 : 2000 and as per direction of Engineer-in-charge.400 mm |
| 12 | Providing, lowering, laying, aligning, fixing in position in pipe line, Resilient Seated D/F DI Sluice valves of approved make and design standard of following dia complete (including jointing and jointing material ) including all material, labour, testing and commissioning along with pipe line as per prescribed Technical Specifications confirming to IS 14846 : 2000 and as per direction of Engineer-in-charge.350 mm |
| 13 | Operation and maintenance during 2nd year defect liability-cum - Maintanance period. |
| 14 | Operation and maintenance during 3rd year defect liability-cum - Maintanance period. |
| 15 | Operation and maintenance during 4th year defect liability-cum - Maintanance period. |
| 16 | Operation and maintenance during 5th year defect liability-cum - Maintanance period. |
| 17 | Operation and maintenance during 6th year defect liability-cum - Maintanance period. |
| 18 | Operation and maintenance for the complete scope of work covered in the DNIT as well as existing structures at existing water works Missri as per operation and maintenance schedule attached in the DNIT in additional document for a period of 6 years defect liability cum maintenance period after successful of 3 months trial run period. Note: the disinfectant will be provided by PHED itself. (the cost will be charged to the A/ Mtc. Estimate of respective F.Y)Operation and maintenance during 1st year defect liability-cum - Maintenance period. |
| 19 | Item Description HSR Item |
| 20 | H.S.R. Item Please Enable Macros to View BoQ information |