|
| 1 | Removal of Pump from Foundation and manual Shifting to workshop for repair including loading and unloading and manual carriage at both sides and shifting back to site alignment with Motor and trial run as per the direction and to the entire satisfaction of the Engineer in Charge in all leads and lifts. |
| 2 | Providing and Fixing of Shaft complete in all respect in all leads and lifts. |
| 3 | Dismentling of complete Pump after heating Gasin all leads and lifts. |
| 4 | Providing and Fixing of Ball Bearing No. NU 306 ECP/C3 Non Drive end complete in all respect. |
| 5 | Providing and Fixing of Impeller complete in all respect. |
| 6 | Repair of Impeller complete in all respect. |
| 7 | Providing and Fixing of \\"O\\" Rings of all the stages complete in all respect. |
| 8 | Providing and Fixing of Neck Rings complete in all respect. |
| 9 | Providing and Fixing of Lubricant complete in all respect. |
| 10 | Repair of Bearing Bracket complete in all respect. |
| 11 | Providing and Fixing Balancing Disc Assembly complete in all respect. |
| 12 | Providing and Fixing of Guide Bush complete in all respect. |
| 13 | Repair of Defuser complete in all respect. |
| 14 | Providing and Fixing of Gland Sleeves complete in all respect. |
| 15 | Shifting of Pump from workshop including manual carriage from road head to Pump House complete in all respect. |
| 16 | Pump Jointing to Motor, testing and trial run complete in all respect. |
| 17 | Providing and Fixing of Coupling Set RB 162/2 (Pin Bush type) complete in all respect. Please Enable Macros to View BoQ information Terms and conditions |
| 18 | The work shall be executed as per HPPWD/JSV/ISI specifications and to the entire satisfaction of the Engineer-in-charge. |
| 19 | The contractor shall be fully responsible for watch and ward of the material at site of work. |
| 20 | Nothing shall be paid for rejected material. |
| 21 | 1% rebate on overall amount of dismantled materials shall be given by the contractor. |
| 22 | 1% labour cess will be deducted from the bill of the contractor. |
| 23 | GST as applicable will be borne by the contractor. |
| 24 | The rates shall be inclusive with GST and carriage . |
| 25 | The work should be completed in the stipulated period. |