| 1 | Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portion requiring blasting upto a distance of all deposting of un-serviceable materials, stacking serviceable materials and dumping side is to be arranged by the contractorat itsown cost and neatly dressing the surface. including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government |
| 2 | Excavation in drains and channels etcetera in earth work in all kinds of classification of soil such as pick work, jumper work, pick jumper work. blasting work , jumper blasting work,soft and hard blasting and doing work in saturated soil including chiseling or wedging out rock where blasting work is prohibited or any other mixed variety of soil including shoring, strutting dewatering and pumping or bailing out water ( surface and sub soil water ) upto any depth or any quantum of water including slush which may arise during dewatering, removal of slush and stacking the serviceable and unserviceable material clear from the edges of excavation and then returning the stacked soil in 15 cm ( fifteen centimeters ) layers when required into plinths and sides of foundation etcetera consolidating each deposited layer by ramming and watering and then disposing of all surplus unserviceable excavated earth as per HP.PWD. specifications,approved drawings, designs as per the entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 3 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, heights of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of wall (any thickness ) including attched pilasters buttresses plinth and tring course etc. up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. |
| 4 | Providing and laying cement concrete 1:3:6 (One cement : three sand : six crushed stone aggregate 40mm ( Forty millimeter) nominal size) mechanically mixed and vibrated in Walls including attached buttresses, pilasters and their caps and bases and string courses etc. upto floor two level including curing and cost of form work complete with carriage of materials labour ,tool and plants through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government |
| 5 | Providing and laying cement concrete 1:4:8 (One cement: Four sand :Eight graded cursed/broken stone aggregate 40mm) (forty millimeters nominal size) mechanically mixed and curing complete, excluding cost of form work in foundation and plinth including carriage of materials through all modes of transportion with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. |
| 6 | Providing and laying cement concrete 1:1.5:3 (one cement into one point five sand into three crushed stone aggregate 20mm. (Twenty millimeter) nominal size) mechanically mixed and vibrated, curing complete excluding cost of form work and reinforcement for reinforced concrete work and as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plant through all modes of transportion within all leads and lifts and as per direction of Engineer-in- Charge in Foundation, footings bases of columns etc. and mass concrete. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 7 | Boulder filling behind retaining walls including ramming watering consolidation etc. with land burmost complete as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all iincidential charges. |
| 8 | Providing weep holes in brick masonry/stone masonry /plan reinforced concrete abutment,wing wall,return wall with 100mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7, including carriage of materials, labour, tool and plant through all modes of transportation within all leads and lifts and as per direction of Engineer-in- Charge.The rate including of octory, royalty, malkana,toll tax, sal tax or other taxes imposed by goverment. |
| 9 | Steel work welded in built up sections/hollow sections etc. framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works as per approved drawing, design and as directed by the Engineer-in-Chargeas per HP.PWD., Specifications includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government Please Enable Macros to View BoQ information |