| 1 | 11/0.4 kv 100 kva Transformer |
| 2 | Prov. Distribution Transformer 11/0.4 KV, 100 KVA |
| 3 | Prov. ST Pole 9 mtrs long |
| 4 | Prov. RCC Muff with concerete filling |
| 5 | Prov. X- Arm{Channel iron (100x50x6mm) Length :-2800mm x 2Nos for incomer line |
| 6 | Prov MS Angle iron (50x50x6mm), length:(2800mm)x1No for LA's |
| 7 | Prov. X- Arm ( Channel iron ( 75x40x6mm), Length :- (2800 mm x4 No.) for supporting DO fuse unit & GO Switch |
| 8 | Prov. X-arm : [Channel iron (100x50x6 mm) , length : 2800 mmx2 Nos ] for transformer bed. |
| 9 | Prov X-Arm [ Channel iron (100x50x6 mm), Length : (460 mm)x2 No for supporting main channel of transformer |
| 10 | Prov. MS Angle Iron (50x50x6 mm), Length :- 2800 mm x 2 Nos |
| 11 | Prov. MS Angle Iron (35x35x5 mm), Length :- 460 mm x 2 Nos |
| 12 | Prov. MS Angle Iron (50x50x6 mm), Length :- 950 mm x 2 Nos for Bed Knee Bracing |
| 13 | Prov. MS Angle Iron (50x50x6 mm), Length :- 2800 mm x 2 Nos |
| 14 | Prov. MS Angle Iron (50x50x6 mm), Length :- 450 mm x 1 Nos |
| 15 | GO Switch Handle Supporting:[ Channel iron (75x40x6 mm) , Length : 460 mm |
| 16 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2400 mm X 2 Nos] for. CT-PT Bed. |
| 17 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of CT-PT Unit. |
| 18 | Belt Set MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos for CT-PT. |
| 19 | CT PT Unit 25/5A |
| 20 | Control cable 12 core 2.5 Sqmm Copper Cable. |
| 21 | HT Energy Meter (3-Phase, 4-Wire) DLMS compliant -/5 A CT Type. |
| 22 | Prov. GO AB Switch unit (11 KV,400A,25 KA ) Tripple pole O/D type |
| 23 | Prov. DO fuse unit |
| 24 | Prov. Surge arrester , 9KV Station class ( Porcelain type) |
| 25 | Prov. Disc insulator sets (complete 1 No Disc ( Porcelain, BS,12 KV,90 KN including Dead End clamps etc ) |
| 26 | Prov. Stay set complete |
| 27 | Prov. Stay wire (7/3.15 mm ) (7.0 Kg Per Stay Set ) |
| 28 | Prov. Pipe earthing set |
| 29 | Prov. LT Distribution Panel with MCCB (160 A, 10KA, 4P,1 No) & SFU ( 32A, 5 No. rewirable |
| 30 | Prov. Half clamp (M.S. Flat 50x6 ) |
| 31 | Prov. Full clamp (M.S. Flat 50x6 ) |
| 32 | Prov. Nut & Bolts of various Sizes ( Galvanised / Coated ) [ Preferably 16mm or more ( With flat and spring washer ) |
| 33 | Prov. Aluminium Thimble |
| 34 | Prov. Cu Thimble 120 mm sq |
| 35 | Prov Danger plate |
| 36 | Prov. barbed wire |
| 37 | Prov. LT Cable (3.5 core ) 120 mm sq |
| 38 | Prov. Aluminium Paint |
| 39 | Supply and fixing of OEM make 50kVar outdoor APFC Panel having Copper Bus bar+ Super Heavey duty Capacitors + Capacitor dutycontactors+enclousers xomplies to 11 tank coating process + 8 step intellegent power factor relay controller. All components like MCCB, Capacitor duty contactor/Power ntractor APFC relay Power capacotor must be of same make. capacitor Bank size 3x(12.5kVAr+1x(7.5kVAr)+1*(3kVAr)+1*(2kVAr) |
| 40 | Tranformer Bed |
| 41 | Chain link fencing |
| 42 | Transportation Charges complete in all respect. |
| 43 | Erection Charges complete in all respect. |
| 44 | LT Line |
| 45 | Providing ST Pole 08 Mtr. Long |
| 46 | Providing RCC Muff concerete filling |
| 47 | Providing AAAC 7/3.15mm |
| 48 | Providing Shackle insulator (16 KN) |
| 49 | Providing D-Iron (U-Clamp) |
| 50 | Providing LT Stay Set |
| 51 | Providing Stay wire (7/3.15 mm) (6.0 Kg per stay set) |
| 52 | Providing Nuts & Bolts of various size |
| 53 | Providing Aluminium Paint |
| 54 | Providing Red Oxide |
| 55 | LT earthing set |
| 56 | Providing G.I Wire 10 No. SWG |
| 57 | Providing Egg Insulator (LT) |
| 58 | Providing Eye Hook |
| 59 | Erection of 08 Mtr. ST Pole complete in all respect. |
| 60 | Erection of LT Stay Set complete in all respect. |
| 61 | Erection of AAAC 7/3.15 sq.mm mix complete in all respect. |
| 62 | Erection of G.I Wire complete in all respect. |
| 63 | 11/0.4 kv HT Line |
| 64 | Prov. ST pole 9 mtr long |
| 65 | Prov. RCC Muff |
| 66 | Prov. AAAC Conductor 7/3.15 mm (50mm2) |
| 67 | Prov. Stay set complete |
| 68 | Prov. Stay wire (7/3.15 mm ) (7.0 Kg Per Stay Set ) |
| 69 | Prov. Stay clamp |
| 70 | Prov. Pipe earthing set |
| 71 | Prov. GO AB Switch unit (11 KV,400A,25 KA ) Tripple pole O/D type |
| 72 | Prov. X-arm : [Channel iron (100x50x6 mm) , length : 2400 mmx2 Nos |
| 73 | \\"A.I Knee Bracing set for single pole 2x(50x50x6)mm length 750 mm |
| 74 | Prov. Half clamp (M.S. Flat 50x6 ) |
| 75 | Prov. Disc insulator sets (complete 1 No Disc ( Porcelain, BS,12 KV,90 KN including Dead End clamps etc ) |
| 76 | Prov. 11 kv Pin insulator |
| 77 | \\" GI Wire 10 No. SWG |
| 78 | \\" Egg Insulator(HT) |
| 79 | \\" Eye Hook |
| 80 | Al paint |
| 81 | Red oxide |
| 82 | Prov. Nuts & Bolts off size |
| 83 | Transportation Charges complete in all respect. |
| 84 | Erection Charges of 09 Mtr. ST Pole complete in all respect. |
| 85 | Erection Charges of AAAC 7/3.15 sq.mm complete in all respect. |
| 86 | Erection Charges of Pipe Earthing Set complete in all respect. |
| 87 | Erection Charges of G.I wire complete in all respect. Please Enable Macros to View BoQ information |