Name of Work:- CONTRUCTION OF PUMPHOUSE AND ITS BOUDARY WALL AT ZONE NO. 7 MOHALLA HANUMAN GARHI. (LINE 4)
Sl. No.
Item Description
1
Provide all materials labour T&P etc. complete and construct Pump house size (2.5x3.0x3.0)m Chlorinating room size (2.5x1.3x3.0)m as per departmental type design and drawing (drawing no-D-2) and as per the specifications for civil work given in the bid document including supply of all material labour and T&P etc complete as per instructions of Engineer-in - charge
2
Provide all material , labour T&P ect. Complete and construct By-Pass Chamber size (1000(L) x1000(W) x 1150 (H))mm as per drawing and as per specification of civil work including supply of all material and T&Pbetc complete as per instructions of Engineer-in-Charge.
3
Construction of 1.7 m high and 0.3 m thick boundary wall with 230 mm×230 mm thick pillar made in Brick masonry in cement and sand mortar. including supply of all materials (labour & etc.) for proper completion of work as per instructions of Engineer-in-charge.
4
Supply and fixing 1.2m wide MS wicket gate including febrication and supply of steel and construction of boundary wall pillar etc.as per specification including supply of all material labour T&P etc required for proper completion of work as per direction of Engineer-in -Charge.
5
Providing wall putty on New surface with approvel qualitymaterial o f Berger/J.K./Birla or similar make 2 coates.
6
Providing cement primer on new surfaces i/c cost ofall material, labour & T&P etc complete.
7
Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer’s specification. Two or more coats on new work
8
Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coats over and including priming coat of exterior primer).
9
Construction of interlocking pavement for approach to water works as per design and specification including supply of all material ,labour T&P etc. required for proper completion of work as per direction of Engineer -in - Charge.
10
Electrification work complete in all respect as directec by Engineer in Charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.