|
| 1 | Dragging, loading, carriage and unloading of following store materials with proper stacking from ESC Daliganj to JE dumps store and from JE dump store to work site within municipal area. |
| 2 | 11KV 3X185 SQ MM XLPE CABLE |
| 3 | Supply of Material |
| 4 | 11 kV VCB for O/G CTR (200/100/5A) |
| 5 | STP 11 M long |
| 6 | 11 KV Pin Insulator |
| 7 | Top channel 100X50x3200 MM With clamp |
| 8 | Cross Bracing Angle for DP Structure |
| 9 | MS Base Angle |
| 10 | LT XLPE Cable AL.1X240 Sq.mm. |
| 11 | 11 KV ST/TH C/J KIT 3X185 SQ MM |
| 12 | 11KV END TERMINATION OUTDOOR 3X185 SQ MM |
| 13 | Barbed Wire |
| 14 | 11 KV Danger Board with clamp |
| 15 | Number Plate with clamp |
| 16 | M S Earthing Rod 20x2500 mm |
| 17 | Aluminum paint (Double Coat) |
| 18 | Red Oxide |
| 19 | GI Wire for Earthing 8 SWG |
| 20 | Nuts & Bolts |
| 21 | Supply of Cable Route Marker |
| 22 | 11 KV LINE ERECTION WORK |
| 23 | Laying of Double CKT 11 KV 3x185 sq mm XLPE cable in by HDD method as per Norms. |
| 24 | Laying of HDPE/GI Pipe 6\\" dia By dirll method / Manual Trench as per site condition for Single CKT 11 KV 3x 185 sq mmXLPE. (All Material Shall be provided by contractor except XLPE 11 KV 3x 185 sq mm Cable) |
| 25 | Laying of 11 KV 3x 185 sq mm XLPE cable in above laid HDPE/GI Pipe 6\\" dia. (All Material Shall be provided by contractor except XLPE 11 KV 3x 185 sq mm Cable) |
| 26 | Pruning of Trees for Erection of Double Pole Cable Exposure |
| 27 | Loading Carriage and Unloading of poles from Contractor's store to Erection site |
| 28 | Digging of Pit in kachcha/Pakka land for erection of ST Poles as per respo norms |
| 29 | Erection of Double Pole Cable Exposure with all related steel such as Top Channel 100x50 mm, T-OFF Channel 100x50 mm, Angle 65x65x6mm, Insulator, clamps, Danger Board, Number Plate, Barber Wire etc. (All Material Shall be provided by contractor except Channel, Angle, ST Pole, Pin Insulator) |
| 30 | Making double ckt 3 phase 3 wire bus bar for separate cable with single core cable. (All Material Shall be provided by Contractor except LT XLPE Cable AL.1X240 Sq.mm.) |
| 31 | Grouting of Pole as per standard (Respo). (All Material Shall be provided by Contractor) |
| 32 | Making of Muffing on ST poles 300 mm height. (All Material Shall be provided by Contractor) |
| 33 | Earthing of Double Pole Cable exposure by M S Earthing Rod 20x2500 mm using GI Wire for Earthing 8 SWG with nuts bolts (All Material Shall be provided by contractor) |
| 34 | Painting of ST Poles with one coat of red oxide and two coat of Aluminum Paint. (All Material Shall be provided by contractor) |
| 35 | Hoisting of 3x185 sq mm sizes of 11 KV single cable on Existing/Erected double pole including GI pipe 3 mtr long 4\\"/6'' dia including jumpering,dressing of cable with required all necessary Lugs, clamps and nut, bolts. (All Material Shall be provided by Contractor) |
| 36 | Digging of Pit in kachcha/Pakka land in 1 mtr deep 2 mtr long and 1.5 mtr wide for 11 KV ST/TH 3x185 sq mm and boxing with brick sand and stone slab as per norms. |
| 37 | Making of 11 KV ST/TH C/J KIT 3X185 SQ MM |
| 38 | Making of 11KV OUTDOOR 3X185 SQ MM |
| 39 | High Pressure Testing of 11 KV cables/line as per norms |
| 40 | Fixing of cable route marker. (All Material Shall be provided by Contractor) |
| 41 | ROW Permission /Road Cutting /Restoration Charges against the permission from concerning department like Nagar Nigam, PWD, NHAI, Etc. or whatsoever may be |
| 42 | Normal Soil |
| 43 | Kharranja/CC |
| 44 | Mettalic/Betumen |
| 45 | Provide NOC from Electrical safety directorate before energizing erected 11 KV line |
| 46 | Scanning/Tracing of existing underneath power cables, water pipe line, gas pipe line, sewer pipe line on proposed route. (Tracing Equipment shall be arrange by the contractor) |
| 47 | Shifting of 11 KV VCB to control room placement, erection, earthing to old strip commissioning & testing of the same as per RESPO Norms Please Enable Macros to View BoQ information |