|
| 1 | Transportation of Ring machine up to work place |
| 2 | Loading and unloading of T&P and Accessories |
| 3 | Transportation of air compressor upto site |
| 4 | Loading and unloading of T&P and Accessories |
| 5 | Transportation of O.P. unit upto site |
| 6 | Loading and unloading of T&P and Accessories |
| 7 | Transportation of Tube well assembly i.e. housing ipe plain pipe, ripped stainer pipe upto site. |
| 8 | Loading and unloading of Tubewell assembly |
| 9 | Transportation of Pumping plant upto site |
| 10 | Loading and unloading of Pumping plant |
| 11 | Installation of Rig Machine at site |
| 12 | Dismantling of Rig machine after execution f work |
| 13 | Drilling of 400mm Dia. From G.L. to 50m. B.G.L. |
| 14 | Drilling of 400mm Dia. From 50 M.B.G.L. to 85 B.G.L. |
| 15 | Drilling of 400mm Dia. From 85 M.B.G.L. to 140 M.B.G.L. |
| 16 | Louring of housing pipe from G.I. to 50m. B.G.L. |
| 17 | Louring of housing pipe from 50m. B.G.L. to 85m. B.G.L. |
| 18 | Louring of housing pipe from 85m. B.G.L. to 120m. B.G.L. |
| 19 | 150mm housing pipe CM UPVC Plain pipe |
| 20 | 150mm. Ribbed stainer pipe CM UPVC |
| 21 | 150mm M.S. Well cap |
| 22 | 150mm M.S. Clamp |
| 23 | 150mm UPVC ball plug |
| 24 | 400 x 200mm centre guide of M.S. stripe |
| 25 | Supply of 1.6mm. To 4.8mm size Lalkuwan Query P. Gravel washed and stacked and stacked at work place |
| 26 | Logging of borehole with electronic logging machine |
| 27 | Instalation of Air compressor Unit at work site |
| 28 | Development of Tubewell with air Compressor |
| 29 | Dismantling of air compressor aftar completition of work |
| 30 | Installation of O.P. Unit at work site |
| 31 | Development of Tubewell with O.P. Unit |
| 32 | Dismantling of O.P. Unit after completion of work |
| 33 | Testing of water yield and chemical and bacteriological testing of water |
| 34 | Supply of 7.5 H.P. 3 Phase 440 Volte 50Htz. 400 LPM at 45 mt. head submersible pumpset with 0mm. Delivery |
| 35 | Electronic dosing pump for chlorine soloution 6 lph 4kg pressure with all piping, valves and 100 fts capacity HDPE Solution tank |
| 36 | Main Piping & Valves of 80mm size with 21 mtr coloumm pipe, support wire, upto 12 mt to exsisting mainline of water supply |
| 37 | 3 core submersible cable 4mm. Sq. size |
| 38 | Submersible Starter Control panel with auto timer device |
| 39 | Electrical and mechanical installation of pumping plant & Accessories with earthing |
| 40 | Trial & testing of pumping plant |
| 41 | Protection fencing made from angle section one side opening with G Sheet roof duty fixing all side with all labour & Material |
| 42 | Painting of Pumping Plant |
| 43 | GST 18% Please Enable Macros to View BoQ information |