|
| 1 | E1 | Monitoring and Maintenance of Utility Services/Internal and External Electrical Services at Salem Airport comprising of LT Panels, DG Sets, CCR Panels, Runway Lighting, High Masts, Perimeter Lighting, Indoor and Outdoor Light Fittings, Power Points, Circuit/Submain Wiring, DBs, Aviation Obstruction Lights, Lightning Arrestors, Street Light Poles/External Lights, Signages etc., (As per Annexure-3 to 5 - List of Inventories ) on duty basis by deputing sufficient number of manpower as per Annexure-1 (8 Hours of Duty of Time as decided by Engineer-In-Charge), Monitoring, Control and General Maintenance for 100% Serviceability and i/c providing consumable material like cotton waste, oil, grease & other sundry material required for cleaning etc., attending minor faults of Equipments/ Repairs/ Replacement of defective components with AAI Supplied New Components, ensuring 100% Serviceability/ satisfactory working condition of the Systems, Routine and General Preventive Maintenance on Daily/ Weekly/ Monthly/ Quarterly/ Half Yearly/ Yearly Basis as per Standard Manufacturers Practices and as per Techno Commercial Specifications (TCS), Maintenance of Records and Log Books (as per Annexure-6 to 20) and reporting as and when required, complete Upkeeping of the Installations etc., on all days as specified and as directed by Engineer-In-Charge as required. |
| 2 | E2 | Maintenance of Addressable Type Fire Alarm System (FAS) (by OEM/authorized dealer of OEM) including all Associated and Auto Dialer of all FAS Types/Models/Make installed at following Locations including programming, repairs and maintenance, attending Faults of Systems, replacement of defective components with AAI supplied new components, ensuring 100% Serviceability/Satisfactory Working Condition of FAS, Routine and General Preventive Maintenance on Monthly/Quarterly/Half yearly/Yearly Basis as per Standard Manufacturers Practices, Break-Down Maintenance, Maintenance of Records/Service Reports and Reporting as and when required, complete Up-keeping of the Installations (FAS), as specified and as directed by Engineer-In-Charge as required. For First Year (Terminal Building & technical Block (Make- Edwards, Model-IO-1000)) |
| 3 | E3 | Maintenance of Addressable Type Fire Alarm System (FAS) (by OEM/authorized dealer of OEM) including all Associated and Auto Dialer of all FAS Types/Models/Make installed at following Locations including programming, repairs and maintenance, attending Faults of Systems, replacement of defective components with AAI supplied new components, ensuring 100% Serviceability/Satisfactory Working Condition of FAS, Routine and General Preventive Maintenance on Monthly/Quarterly/Half yearly/Yearly Basis as per Standard Manufacturers Practices, Break-Down Maintenance, Maintenance of Records/Service Reports and Reporting as and when required, complete Up-keeping of the Installations (FAS), as specified and as directed by Engineer-In-Charge as required. For First Year (NDB Room (Make- Edwards, Model-IO-64)) |
| 4 | E4 | Maintenance of Addressable Type Fire Alarm System (FAS) (by OEM/authorized dealer of OEM) including all Associated and Auto Dialer of all FAS Types/Models/Make installed at following Locations including programming, repairs and maintenance, attending Faults of Systems, replacement of defective components with AAI supplied new components, ensuring 100% Serviceability/Satisfactory Working Condition of FAS, Routine and General Preventive Maintenance on Monthly/Quarterly/Half yearly/Yearly Basis as per Standard Manufacturers Practices, Break-Down Maintenance, Maintenance of Records/Service Reports and Reporting as and when required, complete Up-keeping of the Installations (FAS), as specified and as directed by Engineer-In-Charge as required. For Second Year (Terminal Building & technical Block (Make- Edwards, Model-IO-1000)) |
| 5 | E5 | Maintenance of Addressable Type Fire Alarm System (FAS) (by OEM/authorized dealer of OEM) including all Associated and Auto Dialer of all FAS Types/Models/Make installed at following Locations including programming, repairs and maintenance, attending Faults of Systems, replacement of defective components with AAI supplied new components, ensuring 100% Serviceability/Satisfactory Working Condition of FAS, Routine and General Preventive Maintenance on Monthly/Quarterly/Half yearly/Yearly Basis as per Standard Manufacturers Practices, Break-Down Maintenance, Maintenance of Records/Service Reports and Reporting as and when required, complete Up-keeping of the Installations (FAS), as specified and as directed by Engineer-In-Charge as required. For Second Year (NDB Room (Make- Edwards, Model-IO-64)) |
| 6 | E6 | Comprehensive maintenance of following capacity air conditioners of all makes at different locations including and providing all necessary consumables and spares complete as required as per special conditions. For First Year (1.5 TR Wallmounted split AC) |
| 7 | E7 | Comprehensive maintenance of following capacity air conditioners of all makes at different locations including and providing all necessary consumables and spares complete as required as per special conditions. For First Year (2 TR Wallmounted split AC) |
| 8 | E8 | Comprehensive maintenance of following capacity air conditioners of all makes at different locations including and providing all necessary consumables and spares complete as required as per special conditions. For First Year (3 TR Tower type split AC) |
| 9 | E9 | Comprehensive maintenance of following capacity air conditioners of all makes at different locations including and providing all necessary consumables and spares complete as required as per special conditions. For First Year (4 TR Cassette type split AC) |
| 10 | E10 | Comprehensive maintenance of following capacity air conditioners of all makes at different locations including and providing all necessary consumables and spares complete as required as per special conditions. For Second Year (1.5 TR Wallmounted split AC) |
| 11 | E11 | Comprehensive maintenance of following capacity air conditioners of all makes at different locations including and providing all necessary consumables and spares complete as required as per special conditions. For Second Year (2 TR Wallmounted split AC) |
| 12 | E12 | Comprehensive maintenance of following capacity air conditioners of all makes at different locations including and providing all necessary consumables and spares complete as required as per special conditions. For Second Year (3 TR Tower type split AC) |
| 13 | E13 | Comprehensive maintenance of following capacity air conditioners of all makes at different locations including and providing all necessary consumables and spares complete as required as per special conditions. For Second Year (4 TR Cassette type split AC) |
| 14 | E14 | CMC of 50LPH, 80 ltr tank capacity, Water dispensers of Normal, Cool and Hot mode with inbuilt RO & UV at various locations including and providing all necessary consumables and spares as per special conditions, including quarterly replacement of all filters and yearly replacement of membranes etc., complete as required. First Year |
| 15 | E15 | CMC of 50LPH, 80 ltr tank capacity, Water dispensers of Normal, Cool and Hot mode with inbuilt RO & UV at various locations including and providing all necessary consumables and spares as per special conditions, including quarterly replacement of all filters and yearly replacement of membranes etc., complete as required. Secound Year |
| 16 | E16 | Decorating the Airport Terminal building with LED Decorative serial light of 250 coils each coil of minimum 40 LED lamps, running design dispaly, running serial belt of 05 coils preferably in tri colour pattern on the occasion of Independence day / Republic day each time for 3 days including prefix & suffix to the actual day of function etc.as required. |
| 17 | E17 | Providing decorative illumination with multicolour LED colour wash flood light of minimum 10 nos for Independence day / Republic day with required cables and all accessories to illuminate the facia of the buildings each time for 3 days including prefix & suffix to the actual day of function etc.as required as directed by the Engineer -In- Charge. |
| 18 | E18 | Lifting of Submersible Pumps of various capacities from the existing Bore well/Well and reinstalling the Submersible Pumps in the existing bore well / well (After servicing / repairing both are exclusive) complete as required. |
| 19 | E19 | Rewinding of following capacity submersible pumps including replacement of damaged parts such as inlet bese, bushes, thrust bearing set, neck rings etc, including reassembling, painting, testing, transpotation etc as required. Upto 3 HP |
| 20 | E20 | Rewinding of following capacity submersible pumps including replacement of damaged parts such as inlet bese, bushes, thrust bearing set, neck rings etc, including reassembling, painting, testing, transpotation etc as required. 5 to 6 HP |
| 21 | E21 | Rewinding of following capacity submersible pumps including replacement of damaged parts such as inlet bese, bushes, thrust bearing set, neck rings etc, including reassembling, painting, testing, transpotation etc as required. 10 HP |
| 22 | E22 | Repair & Rewinding of 1400 / 1200 mm Sweep Ceiling fan i/c replacement of spares as required. |
| 23 | E23 | Repair & Rewinding of all capacities of exhaust fan i/c replacement of spares as required. |
| 24 | E24 | Painting of electrical panels, CCR Panels, GLF Fixtures, DGs and street light poles etc., installations with two coats of synthetic enamel paint of approved shade quality and brand after applying two coats of redoxide i/c scrapping and cleaning, providing putty wherever required and inscription etc., as required. |
| 25 | E25 | Execution of items of schedule of rates CPWD DSR-2022 as and when required for attending breakdowns, repair & maintenance and upkeep of internal and external electrical installations as per direction of E-I-C at different locations in operational area/Terminal Building/Colony as per the special Terms and Conditions in addition to General Terms and Conditions of Contract as required. The bidder shall quote the rate for 01 (one) job corresponding to the value of Rs.2,36,000/- (Inclusive of GST) in INR only and percentage above / below shall be calculated by AAI and paid accordingly. Note- The rate provided in DSR 2022 is inclusive of GST at the rate of 12 percentage, however the contractor has to quote the amount in rate column, including GST, the payment shall be made to contractor as mentioned in special conditions of tender document. For First Year |
| 26 | E26 | Execution of items of schedule of rates CPWD DSR-2022 as and when required for attending breakdowns, repair & maintenance and upkeep of internal and external electrical installations as per direction of E-I-C at different locations in operational area/Terminal Building/Colony as per the special Terms and Conditions in addition to General Terms and Conditions of Contract as required. The bidder shall quote the rate for 01 (one) job corresponding to the value of Rs. 2,36,000/- (Inclusive of GST) in INR only and percentage above / below shall be calculated by AAI and paid accordingly. Note- The rate provided in DSR 2022 is inclusive of GST at the rate of 12 percentage, however the contractor has to quote the amount in rate column, including GST, the payment shall be made to contractor as mentioned in special conditions of tender document. For Second Year |