|
| 1 | Supply and installation work |
| 2 | Cat7 Cable: Cable, Copper, Category 7A, 1000 MHz E10, 4 Pair, Solid, S/FTP, LSOH-1, Violet, Reel, 500 Meter |
| 3 | Switch Side Patch Cord 1 Mtr: Copper, Patch Cord, Tera 4-Pair, RJ45, Category 6A, S/FTP, T568B, Stranded, CM/LSOH-1, Ivory Cable, White Boot, 1 Meter. |
| 4 | User Side Patch Cord 2 Mtr: Copper, Patch Cord, Tera 4-Pair, RJ45, Category 6A, S/FTP, T568B, Stranded, CM/LSOH-1, Ivory Cable, White Boot, 2 Meter |
| 5 | Network IO User Side: Copper, Outlet, TERA, Shielded, Category 7A/8, TERA, Flat, Black, Tool-Less, T568A/B, with Door, 22-23 AWG - User Side |
| 6 | Network IO Rack Side: Copper, Outlet, TERA, Shielded, Category 7A/8, TERA, Flat, Black, Tool-Less, T568A/B, with Door, 22-23 AWG- Panel Side |
| 7 | Face Plate User Side: Faceplate, 10G, British, Single Gang, 2 Openings, MX, White |
| 8 | Fibre Cable Single Mode: Cable, 6 Fibre, XGLO, Singlemode, OS1/OS2, 8.3/125, Outside Plant, Loose Tube, Armoured, MDPE, Black, 1 Kilometre, International |
| 9 | Rack: Wall-mounted enclosure of dimensions 600W x 15U x 600D with a front sheet of steel and a glass door, top and bottom covers with cable entry provision, integrated side walls, 1 pair of 19 inch angles with wall mounting provision, and captive hardware(pack of 20).Colour RAL 7035 230V AC Fan, 90 cfm with 1 mts long cable. 19 inch mountable socket strips with 6 nos of 5A universal sockets with 2 mts long power chord. 1U 19 inch, Horizontal Cable Manager (Zinc blue plated) Wall Bracket Kit 10mm (pk of 4) |
| 10 | 40mm 6kg ISI Make HDPE Pipe for Fibre Laying |
| 11 | Labour: Laying of HDPE Pipe for Fibre |
| 12 | Labour: Laying of UTP Cable along with all accessories, which include 32 mm conduits with accessories, Trunking and casing capping as per the requirement (Bidder to select the accessory material as per the specifications defined in section 6) (Actual meter reading generated during the cable testing will be considered for payment) |
| 13 | Labour: Laying of Fibre Cable in Pre-Laid Conduits and TRUNKS |
| 14 | Labour: Fixing of Rack up to 18 U Size with Dressing |
| 15 | Labour: Fixing of the Patch Panel in the Rack along with the Termination of the Cable |
| 16 | Labour: Termination of CAT7A IO on the user side |
| 17 | Labour: Termination of CAT7A IO on the jack Panel Side |
| 18 | Labour: Fixing of LIU in The Rack |
| 19 | Labour: Fibre Splicing Per core |
| 20 | Labour: Labelling and Feruling Charges |
| 21 | Labour: Fibre and Copper Certification Charges (Third Party). Copper Certification to be done using CAT7A Tester(Old Cables are not Included) Please Enable Macros to View BoQ information |