|
| 1 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause |
| 2 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with al lifts and leads transportion to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical specification clauses 303.1. Including stablization with 2% slaked lime including its mixing with rotavator complete. |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading II as per Technical Specification Clause 405. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-III as per Technical Specification Clause 405. |
| 6 | Brick edging on both side of road with M-150 class bricks on edges 3\\" wide and 4-½\\" deep laid with mud mortar finished to the required temples in proper alignment and also dressing ramming the excavated eart and directed by E-in-C. |
| 7 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 8 | Providing and applying tack coat with Bitumen VG-10 using emulsion distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 9 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A as per Technical Specification Clause 508. |
| 10 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, @ 0.65 kg/m2 as per Technical Specification Clause 510 |
| 11 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with al lifts and leads transportion to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical specification clauses 303.1. Including stablization with 2% slaked lime including its mixing with rotavator complete. (For patri) |
| 12 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. |
| 13 | Sand fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 |
| 14 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 15 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 |
| 16 | Providing and laying reinforced cement concrete 1000 mm pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. |
| 17 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 |
| 18 | Providing concrete for plain/ reinforced concrete 1:2:4 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 19 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 20 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause |
| 21 | Construction of gule pipe culvert 350 mm dia pipe |
| 22 | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms, making up of berms/shoulders maintenance of drain, maintenance of culvert, maintennance of guard rails and parapet. maintenance of road sign, speed breakers, standing tree at adjacent to road wherever required maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc. white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23- 1099/113/2023 dated 16.01.2024 & Enc lettere по. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt. Maintenance cost for 1st year @ 0.00% cost of PC Work |
| 23 | Maintenance cost for 2nd year @ 0.75% cost of PC work |
| 24 | Maintenance cost for 3rd year @ 1.50% cost of PC work |
| 25 | Maintenance cost for 4th year @ 2.25% cost of PC work |
| 26 | Maintenance cost for 5th year @ 3.00% cost of PC work Please Enable Macros to View BoQ information |