| 1 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause |
| 2 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with al lifts and leads transportion to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical specification clauses 303.1. Including stablization with 2% slaked lime including its mixing with rotavator complete. |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-III as per Technical Specification Clause 405. |
| 5 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, |
| 6 | Earth Work in filling in both side of road patries in embankment road with BC soil, cutting to be in the form of regular pits not exceeding 0.50 m in depth including 2.0 m lift and 10 m. lead. The earth from cutting to be used as spoil banks within 10 m. distance.(with compaction) |
| 7 | Earth work in excavation in trenches for foundation in ordinary soil including lift upto 1.5m lead upto 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by Engineer-in-charge with in a distance of 50m. |
| 8 | Providing and laying in cement concrete 1:4:8 (graded stone ballast 40 mm nominal size : 6 fine sand : 1 cement ) and curing complete including supply of all material, labour T&P etc. required for proper completion of the work as directed by Engineer |
| 9 | Class 150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour, curing and T&P etc. required for proper completion of the work. |
| 10 | Providing and laying in cement concrete 4:2:1 (4 graded stone grit 20 mm nominal size : 2 sand : 1 cement ) and curing complete including supply of all material, labour T&P etc. required for proper completion of the work as directed by Engineer-in-charge |
| 11 | 12mm thick plaster with cement and fine sand in 1:4 including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I.No. 584) |
| 12 | Construction of gule pipe culvert 350 mm dia pipe |
| 13 | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms, making up of berms/shoulders maintenance of drain, maintenance of culvert, maintennance of guard rails and parapet. maintenance of road sign, speed breakers, standing tree at adjacent to road wherever required maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc. white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23- 1099/113/2023 dated 16.01.2024 & Enc lettere по. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt. Maintenance cost for 1st year @ 0.00% cost of PC Work |
| 14 | Maintenance cost for 2nd year @ 0.75% cost of PC work |
| 15 | Maintenance cost for 3rd year @ 1.50% cost of PC work |
| 16 | Maintenance cost for 4th year @ 2.25% cost of PC work |
| 17 | Maintenance cost for 5th year @ 3.00% cost of PC work |
| 18 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause |
| 19 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with al lifts and leads transportion to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical specification clauses 303.1. Including stablization with 2% slaked lime including its mixing with rotavator complete. |
| 20 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 21 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading II as per Technical Specification Clause 405. |
| 22 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-III as per Technical Specification Clause 405. |
| 23 | Brick edging on both side of road with M-150 class bricks on edges 3\\" wide and 4-½\\" deep laid with mud mortar finished to the required temples in proper alignment and also dressing ramming the excavated eart and directed by E-in-C. |
| 24 | Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 25 | Providing and applying tack coat with Bitumen VG-10 using emulsion distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 26 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A as per Technical Specification Clause 508. |
| 27 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, @ 0.65 kg/m2 as per Technical Specification Clause 510 |
| 28 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with al lifts and leads transportion to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical specification clauses 303.1. Including stablization with 2% slaked lime including its mixing with rotavator complete. (For patri) |
| 29 | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms, making up of berms/shoulders maintenance of drain, maintenance of culvert, maintennance of guard rails and parapet. maintenance of road sign, speed breakers, standing tree at adjacent to road wherever required maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc. white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23- 1099/113/2023 dated 16.01.2024 & Enc lettere по. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt. Maintenance cost for 1st year @ 0.00% cost of PC Work |
| 30 | Maintenance cost for 2nd year @ 0.25% cost of CC work |
| 31 | Maintenance cost for 3rd year @ 0.50% cost of CC work |
| 32 | Maintenance cost for 4th year @ 0.75% cost of CC work |
| 33 | Maintenance cost for 5th year @ 1.00% cost of CC work Please Enable Macros to View BoQ information |