| 1 | Bar Screen Supply, Installation of Manual Bar Screen made of MSEP flat 40x5 mm size, with clear opening of 10 mm, for trapping large size floating impurities from incoming sewage (there will be two bar screen in bar screen chamber of RCC as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 2 | Air diffusers FOR Effluent Collection tank Supply, installation, testing and commissioning of coarse bubble diffusers system with HDPE/PP (10 kg/cm2 rating ) pipe grid as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 3 | Raw Effluent Pumps Supply, installation, testing and commissioning of centrifugal submersible raw Effluent lifting pumps to pump effluet from equalisation tank to Flocuulator with casing of cast iron, make: KSB, Grund fos or Kirloskar complete with pressure gauge, NRV and control valve capable of delivering 5 KL per hour Effluent water at minimum head of 15 m & solid handling capacity of 35 mm with low & high level sensors/switches for Auto ON/OFF, continuous duty, suitable for operation on 415 volt 50 Hz, 3 phase AC supply having a minimum horse power rating necessary to drive the above pump - 2 Lots having 2 Pumps each (1W + 1S) as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 4 | Chemical Dosing Systems For Lime / Alum / Sod. Thio Sulphate Supply, installation, testing and commissioning of dosing pump of Milton/ Prominent/ Minidose / Unitech/ Unitech make,of capacity 100 litre per hour and head 2.0 kg per cm2 , operated on Sodium Thio Sulphate Solution , Alum, Lime . The unit shall consist of 03 no. 500 litters HDPE/ LDPE tank for solution preparation with complete set of pipes, valves and fittings i/c connections as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 5 | Chemical Dosing Systems For Poly Electrolite Supply, installation, testing and commissioning of electro-magnetic dosing pump of Milton/ Prominent/ Minidose / Unitech/ Unitech make,of capacity 6 litre per hour and head 3.0 kg per Sq.cm , operated on Sodium Thio Sulphate Solution . The unit shall consist of one no. 500 litters HDPE/ LDPE tank for solution preparation with complete set of pipes, valves and fittings i/c connections as required. |
| 6 | Flocculator Supplying, installing, testing and commissioning of MSEP Flocclutaor for 3 KLPH Capacity with Slow speed Agitator of SS 304 for floculation complete with single phase motor for flash mixer. |
| 7 | Primary Tube settler Supply Installation Testing and commissioning of Primary Tube settler MOC MSEP 5 MM Capacity 3 KLPH with Sludge seperator media of PP/PVC for for solid and liquid separation to be installed in Primary tube settler tank as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 8 | Air diffusers FOR Sewage Collection Tank Supply, installation, testing and commissioning of coarse bubble diffusers system with HDPE/PP (10 kg/cm2 rating ) pipe grid with as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 9 | Raw sewage Pumps : Supply, installation, testing and commissioning of centrifugal submersible raw Sewage lifting pumps to pump effluet from equalisation tank to Anoxic Tanks with casing of cast iron, make: KSB, Grund fos or Kirloskar complete with pressure gauge, NRV and control valve capable of delivering 10 KL per hour Effluent water at minimum head of 15 m & solid handling capacity of 35 mm with low & high level sensors/switches for Auto ON/OFF, continuous duty, suitable for operation on 415 volt 50 Hz, 3 phase AC supply having a minimum horse power rating necessary to drive the above pump - 2 Lots (1W + 1S)as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 10 | Air Diffusion System for MBBR Reactor Supply, installation, testing and commissioning of fine bubble diffusers with Silicon Membrane, having suitable dimensions complete with Aeration grid make it retrievable & to provide clog-free oxygen for MBBR as per requirement for 150 KLD system as required as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 11 | MS Prefabricated STP cum ETP Aeartion Tank - MS with internal FRPand Outer Painted : Supplying , installing, testing and commissioning of MS with internal FRP & outer Painted Effluent Cum Swage treatment plant, each having in built one , Anoxic Tank ,Aeretion-I & Aeration -II, Tube settling tank, with Platform provision on each plant and railing etc., as per approved OEM's design and capacity but should have minimum retention time of 2 Hrs for Anoxic Tank , 8 Hrs for Aeration tank, Minimum thickness of MS sheet should be 5 mm with 2mm FRP internal .( The Pant should have enough supports of ISMC on Side to avoide the Bulzing and Base of ISMB ) as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 12 | AIR BLOWERS FOR Complete Plant Supply, installation, testing and commissioning of Twin Lobe design type air blower of Make: Kay International / Everest / TMVT complete with belt driven induction motor of Siemens / Kirloskar / Crompton / ABB of 1500 RPM, continuous duty, designed for operation on 415 volt , 50 Hz, 3 phase AC supply, having a minimum horse power rating necessary to drive the above blower, alongwith accessories like rigid CI casing and side plates, silencer, base plate, Anti-friction bearings, Rotary oil sealings having horizontal configuration, common base frame, suction filter , non return valve, V belt ,safety valve, belt guard, drive and driven pulleys, pressure gauge, inter connection piping, anti vibration pads as required - 2 Lots (1W + 1S) Capcity 350 CuM/ Hrs @5000 MMWC as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 13 | MBBR Media Supplying, filling and commissioning of specially designed MBBR media made of virgin poly propylene plastic with specific surface area not less than 500 M2 / M3 of media to support the growth of biomass required in the reactors for each 250 KLD ETP CUM STP as required of make Cool deck / MM Aqua / Eco Aqua - 1 Lot (10 m3) as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 14 | Secondary Tube settler Supply, installation, testing and commissioning of Secondary Tube settler with settling media made from PVC cylindrical pieces having minimum thickness 1.0mm, V type hexagonal cross section, with total vertical height of media minimum 860 mm for solid and liquid separation to be installed in Secondary Tube Settler tank for along with suitable sludge removal arrangement either by pumps or air lifting pumps as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 15 | Sludge Recycle Pumps : Supply, installation, testing and commissioning of centrifugal, self priming, mono block, Non submersible Sludge recycle pumps to pump sewage from Lamella Clarifier to aeration tank of standard make Kirloskar / Johnson with casing of cast iron, parts like impeller, shaft sleeve wearing ring of non-corrosive metal like bronze/stainless steel/gun metal and shaft of stainless steel complete with pressure gauge, NRV and control valve capable of delivering 2 KL/H sewage water at minimum head of 10 m, with synchronous speed motor of 2900 RPM, continuous duty, designed for operation on 415 volt , 50 Hz, 3 phase, AC supply, having a minimum horse power rating necessary to drive the above pump - 2 Lots (1W + 1S) as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 16 | COAGULANT DOSING SYSTEM :Supply, installation, testing and commissioning of electro-magnetic dosing pump of Milton/ Prominent/ Minidose / Unitechmake,of capacity 6 litre per hour and head 3.0 kg per cm2 , operated on Alum / Poly electrolyte, Coagulant dosing unit . The unit shall consist of one no. 500 litters HDPE/ LDPE tank for solution preparation with complete set of pipes, valves and fittings i/c connections as required. - 1 Lot as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 17 | CHLORINE DOSING SYSTEM : Supply, installation, testing and commissioning of electro-magnetic dosing pump Milton/ Prominent/ Minidose / Unitechmake, of capacity 6 Litre per hour head 3.0 kg per cm2 , operated on Chlorine dosing unit . The unit shall consist of One no. 500 litres HDPE/ LDPE tank for solution preparation with Complete set of pipes, valves and fittings.(The free chlorine content in the filtered water shall not be less than 0.5 PPM.) - 1 Lot as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 18 | Filter Feed Pumps Supply, installation, testing and commissioning of centrifugal mono block, Non submersible filter feed pumps to pump water from filter feed tank to sand filter with casing of cast iron, other parts like impeller, shaft sleeve wearing ring of non-corrosive metal like bronze/stainless steel/gun metal and shaft of stainless steel complete with pressure gauge, NRV and control valve capable of delivering 20 m3/ hr clear water at minimum head of 30 m with speed of 2900 RPM, continuous duty, designed for operation on 415 volt , 50 Hz, 3 phase, AC supply, having a minimum horse power rating necessary to drive the above pump - 2 Lots (1W+1S) of make Kirloskar / Crompton as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 19 | Multi Grade Sand Filter for 150 KLD capacity : Supply, installation testing and commissioning of multi-grade pressure sand filter of dia 1200mm and height 1800 mm, for filtration of treated sewage water. The filter shall be suitable for 20 m3/hr flow rate and designed to operate for round the clock operation. The filter vessel shell will be fabricated out of MS plate 6 mm thick with dish ends out of 8 mm thick plate and epoxy painted internally and externally with one coat of red oxide primer and two coats of enamel paint. The filter shall be fitted with inlet distribution and bottom collecting system.Complete set of valves, pressure gauge with Sampling cocks, back wash arrangement, man holes of required size , air vent and frontal Mild steel C class pipe work with butterfly valves complete as required. Filtration rate - 15 Cum / Hr / M2 Back wash duration - Once in 23 hours for 20 min, Filtering Media - Multi grade of Anthracite / Sand / Pebbles as specified. Tested Pressure - 5 kg/cm2 as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 20 | Activated Carbon Filter (ACF) for 150 KLD capacity: Supply, installation, testing and commissioning of activated carbon filter of dia 1200mm and height 1800 mm, for filtration and removal of colour and odour in treated sewage water. The filter shall be suitable for 20 m3/hr flow rate and designed to operate for round the clock operation. The filter vessel shell will be fabricated out of MS plate 6 mm thick with dish ends out of 8 mm thick plate and epoxy painted internally and externally with one coat of red oxide primer and two coats of enamel paint. The filter shall be fitted with inlet distribution and bottom collecting system. Complete set of valves, pressure gauge with Sampling cocks, back wash arrangement, man holes of required size , air vent and frontal MS pipe work with butterfly valves complete as required . Filtration rate - 15 Cum / Hr / M2, Back wash duration - Once in 23 hours for 20 minutes, Filtering Media - Activated Carbon Pressure Drop across unit. - 1.0 kg/sq.cm (max) Tested Pressure -5 kg/cm2 as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 21 | Ultrafilteration Palnt with Softener UF 8.5 m3/hr Fully Autometic and Standby Pumps With Auto Back wash Provision , SS 304 Skid , With Softener having OBR 150 KLD Capacity MOC MSEP as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 22 | Screw Press- Supplying, installationBLO, testing and commissioning of screw press flow rate 3 m3/hr, barrel construction-SS 304 fixed and moving ring, tghickness of the rings 3mm, screw power supply:1.0HP, 400 VOLT/60Hz/3PHASE/1440 RPM, make of Gear Box: Premium stephan/Bonvatio, Moc of the Machine: SS 304, with Flocculation tank and dosing pump 150 LPH(working+standby) make- AKASH/BLOWVAC/INDUSMATRIX/Greentech/Equivalent as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 23 | Supply, installation, testing & commissioning of Sludge loading / Disposal pump having a liquid discharge ate of 5 cum/hr. in at 40m head, cast iron body, hardened steel / SS single helical rotor and shaft, with safety release valve, Non return valve and all necessary accessories with TEFC induction motor of class \\"F\\" insulation & efficiency class EFF-1, suitable for operation on 415 volts ±10%, 3 phase, 50 Hz, A.C. supply complete in all respects and as per specifications. 1 Nos. (1Working ) as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 24 | INTER CONNECTING PIPING / Valves/ EMF Supply, installation, testing & commissioning of Interconnecting piping of Mild Steel b class ( Jindal / Tata make) & Valves ( Sant/ Zoloto/ Leader make) etc. for connecting complete system as required - 1 Lot with Electro Magnetic Flow Meter of Suitable Size as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 25 | Control Panel : Common for Entire ETP CUM STP of 150 KLDFabricating, Supplying, erection, testing & commissioning of totally enclosed, free standing, indoor floor mounted, , compartmentalized, sectionalised, extendable type, dust, damp and vermin proof with suitable natural ventilation arrangement , front and rear accessible, lockable, power cum control cubicle panel of having suitable MVA breaking capacity, fabricated from 2 mm thick CRCA sheet steel, (with IP 42 degree of protection), chemically treated with seven tank process, powder coated with approved colour shade, providing &fixing 4 strip PVC sleeved copper bus-bars, bus bar supports, interconnecting from bus bar to outgoing switches /MCCB's including earthing the panel etc. as required. The panel shall be suitable for operation on 3 phase, 415 V, 50 Hz, AC supply, having suitable cable alleys and shall be mounted on Hot Dip Galvanised MS Channels on wall/floor as per specifications including supply & fixing the following accessories complete etc. as required.INCOMING SECTION :i) 100 Amps.,415 V, 36 KA,4 Pole panel mounting type MCCB with microprocessor release -- 1 No., ) 0 – 100 Amps. Digital Ammeter with CTs ,selector switch &protection fuses --1 Set. 0 - 500 volts Digital Voltmeter with selector switch and protection fuses - 1 Set 400 Amps 4 strip Copper bus bars of suitable length. --1 set Phase indicating lamps (LED type) with toggle switches-- 3 Nos. Digital energy meter, 3 phase. Single phase preventer OUT GOING FEEDERS All Pumps and Blowers etc. 415 V, 4 Pole panel mounting type MCB for each pump/ Motor etc . Starter of suitable rating , including thermal over load protection on all the three phases with adjustable setting -1No, timer, relay contactor, and ON/OFF luminous push button, indicating lamps, level controller switch for all pumps and other necessary accessories, 02 nos. single phase MCB for Dosing pumps etc. |
| 26 | supplying and fixing of suitable sizes Armoured XLPE copper wire cable required for whole ETP CUM STP on wall/ floor/tray for connecting various pumps / motors to Control panel as required - 1 Lot as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 27 | Operation & maintenance of STP cum ETP plant including cost of providing & deploying expert operator experienced in plant operation & maintenance round the clock ( in three shift with one operator in each shift) and one helper in day shift with operator & for adjusting duty as reliever for duty on weekly rest, periodical checking of the plant i/c cost of oiling , greasing, routine maintenance , necessary safety arrangements as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 28 | Routine Maintenance of Plant, day to day operation consumable such as gear oil, blower belt and disinfectant chemical ( Hypo / DWPE solution and Bacterial Solution as per SPCB / CPCB guidelines (EM solution etc.) along with disposal of dried sludge as per direction of Engineer-in-charge. The rate includes all the cost involved in above running and maintenance except for electricity for operation which shall be provided by the client department free of cost as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. |
| 29 | FRP Treated water tank of 10kl capacity make-Akash/MACSUN/INDUSMATRIX/Greentech/Equivalent as required as per direction of Engineer in Charge and as per HP.PWD. specification including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. Please Enable Macros to View BoQ information |