| 1 | Site clearance, layout cleanning of site Clearing jungle including uprooting of rank vegetation, grass, brush wood, and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.and temprery const. off huttment etc. |
| 2 | De-Watering of pond |
| 3 | E/W in Excavation in pond in liquid mud ie lift upto 1.50 meter and lead upto 50 meter and removal and disposal of liquid mud as directed by the Engineer incharge up ot a distance of 50 metersas per S.I.No. 258(a). pond |
| 4 | Removal and disposal of liquid mud distance of 5 Km cartage. |
| 5 | Excavation of foundation in ordinary soil (Loam clay or sand including lift upto 1.50 meter and lead upt 30 meter and including filling. Watering and ramming of ecavated earth into the trenches or into the space between the building and sides of foundation trenches or into the lingth and removal and disposal of surplush earth as directed b the Engineer incharge up ot a distance of 30 meters from the foundation trenches S.I.No. 251. Outer wall Inner wall Stair footing Stair footing |
| 6 | P/L Cement concrete in 1:6:12 with cement, fine sand and 40mm gauge brick ballast in foundation as per s.i. no. 273 In Foundation Stair footing Stair footing |
| 7 | Earthwork filling with 05 km cartage ncluding remening and dressing of site as per direction of E/I |
| 8 | R.C.C. work with cement, approved coarse sand 2 cm. gauge approved stone ballast in the proportion of 1:1.5:3 in lintels of doors and windows etc. and bed plates, excluding the supply of reinforcement and its bending but including its bending the same with 24 BWG, GI bending wire and including wire as also including providing and fixing necessary centering and shuttering and its removal after completion of work & supply of all other materials labour and tools and plants etc. required for the proper completion of the work. (Labour rate includes cost of centering & shuttering) As SOR SI No 284(b) column beam Stair beam Stair slab |
| 9 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work( when not included in an over all rates) wrought to required shape as nessessary including bending for proper completion of the work and including supply of all steel and wastages and overlaping hookes. as SOR SI no 504 |
| 10 | Class 150 sub class \\"A\\" brick work in 1:4 cement and coarse sand of 1.25 fineness modulous (FM) mortar in foundation and plinth, including supply of all materials, labour and T&P etc. required for the proper completion of the work. S.I.No. 305(b) Path R/W Path R/W Path R/W Path R/W Path R/W Path R/W for gate |
| 11 | Class 150 sub class \\"A\\" brick work in 1:3 cement and coarse sand of 1.25 fineness modulous (FM) mortar in Superstructure including supply of all materials, labour and T&P etc. required for the proper completion of the work. S.I.No. 307(a) for gate |
| 12 | 2.50cm. (1\\") thick damp proof coarse with cement concrete consisting of one part cement 1.5 parts approved coarse sand and 3 parts approved 13 mm. (1.5\\") graded stone grit and including water proofing materials as ordered by the Engineer-in-charge in the proportion as specified by the manufacturers. As per SOR Item No. 361 |
| 13 | 12 mm thick plaster with cement and fine sand mortar 1.25 FM in 1:3 on brick work (minimum thickness not less then 10 mm) including raking he joints washing and cleaning and supply of all material labour and tools and plants etc. required for the proper completion of the work. S.I.No. 583 |
| 14 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete as per DSR No. 8.31 gate |
| 15 | Supply and fixing mild steel or Iron work in heavy size such as truss builts( railling ) all complete work etc as per s.i no 503 Railing Railing |
| 16 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 17 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 18 | Interlocking Tiles - Rubber mulded reflective Zig Zag 80mm Providing and laying of interlocking concrete .. Specification cl 1504 |
| 19 | Painting or vansishing on iron worksin small areas or new wood work with one coat of ready mixed priming paint & Two coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T & P etc. required for proper completion of work paint to be used should confirm to the I.S.I No. 103 1950. Railing gate |
| 20 | Supply and fixing of 350 mm dia NP-3 hume pipe including cost of material ,loading, Unloading, cartage up to site ,all taxes etc.complete |
| 21 | Supply & Fixing of Park RCC Bench |
| 22 | S/F of 2 H.P. Summersible Pump with boaring & fitting of connection trap etc all cost complete including 150mm dia pvc pipe 6 kg/m2 jali etc. As per market rate |
| 23 | S & F of Electric light with 7 mtr long electric pole complete in all respect . |
| 24 | S/F of plantation complete in all respect . Please Enable Macros to View BoQ information |