| 1 | Dismantaling brick or stone masonary in lime or cement mortar under 3m ht including stacking the use ful materials for reuse & removing the debris within 50 Mtr lead as per direction of EIC |
| 2 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. |
| 3 | Hire and running charge of 5Hp Diesel pump for dewatering as per direction of the EIC |
| 4 | Labour engage for manual cleaning of water hycinths from existing pond and stag at embankment including T&P etc complete as per direction of EIC |
| 5 | Earth work in slushy soil in water upto 0.60 mtr depth requiring the aid of pan & vessel within 50mtr initial lead and 1.50mtr initial lift. |
| 6 | Earth work in excavation of foundation in oridinary soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 7 | Filling in foundation and plinth with sand watered and rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete as directed E.I.C. |
| 8 | Cement concrete (1:3:6) using 40mm and down graded hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. |
| 9 | Laterite stone masonary in cm (1:6) in F&P including watering all costof material conveyance labour t&p etc. complete as per direction of Engineer in charge. |
| 10 | Providing R.C.C. work of M25 grade with 25 mm down grade chips (C.B.) including Hoisting & laying chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge. |
| 11 | TMT reinforcement for R.C.C. work including cutting, bending, binding and placing in position Labor for including cost of binding wire 18 to 20 gauge and cost conveyance of M.S. rod etc. all complete. |
| 12 | Rigid smooth centering and shuttering for C.C. work including stripping the same after completion of stripping time. |
| 13 | Providing & transplanting best quality healthy TREES packing the soil tight around the plant and water properly,including digging the tree pits (holes 1200 mm dia., 1200 mm deep) prior to planting and refilling the same with sweet earth mixed with manure 2 :1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) along with Urea, N.P.K. mixed in proportion as per suppliers specifications, flooding with water, dressing including removal of rubbish and surplus earth if any with all leads and lifts etc, all complete, All trees to be approved before planting inclusive ofmaintenance as specified for one month after planting including rectification/ replacement of any damaged work or plant, watering at required frequency, providing and laying manure with planter box as required etc. all complete. |
| 14 | Laterite block packing flat using old stone including watering all costof material conveyance labour t&p etc. complete for completion of item of work as per direction of Engineer in charge. |
| 15 | Supplying, fitting & fixing of Stainless steel of 304 grade in hand railling using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe beacing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. requered for the complete in all respect. |
| 16 | Providing and fixing in position 3 seaters cement Bench of approved design and make of minimum area 1.5 meter x 0.60meter. Overall all minimum height 0.80 m |
| 17 | Painting two coats with weather seal coat over a coat of water bound wall primer. |
| 18 | Providing weep hole in concrete in return wall with 100mm PVC pipeextending through full width of the structure including cost of materials labour T&P etc complite for completion of itm of wor as per direction of EIC |
| 19 | Metal spall backing in the rear of Backing in the rear of wall steing or weap holes of abutments and for deep drain including cost of materials labour T&P etc complite for completion of itm of wor as per direction of EIC |
| 20 | Providing 20 mm cement plaster over the stone masonry including all cost of the materials, carriage, royality,alltaxes with puning including watering all cost conveyance labour T&P etc. complete Please Enable Macros to View BoQ information |