| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. |
| 2 | Earth work in excavation of foundation in oridinary soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 3 | Transportation of excavated earth and dismantling debris by mechanical means including loading and Unloading within 5 KM lead as per direction of Engineer in charge. |
| 4 | Sand Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge. |
| 5 | Cement concrete (1:4:8) using 40mm and down gradedhard granite hand broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. |
| 6 | Providing P.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge. |
| 7 | Providing R.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge. |
| 8 | TMT reinforcement for R.C.C. work including cutting, bending, binding and placing in position Labor for including cost of binding wire 18 to 20 gauge and cost conveyance of M.S. rod etc. all complete. |
| 9 | Rigid smooth centering and shuttering for C.C. work including stripping the same after completion of stripping time. |
| 10 | Cleaning the existing surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and or compressed air to receive bituminous. |
| 11 | Providing and applying Tack Coat with Bitumern at the rate of 0.20 Kg per Sqm on the prepared surface cleaned including cost of Carriage & Royality taxes etc complete. |
| 12 | Providing and laying 25mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29 prepared by using mastic cooker and laid to required level and slope after cleaning the surface including providing antiskid surface with bitumen precoated finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and at an approximate spaceing of 10 cm centimeter in both direction pressed in to surface when the temperatue of the surface not less than 100 degree centigrade protruding 1 mm to 4 mm over mastic surface all complete. |
| 13 | Raseing man hole chamber including dismantling and reconstruction of road depth 0.15mtr to 0.225 mtr etc complete as per direction of EIC. |
| 14 | Display board with writing painting and photograph (Pre,dring & post) Please Enable Macros to View BoQ information |