| 1 | Hire and running charge of 5Hp Diesel pump for dewatering as per direction of the EIC |
| 2 | Cleaning and grubbing road land including uprooting rank vegetation ,grass ,bushes , shrubs ,saping and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unservicealbe materials and stacking of serviceable materials to be used or auctioned up to lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. as per direction of engineer in charge . |
| 3 | Labour engage for manual cleaning of water hycinths from existing pond and stag at embankment including T&P etc complete as per direction of EIC |
| 4 | Earth work in slushy soil in water upto 0.60 mtr depth requiring the aid of pan & vessel within 50mtr initial lead and 1.50mtr initial lift. |
| 5 | Earth work in excavation of foundation in oridinary soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 6 | Filling in foundation and plinth with sand watered and rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete as directed E.I.C. |
| 7 | Cement concrete (1:3:6) using 40mm and down graded hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. |
| 8 | Laterite stone masonary in cm (1:6) F&Pincluding watering all costof material conveyance labour t&p etc. complete as per direction of Engineer in charge. |
| 9 | Providing R.C.C. work of M25 grade with 25 mm down grade chips (C.B.) including Hoisting & laying chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge. |
| 10 | TMT reinforcement for R.C.C. work including cutting, bending, binding and placing in position Labor for including cost of binding wire 18 to 20 gauge and cost conveyance of M.S. rod etc. all complete. |
| 11 | Rigid smooth centering and shuttering for C.C. work including stripping the same after completion of stripping time. |
| 12 | Supplying and fixing of Pre cast kerb stone of size 600mm x 300mm x 150mm of M-30 grade of approved make, design, colour and size made by Block making machine with proper compaction fixed in required pattern etc. complete in all respect conforming |
| 13 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP - 63:2018. |
| 14 | Providing laying, spreading and compacting graded stone aggregate to \\"WET MIX MACADAM\\" specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achive the desired density as per Clause 406 of MoSRT&H specification for road and bridge works (4th Revision). |
| 15 | Labour for laying sub-base in layers not exceeding 100 mm. watering and compacting to required density in OMC with P.R.R. but excluding costs conveyance of sub-base materials. |
| 16 | Providing P.C.C. (1:2:4) using 12mm size hard granite crusher broken chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge. |
| 17 | Providing & transplanting best quality healthy TREES packing the soil tight around the plant and water properly,including digging the tree pits (holes 1200 mm dia., 1200 mm deep) prior to planting and refilling the same with sweet earth mixed with manure 2 :1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) along with Urea, N.P.K. mixed in proportion as per suppliers specifications, flooding with water, dressing including removal of rubbish and surplus earth if any with all leads and lifts etc, all complete, All trees to be approved before planting inclusive of maintenance as specified for one month after planting including rectification/ replacement of any damaged work or plant, watering at required frequency, providing and laying manure as required etc. all complete. AS per local market rateFox Tail Palm |
| 18 | Oleander Pink 2ft |
| 19 | Jetrapra Red |
| 20 | Nandbardhan Bradlif |
| 21 | Oleander White Mini 2ft |
| 22 | Laterite block packing flat including watering all costof material conveyance labour t&p etc. complete for completion of item of work as per direction of Engineer in charge. |
| 23 | Supplying, fitting & fixing of Stainless steel of 304 grade in hand railling using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe beacing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. requered for the complete in all respect. |
| 24 | Providing and fixing in position 3 seaters cement Bench of approved design and make of minimum area 1.5 meter x 0.60meter. Overall all minimum height 0.80 m |
| 25 | Painting two coats with weather seal coat over a coat of water bound wall primer. |
| 26 | Providing 20 mm cement plaster over the stone masonry including all cost of the materials, carriage, royality,alltaxes with puning including watering all cost conveyance labour T&P etc. complete Please Enable Macros to View BoQ information |