|
| 1 | Supply, fitting, fixing and errection etc complete including all taxes, labour charges complete in all respect of the following itemsGalvanised M+9 Tower (2.92 Tonne each) @Rs 75 per kg |
| 2 | G I Nuts bolt for Tower @ 100kg per Tower |
| 3 | 40mm Dia GI pipe earthing device 3.0mtr long @ 2 Nos for each Lower |
| 4 | 78x8mm GI Flat (4.7kg/mtr) for Tower (20 mtr for each earthing) |
| 5 | 150x150mm GI RS Joist(11mtr long)(34.6kg/mtr)(SAIL/JINDAL/TATA Make) |
| 6 | 150x150mm GI RS Joist(13mtr long)(34.6kg/mtr)(SAIL/JINDAL/TATA Make) |
| 7 | 11KV V Cross arm (10.2kg each ) |
| 8 | 11 KV F clamp 2.9kg each |
| 9 | G.I Back Clamp for V Cross arm (11kv)0.85kg each) |
| 10 | 11KV Pin insulator polymer |
| 11 | Disc insulator (B&S) 70KN polymer |
| 12 | H W fitting(B&S)70KN,4Bolt |
| 13 | 33KV V Cross arm (22kg ), GI |
| 14 | 33 KV F clamp |
| 15 | G.I Back Clamp for V Cross arm (33kv)1.7kg each) |
| 16 | 33 KV polymer pin insulator |
| 17 | Disc insulator (B&S) 90 KN polymer |
| 18 | H W fitting(B&S)90KN,4Bolt |
| 19 | 100x50X6 mm GI Channel( each 2.8mtr long((9.2kg/mtr)*2no |
| 20 | 75x40X6 mm GI Channel( each 2.8mtr long((6.8kg/mtr)With side angle |
| 21 | 50x50X6 mm GI Channel( each 2.8mtr long((4.5kg/mtr)With side angle |
| 22 | AB Switch (11KV,400A,3pole,50Hz) |
| 23 | AB Switch (33KV,400A,3pole,50Hz) |
| 24 | GI Pipe earthing 40 Dia medium gage 3mtrs, long |
| 25 | Earthing Materials |
| 26 | HT Stay Set (Complete) |
| 27 | HT Stay Insulator Type-C |
| 28 | HT Stay Clamp (1.95kg/pair) |
| 29 | 7/10 SWG GI Stay wire , Grade-2 |
| 30 | 11KV 1 core, 100mm2 XLPE Insulated AAA Conductor (un armoured) |
| 31 | 148mm2 All Aluminium Conductor.AAAC |
| 32 | 3Cx400mm2 11kv XLPE Cable (Armoured),A2XFY |
| 33 | Heat Srinkable Jointing kit for 3Cx400mm2 11kv XLPE Cable (indoor type) |
| 34 | Heat Srinkable Jointing kit for 3Cx400mm2 11kv XLPE Cable (outdoor type) |
| 35 | 3Cx400mm2 33kv XLPE Cable (Armoured),A2XFY |
| 36 | Heat Srinkable Jointing kit for 3Cx400mm2 33kv XLPE Cable (outdoor type) |
| 37 | HDPE Pipe,8\\",10 mtr(spec PE80-PN8,160MM dia) |
| 38 | Lighting arrester(12KV,10KA) Station class for 11kv |
| 39 | Lighting arrester(30KV,10KA) (Station class, class -2) |
| 40 | PG Clamp for 100mm2 AAA Conductor. |
| 41 | PG Clamp for 148mm2 AAA Conductor. |
| 42 | Earthing support (coil type) |
| 43 | Danger plate |
| 44 | Anti Climbing Device made of GI barbed wire, Clamping arrangement etc . (2kg per support) |
| 45 | GI Nuts, Bolts & washer of different Sizes |
| 46 | Sundries |
| 47 | Civil work:-Material cost for Concreting of 11mtr RS Joist pole 2.13mtr*0.40mtr*0.40mtr=0.34cum(PCC 1:3:6)@6500 |
| 48 | Material cost for Concreting of 13mtr RS Joist pole 2.46mtr*0.40mtr*0.40mtr=0.34cum(PCC 1:3:6)@6500 |
| 49 | Installation,testing and Commissioning of 11/33KV 3-way/4-way/5way Ring main unit(RMU) on existing structure as per, Specification including grouting & HT Cable Connections,earthing Connection & Minor site Modification, scope of work excludes earthing chamber and construction of foundation. |
| 50 | Supply & Laying of PIPE HDPE 200 MM DIA PN8,PE 80 through HDD method .scope of work also includes making Trenchless ducts with 200 mm Dia HDPE Pipe casing using HDD machine includig supply of HDPE Pipe as per IS4984,(Providing parabolic graph included in the scope) |
| 51 | Supply & Laying of PIPE HDPE 160MM DIA PN8,PE 80 through HDD method .scope of work also includes making Trenchless ducts with 160 mm Dia HDPE Pipe casing using HDD machine includig supply of HDPE Pipe as per IS4984,(Providing parabolic graph included in the scope) |
| 52 | Laying of 11kv 3C Cable (70sqm to 400sqmm)sqmm in trech/cable tray as per specification including testing of cable.scope of work also includes providing necessary tools, Machinary, Manpower for laying & cable tagging. |
| 53 | BA will provide necessary tools Machinary ,manpower for laying of 33kv 3C Cable (70sqm to 630sqmm)in Trech or HDPE Pipe/Hum pipe |
| 54 | Material cost for Concreting of Stay (1.65mtrx0.3mtrx0.3mtr=0.15cum-PCC 1:3:6)@6500 |
| 55 | pvt. Sub-station:-150x150mm GI RS Joist 11mtr long)(34.6kg/mtr)(SAIL/JINDAL/TATA Make) |
| 56 | 11KV Pin insulator( polymer) |
| 57 | H W fitting(B&S)45KN,4Bolt |
| 58 | Disc insulator (B&S) 45 KN polymer |
| 59 | 100x50X6 mm GI Channel( each 2.8mtr long((9.2kg/mtr)*2no |
| 60 | 75x40X6 mm GI Channel( each 2.8mtr long((6.8kg/mtr)With side angle |
| 61 | 50x50X6 mm GI Channel( each 2.8mtr long((4.5kg/mtr)With side angle |
| 62 | HT Stay set (Complete) |
| 63 | HT Stay insulator TYPE-C |
| 64 | HT Stay clamp (1.95Kg/Pair) |
| 65 | 7/10 SWG Stay wire 12 kg /stay |
| 66 | 11KV 1 core, 100mm2 XLPE Insulated AAA Conductor (un armoured) |
| 67 | LT Distribution Box with MCCB,Alluminium Busbar of single Bay with kit kat fuse for 25KVS S/S |
| 68 | LT Distribution Box with MCCB,Alluminium Busbar of single Bay with kit kat fuse for63KVS S/S |
| 69 | LT Distribution Box with MCCB,Alluminium Busbar for 2 Bay with kit kat fuse for100KVS S/S |
| 70 | Lighting arrester(12KV,10KA) Station class |
| 71 | AB Switch (11KV,200A,3pole,50Hz) |
| 72 | HG Fuse (11KV,200A,3pole)with PI |
| 73 | 40mm Dia GI pipe earthing medium gage 3.0mtr long |
| 74 | Earthing Materials |
| 75 | 25x6mm GI Flat for earthing |
| 76 | 50x6mm GI Flat for neutral earthing |
| 77 | GI Nuts, Bolts & washer of different Sizes |
| 78 | 3.5Cx50mm2 LT PVC Cable (un armoured) |
| 79 | 3.5Cx95mm2 LT PVC Cable (un armoured) |
| 80 | Danger plate |
| 81 | All Cable sockets |
| 82 | Anti Climbing Device made of GI barbed wire, Clamping arrangement etc . (2kg per support) |
| 83 | Sundries for survey,PVC tape,Ampire tape,Danger board,small size nut &Bolt preparation of drawing cable socket etc. |
| 84 | Civil work:-Material cost for Concreting of 11mtr RS Joist pole 2.13mtr*0.40mtr*0.40mtr=0.34cum(PCC 1:3:6)@6500 |
| 85 | Material cost for Concreting of Stay (1.65mtrx0.3mtrx0.3mtr=0.15cum-PCC 1:3:6)@6500 |
| 86 | Installation,testing and Commissioning of 11/0.25KV,25KVA Single phase Distibution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation from site/tent upto 15km,Testing of Transformer at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections. |
| 87 | Installation,testing and Commissioning of 11/0.4kv, 63kVA 3-phase Distribution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation from site/tent upto 15km,Testing of Transformer at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections.BA will Provide neccessary control cable ferruling.control cable shedule,connector, lungs & cable gland at both end of terminations of control cable. |
| 88 | Installation,testing and Commissioning of 11/0.4kv, 100kVA 3-phase Distribution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation from site/tent upto 15km,Testing of Transformer at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections. |
| 89 | Barbed fencing with Grill gate, Metal & Sand |
| 90 | Plinth for 100KVA Transformer |
| 91 | Discom. Sub-station:-150x150mm GI RS Joist 11mtr long)(34.6kg/mtr)(SAIL/JINDAL/TATA Make) |
| 92 | 11KV Pin insulator( polymer) |
| 93 | H W fitting(B&S)45KN,4Bolt |
| 94 | Disc insulator (B&C) 45 KN polymer |
| 95 | 100x50X6 mm GI Channel( each 2.8mtr long((9.2kg/mtr)*2no |
| 96 | 75x40X6 mm GI Channel( each 2.8mtr long((6.8kg/mtr)With side angle |
| 97 | 50x50X6 mm GI Channel( each 2.8mtr long((4.5kg/mtr)With side angle |
| 98 | HT Stay set (Complete) |
| 99 | HT Stay insulator TYPE-C |
| 100 | HT Stay clamp (1.95Kg/Pair) |
| 101 | 7/10 SWG Stay wire 12 kg /stay |
| 102 | 11KV 1 core, 100mm2 XLPE Insulated AAA Conductor (un armoured) |
| 103 | LT Distribution Box with MCCB,Alluminium Busbar of 2Bay with kit kat fuse for 100KVS S/S |
| 104 | LT Distribution Box with MCCB,Alluminium Busbar of 3Bay with kit kat fuse for 250KVS S/S |
| 105 | LT Distribution Box with MCCB,Alluminium Busbar for 6Bay with kit kat fuse for400KVS S/S |
| 106 | LT Distribution Box with MCCB for 16kva s/s |
| 107 | LT Distribution Box with MCCB,Alluminium Busbar of Single Bay with kit kat fuse for 25KVS S/S |
| 108 | LT Distribution Box with MCCB for 10kva s/s |
| 109 | AB Switch (11KV,200A,2pole,50Hz) |
| 110 | HG Fuse (11KV,200A,2pole)with PI |
| 111 | Lighting arrester(12KV,10KA) Station class |
| 112 | AB Switch (11KV,200A,3pole,50Hz) |
| 113 | HG Fuse (11KV,200A,3pole)with PI |
| 114 | Lighting arrester(12KV,10KA) Station class |
| 115 | 40mm Dia GI pipe earthing medium gage 3.0mtr long |
| 116 | Earthing Materials |
| 117 | 25x6mm GI Flat for earthing |
| 118 | 50x6mm GI Flat for neutral earthing |
| 119 | GI Nuts, Bolts & washer of different Sizes |
| 120 | 3.5Cx50mm2 LT PVC Cable (un armoured) |
| 121 | 3.5Cx95mm2 LT PVC Cable (un armoured) |
| 122 | Earthing support (coil type) |
| 123 | Danger plate |
| 124 | All Cable sockets |
| 125 | Anti Climbing Device made of GI barbed wire, Clamping arrangement etc . (2kg per support) |
| 126 | Sundries for survey,PVC tape,Ampire tape,Danger board,small size nut &Bolt preparation of drawing cable socket etc. |
| 127 | Civil work:-Material cost for Concreting of 11mtr RS Joist pole 2.13mtr*0.40mtr*0.40mtr=0.34cum(PCC 1:3:6)@6500 |
| 128 | Material cost for Concreting of Stay (1.65mtrx0.3mtrx0.3mtr=0.15cum-PCC 1:3:6)@6500 |
| 129 | Barbed fencing with Grill gate, Metal & Sand |
| 130 | Installation,testing and Commissioning of 11/0.25KV,10KVA 1/ 3 phase Distibution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation from site/tent upto 15km,Testing of Transformer at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections.BA will provide neccessary control cable ferruling,control cable shedule,connector,lungs & cable gland at both end of termination cable |
| 131 | Installation,testing and Commissioning of 11/0.25kv, 25kVA single phase Distribution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation from site/tent upto 15km,Testing of Transformer at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections. |
| 132 | Installation,testing and Commissioning of 11/0.25kv, 16kVA single phase Distribution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation from site/tent upto 15km,Testing of Transformer at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections. |
| 133 | Installation,testing and Commissioning of 11/0.25kv, 100kVA 3-phase Distribution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections. |
| 134 | Installation,testing and Commissioning of 11/0.25KV,250KVA 3 phase Distibution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation from site/tent upto 15km,Testing of Transformer at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections.BA will provide neccessary control cable ferruling,control cable shedule,connector,lungs & cable gland at both end of termination cable |
| 135 | Installation,testing and Commissioning of 11/0.25kv, 400kVA 3-phase Distribution Transformer on existing structure as per, Specification including loading,unloding,Shifting/Transforation from site/tent upto 15km,Testing of Transformer at site ,Scope of work includes Jumpering/connection at IIT and LT side & Earthing Connections. |
| 136 | Plinth for Transformer |
| 137 | New Sub-station:-150x150mm GI RS Joist 11mtr long)(34.6kg/mtr)(SAIL/JINDAL/TATA Make) |
| 138 | 11KV Pin insulator( polymer) |
| 139 | H W fitting(T&C)45KN,4Bolt |
| 140 | Disc insulator (T&C) 45 KN polymer |
| 141 | 100x50X6 mm GI Channel( each 2.8mtr long((9.2kg/mtr)*2no |
| 142 | 75x40X6 mm GI Channel( each 2.8mtr long((6.8kg/mtr)With side angle |
| 143 | 50x50X6 mm GI Channel( each 2.8mtr long((4.5kg/mtr)With side angle |
| 144 | HT Stay set (Complete) |
| 145 | HT Stay insulator TYPE-C |
| 146 | HT Stay clamp (1.95Kg/Pair) |
| 147 | 7/10 SWG Stay wire 12 kg /stay |
| 148 | 11KV 1 core, 100mm2 XLPE Insulated AAA Conductor (un armoured) |
| 149 | 100KVA, 11/0.4KV, (AL) Transformer BIS energy level-II |
| 150 | 25KVA, 11/0.4KV, (AL) Transformer BIS energy level-II |
| 151 | 63KVA, 11/0.4KV, (AL) Transformer BIS energy level-II |
| 152 | LT Distribution Box with MCCB,Alluminium Busbar of single Bay with kit kat fuse for 25KVS S/S |
| 153 | LT Distribution Box with MCCB,Alluminium Busbar of single Bay with kit kat fuse for 63KVS S/S |
| 154 | LT Distribution Box with MCCB,Alluminium Busbar for 2 Bay with kit kat fuse for 100KVS S/S |
| 155 | Lighting arrester(12KV,10KA) Station class |
| 156 | AB Switch (11KV,200A,3pole,50Hz) |
| 157 | HG Fuse (11KV,200A,3pole)with PI |
| 158 | 40mm Dia GI pipe earthing medium gage 3.0mtr long |
| 159 | Earthing Materials |
| 160 | 25x6mm GI Flat for earthing |
| 161 | 50x6mm GI Flat for neutral earthing |
| 162 | GI Nuts, Bolts & washer of different Sizes |
| 163 | 3.5Cx50mm2 LT PVC Cable (un armoured) |
| 164 | 3.5Cx95mm2 LT PVC Cable (un armoured) |
| 165 | Earthing support (coil type) |
| 166 | Danger plate |
| 167 | All Cable sockets |
| 168 | Anti Climbing Device made of GI barbed wire, Clamping arrangement etc . (2kg per support) |
| 169 | Sundries for survey,PVC tape,Ampire tape,Danger board,small size nut &Bolt preparation of drawing cable socket etc. |
| 170 | Civil work:-Material cost for Concreting of 11mtr RS Joist pole 2.13mtr*0.40mtr*0.40mtr=0.34cum(PCC 1:3:6)@6500 |
| 171 | Material cost for Concreting of Stay (1.65mtrx0.3mtrx0.3mtr=0.15cum-PCC 1:3:6)@6500 |
| 172 | Barbed fencing with Grill gate, Metal & Sand |
| 173 | Plinth for 100KVA Transformer |
| 174 | LT PART-1:-9MTR long 300kg PSC Pole (including Transfortation cost) |
| 175 | GI Base plate (500x500x10mm) for PSC Pole (20kg) |
| 176 | Dead End clamp |
| 177 | Suspension clamp with eye hook (AB Cable) |
| 178 | Pole clamp eye hook(AB cable) |
| 179 | Eye hook for (XLPE Arial bunched Cable) |
| 180 | Insulated piercing connector.Type-A-main 16 to 95sqmm& Tap-16 to 95sqmm |
| 181 | Neutral connector Type-B Suitable for Main 35 to 70 sqmm AAAC & Tap-2.5 to 10 sqmm service cable cover by black Weather resistant insulation cover |
| 182 | Lt stay set |
| 183 | Lt stay clamp |
| 184 | Lt stay insulator |
| 185 | 7/2 (SWG) GI Stay Wire |
| 186 | Earthing support (coil type) |
| 187 | GI Nuts & Boltswasher of Assorted Sizes |
| 188 | Sundries |
| 189 | Civil work:-Material cost for Concreting of 9mtr PSC pole 1.80mtr*0.45mtr*0.45mtr=0.29cum(PCC 1:3:6)@6500 |
| 190 | Material cost for Concreting of Stay (1.65mtrx0.3mtrx0.3mtr=0.15cum-PCC 1:3:6)@6500 |
| 191 | Dismentaling Charge as per TPNODL Estimate Corp/NEG/Dep/30/25-26N:B:. Salvage value @8% to be deducted from the contractor's bill. Please Enable Macros to View BoQ information |