| 1 | Transmission line S/C and D/C :- ( Including carriage of T&P from stores and Shutdown Factor) |
| 2 | Checking and tightening of jumpers |
| 3 | Fixing of vibration damper on earthwire/ACSR Conductor |
| 4 | Replacement of damaged disc Insulators |
| 5 | Replacement of Tension string of insulators |
| 6 | Replacement of Suspension string of insulators. |
| 7 | Replacement of damaged jumpers |
| 8 | Replacement of damaged single tension fittings |
| 9 | Replacement of damaged double tension fittings |
| 10 | Replacement of damaged single suspension fittings |
| 11 | Replacement of damaged double suspension fittings |
| 12 | Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension |
| 13 | Stringing and sagging of ACSR/AAAC conductor including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 14 | Repairing of ground wire when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension |
| 15 | Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies splicing of OPGW wire etc.(complete job) |
| 16 | Tower S/C and D/C:-( Including carriage of T&P from stores and Shutdown Factor) Foundation:-Repairing of damaged foundation and protection wall(Revetment) including back filling of earth & concreting. |
| 17 | Provision of providing crate wall (Gabbon wall) |
| 18 | Tightening of nuts and bolts of tower superstructures including providing of missing ones. a) Tower weight more than 4 tonnes to 7.5 tonnes |
| 19 | b) Tower weight more than 7.5 tonnes |
| 20 | Checking / tightening of tower footing earthing bolts and measuring tower footing resistance. |
| 21 | Branch cutting: under the coridor of 132 KV S/C and D/C transmission line 16 mtr and under tower structure |
| 22 | Replacement of missing tower members. |
| 23 | Reparing damaged conductor by using helical sleeve or Bolted or by shorting method with out lowering the conductor |
| 24 | Fixing of anti-climbing device/Bird Guard over S/C & D/C tower |
| 25 | Fixing of phase plates/No. plates/danger plates over S/C & D/C tower |
| 26 | Fixing of repair sleeves compression type for over ACSR conductor |
| 27 | Provision for tag welding of towers ( first 2 stories) |
| 28 | Providing of labour for earthing of tower (Pipe earthing) |
| 29 | Providing of labour for earthing of tower (counter poise earthing) |
| 30 | Providing of labour Skilled labour |
| 31 | semi skilled labour |
| 32 | un skilled labour |
| 33 | Conducting of survey of 132KV transmission line including cost of equipment |
| 34 | Shifting of T&P Material for Transmission Line works including Four Sheaves pulley,Pulleys,Ropes,Compression machine etc in divisional stores Janipur including manual carriage within store yard from stacking site to loading/unloading site. |
| 35 | Shifting of T&P Material for Transmission Line works including Four Sheaves pulley,Pulleys,Ropes,Compression machine etc in divisional stores Janipur including manual carriage within store yard from loading /unloading site to stacking site. |
| 36 | Unloading / Loading /shifting of Cement in divisional store Janipur Including manual Carriage within store yard. |
| 37 | Shifting of Tower material including all accessories in divisional store Janipur Including manual Carriage within store yard from stacking site to sorting/loading site. |
| 38 | Shifting of Disc Insulators/Fittings in divisional store Janipur Including manual Carriage within store yard from stacking site to carriage/loading site. |
| 39 | Making space by way of shifting material like fittings, clamps, disc insulators, conductors, control cable for the incoming material. |
| 40 | Shifting of Disc Insulators/Fittings in divisional store Janipur Including manual Carriage within store yard from unloading site to stacking site. |
| 41 | Unloading / Loading of conductor/control cable etc in divisional store Janipur Including manual Carriage within store yard. Please Enable Macros to View BoQ information |