| 1 | Mechanical transportation, loading, unloading and handling of various items such as pump parts, motors, starters, voltage stabilizers, coil assemblies, welding tools & plant, etc. using appropriate means of transport as under: |
| 2 | Private car, auto-rickshaw or similar with 1.0 km lead |
| 3 | Extra per kilometer for lead >1.0 kms upto 5.0 kms |
| 4 | Extra per kilometer for lead >5.0 kms upto 10.0 kms |
| 5 | Extra per kilometer for lead >10.0 kms upto 20.0 kms |
| 6 | Extra per kilometer for lead >20.0 kms upto 30.0 kms |
| 7 | Load carrier auto, mini van or similar with 1.0 km lead |
| 8 | Extra per kilometer for lead >1.0 kms upto 5.0 kms |
| 9 | Extra per kilometer for lead >5.0 kms upto 10.0 kms |
| 10 | Extra per kilometer for lead >10.0 kms upto 20.0 kms |
| 11 | Extra per kilometer for lead >20.0 kms upto 30.0 kms |
| 12 | Mini truck like Tata mobile, Bolero Camper or similar with 1.0 km lead |
| 13 | Extra per kilometer for lead >1.0 kms upto 5.0 kms |
| 14 | Extra per kilometer for lead >5.0 kms upto 10.0 kms |
| 15 | Extra per kilometer for lead >10.0 kms upto 20.0 kms |
| 16 | Extra per kilometer for lead >20.0 kms upto 30.0 kms |
| 17 | Truck, tipper or similar with 1.0 km lead |
| 18 | Extra per kilometer for lead >1.0 kms upto 5.0 kms |
| 19 | Extra per kilometer for lead >5.0 kms upto 10.0 kms |
| 20 | Extra per kilometer for lead >10.0 kms upto 20.0 kms |
| 21 | Extra per kilometer for lead >20.0 kms upto 30.0 kms |
| 22 | Head load carriage of machinery/ equipment at locations inaccessible by vehicles on plain/ rough terrain |
| 23 | Upto 50 kgs load |
| 24 | Extra for every additional 50kgs load (Note: Fraction >=25kgs shall be taken as equivalent to next load of 50kgs) |
| 25 | Extra for uphill terrain (Ground Slope >= 07 deg) |
| 26 | TRANSFORMERDismantling of 33/0.4 kv or 11/0.4kV transformer by way of disconnecting of all HT and LT connections, opening of top lid, draining out of T. Oil and its safe placement for further refilling, taking out of coils after removal of core assembly, etc. Job also includes detaching of core HV/LV coils. |
| 27 | upto 50 kVA |
| 28 | >50 upto 100kVA |
| 29 | >100kVA upto 250 kVA |
| 30 | greater than 250 kVA upto 630kVA |
| 31 | Complete assembling of 33/0.4 kv or 11/0.4kV transformer after cleaning of tank, fitting of coil assembly in the tank. Job further includes closing of the transformer lid by way of fitting of existing nuts/bolts and gaskets, insulators, etc. Refilling of t.oil upto required level in tank. Reconnecting of HT/ LT connections and testing. |
| 32 | upto 50 kVA |
| 33 | >50 upto 100kVA |
| 34 | >100kVA upto 250 kVA |
| 35 | greater than 250 kVA upto 630kVA |
| 36 | POLESDismantling of pole/ street light standard/ strut embedded incement concrete foundation etc. as required. |
| 37 | Erection of metallic pole in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. |
| 38 | Above 4.5 meter and upto 6.5 meter |
| 39 | Above 6.5 meter and upto 8.0 meter |
| 40 | Above 8.0 meter and upto 10.0 meter |
| 41 | Above 10.00 meter and upto 12.00 meter |
| 42 | Cutting charges of Mild steel pipes/ plates including cost of consumables, etc.but excluding the cost of transportation charges of equipment to site |
| 43 | Using grinder |
| 44 | By gas cutting |
| 45 | Welding charges of Mild steel sections, etc including cost of consumables, etc. but excluding the cost of transportation charges of equipment to site |
| 46 | By electric welding |
| 47 | By gas welding |
| 48 | Hiring of mobile crane |
| 49 | Providing of transformer oil / Type II inhibited oil conforming to IS 335 (Preferred make: Power oil/ Indian Oil Servo/ HPCL) |
| 50 | Providing of graphited natural fibre (non-asbestos) packing.(Preferred make: Champion Style-3116 or equivalent) |
| 51 | Filtration & demoisturizing of Transformer-oil (on site) |
| 52 | INSULATORSSupplying and erection of galvanised ‘D’ iron clamps complete with shackle insulator (75 mm X 90 mm), G.I bolts, nuts and washers, coach screws etc. as required (for LT lines). |
| 53 | Supplying and erection of 100 mm X 80 mm pin insulator complete with G. I. Spindle and nuts etc. as required (for LT lines). |
| 54 | Supplying and erection of 11 KV pin insulator complete with large steel head G.I. pin, nuts, washers etc. as required. |
| 55 | Supplying and erection of 33 KV pin insulator complete with large steel head G.I. pin, nuts, washers etc. as required. |
| 56 | Supplying and erection of 11 KV disc insulator with galvanised insulator fittings, ball and socket type and complete with galvanised strain clamps, bolts, nuts, washers etc. as required. |
| 57 | Supplying and erection of a set (of three) 11 KV disc insulator for 33 KV overhead lines with galvanised insulator fittings, ball and socket type and complete with galvanised strain clamps, bolts, nuts, washers etc. as required. |
| 58 | LIGHTING ARRESTORSupplying and erection of three piece nonlinear resistor type lightning arrestor suitable for 3 wire, 11 KV overhead lines with rated voltage 9 KV (rms) with a nominal discharge current rating of 5 KA and complete with galvanised clamping arrangement, G.I. bolts, nuts, washers etc. as required. |
| 59 | Supplying and erection of single piece nonlinear resistor type lightning arrestor suitable for 3 wire, 33 KV overhead lines with rated voltage 30 KV (rms) with a nominal discharge current rating of 10 KA (station class) and complete with galvanised clamping arrangement, G.I. bolts, nuts, washers etc. as required. |
| 60 | Providing and fixing of lightning conductor finial, made of 25mm dia 300 mm long, G.I. tube, having single prong at top, with 85mm dia 6 mm thick G.I. base plate including holes etc.complete as required. |
| 61 | FUSESSupply and erection of 200A horn gap fuse set suitable for 3 wire, 11 KV overhead lines. |
| 62 | Supply and erection of 33KV horn gap fuse set |
| 63 | Providing of 11Kv DO Operating Rod (FRP) with min. 18 ft length |
| 64 | Providing and fitting of fuse element of required current rating for DO Fuse. |
| 65 | Providing of requisite tinned copper fuse wire |
| 66 | SWITCHES & MISCELLANEOUSProviding and fitting of 11 KV 200A 3-ph Gang operated Air Break Switch |
| 67 | Providing and fitting of 33kV Isolator with Earthing Blade (36kV,800A,Outdoor,3 poles,25kA) |
| 68 | Providing and fitting of 33kV Isolator without Earthing Blade (36kV,800A,Outdoor,3 poles,25kA) |
| 69 | Providing and fixing of 'DANGER' plate of standard size with clamps. |
| 70 | Providing and fixing of anti-climibing device with clamps, etc. |
| 71 | EARTHINGEarthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and 20mm GI (medium class) watering pipe 2.7 meter long, funnel etc. with charcoal/ coke and salt as required. |
| 72 | Supplying and laying 6 SWG G.I. wire at 0.50 metre below ground level for conductor earth electrode, including connection/ termination with GI thimble etc. as required. |
| 73 | Supplying and laying 25mm X 5mm G.I strip at 0.50 metre below ground as strip earth electrode, including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. |
| 74 | Providing and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing along with existing surface/ recessed conduit/ submain wiring/ cable as required. |
| 75 | Providing and fixing 25 mm X 5 mm G.I. strip on surface or in recess with GI saddles and allied fittings for connections etc. as required. |
| 76 | TRANSFORMER/ AUTOTRANSFORMERProviding new CRGO lamination to the core in place of damaged core wherever necessary including cost of materials and labour |
| 77 | Providing, preparation and fitting new HV copper coils of electrolytic grade copper wire windings having F-class insulation in place of damaged coils including allied jobs such as varnishing (Becks or any other reputed make) drying, etc., - per kg of winding to transformers.(Note: Labour charges for fitting of inter-layer insulation are taken into account for estimation but the cost of inter-layer insulation materials is not included and shall be paid extra) |
| 78 | Providing, preparation and fitting new LV copper coils of electrolytic grade copper strip windings having F-class insulation in place of damaged windings including allied costs such as varnish (Becks or any other reputed make), drying, etc., - per kg of winding to transformers.(Note: Labour charges for fitting of inter-layer insulation are taken into account for estimation but the cost of inter-layer insulation materials is not included and shall be paid extra) |
| 79 | Providing, preparation and fitting of finished new aluminium coils of SE/ DPC insulation type in place of damaged coils including labour costs, etc., (Both HV/ LV) - per kg of winding.(Note: Labour charges for fitting of inter-layer insulation are taken into account for estimation but the cost of inter-layer insulation materials is not included and shall be paid extra) |
| 80 | Rewinding of HV (11kV or 33kV) old Copper Coil of transformer and re-insulation with new inter-layer insulation (Labour only) - per kg of transformer winding.(Note: Labour charges for fitting of inter-layer insulation are taken into account for estimation but the cost of inter-layer insulation materials is not included and shall be paid extra) |
| 81 | Rewinding of LV old Copper Coil of transformer and re-insulation with new inter-layer insulation (Labour only) - per kg of transformer winding.(Note: Labour charges for fitting of inter-layer insulation are taken into account for estimation but the cost of inter-layer insulation materials is not included and shall be paid extra) |
| 82 | Rewinding with re-insulation of HV (11kV) old aluminium coil and re-insulation with new inter-layer insulation (Labour only) - per kg of transformer winding.(Note: Labour charges for fitting of inter-layer insulation are taken into account for estimation but the cost of inter-layer insulation materials is not included and shall be paid extra) |
| 83 | Rewinding with re-insulation of LV old aluminium coil and re-insulation with new inter-layer insulation (Labour only) - per kg of transformer winding.(Note: Labour charges for fitting of inter-layer insulation are taken into account for estimation but the cost of inter-layer insulation materials is not included and shall be paid extra) |
| 84 | Providing and fitting of Hot dipped galvanised MS nuts, bolts and washers of assorted sizes |
| 85 | Supply of Neoprene Rubberized Gasket Sheet |
| 86 | 3mm thick |
| 87 | 5mm thick |
| 88 | 6mm thick |
| 89 | Providing and fitting of LV (1.1 KV) porcelain bushings of rating: |
| 90 | 250 A |
| 91 | 630 A |
| 92 | 1000 A |
| 93 | 2000 A |
| 94 | 3150 A |
| 95 | Providing and fitting of HV porcelain bushings of rating: |
| 96 | 250 A, 17.5KV |
| 97 | 630 A, 17.5KV |
| 98 | 1000 A, 17.5KV |
| 99 | 2000 A, 17.5KV |
| 100 | 250 A, 33KV |
| 101 | 630 A, 36KV |
| 102 | 1000 A, 36KV |
| 103 | 3150 A, 36KV |
| 104 | Providing and fitting of metal part stem with allied fittings of transformer bushings (HV/ LV) as under: |
| 105 | Brass |
| 106 | Aluminium |
| 107 | Copper (average) Please Enable Macros to View BoQ information |