| 1 | INSTALLATION OF PVC TANK WITH SUBMERSIBLE MOTOR PUMP |
| 2 | Hiring charges for boring T&P etc. including digging of Pit. |
| 3 | Drilling of 150mm dia bore hole by palm & pressure method in soft medium hard soil except rock, using necessary labours T&P special tools required and clearing of site after completion of work etc. all complete. |
| 4 | 0-30 meter BGL |
| 5 | 30-45 meter BGL & above |
| 6 | Lowering of 110/63mm dia PVC Pipe assembly in 150mm dia bore hole jointing of PVC Pipe and other com-ponents by solvent cement and nail/screw etc including all labour and T&P required to execute the work all complete upto depth from ground level. |
| 7 | 0-45 meter and above |
| 8 | Providing & packing of 0.6M3 graded coarse sand approved by engineer in charge in surrounding of PVC Pipe and strainer including all labours T&P etc. required, for proper completion of work. |
| 9 | Development of bore by pumping and back washing till sand free yield of water is achieved including all material & labour & T&P etc. to the entire satisfaction of Engineer incharge. |
| 10 | Supply of ISI Marked PVC pipe 110mm dia-6kg/cm2 as per conforming to IS 4985/2000 (Material supply would be taken essentially from manufacturer listed/approved in U.P. Jal Nigam. |
| 11 | Supply of ISI Marked dia PVC Ribbed screens (3m length +1m B.P.) as per conforming to IS: 12818/2010 (Material supply would be taken essentially from manufacturer listed/approved in U.P. Jal Nigam. |
| 12 | Supply of 1 HP A.C Submersible motor pump of approved manufacturer from BIS with all material T&P complete for power connection with starter pannel. |
| 13 | Supply and Installation of PVC Water storage tank of 1000 lit. storage capacity |
| 14 | Supply of ISI Marked G.I pipe 32mm dia (Column pipe) as per conforming to relevant IS (Material supply would be taken essentially from manufacturer listed/approved in U.P. Jal Nigam. |
| 15 | Masonary type Platform for Placing 1000 Litre Water Tank |
| 16 | Concrete with 40 mm gauge brick ballast, local sand and cement in proportion (8:4:1) in foundation and floors including excavation of earth for PCC work and supply of all materials, labour, T&P etc. required for proper completion of work. |
| 17 | 1st class brick work in 1:6 cement and Coarse sand mortar in foundation and plinth including excavation of earth for Brick work upto plinth level and supply of all materials, labour, T&P etc. required for proper completion of work. |
| 18 | 1st class brick work in 1:6 cement and Coarse sand mortar in Superstructure including supply of all materials, labour, T&P etc. required for proper completion of work. |
| 19 | 12 mm thick plaster with cement and coarse sand mortar in 1:3 (over brick work with 3 mm floating coat of neat cement including supply of all materials, labour,T&P etc required for proper completion of work. From GL up to sup perstructure. |
| 20 | Mild steel or Iron work in plain work such as R.C.C. Work wrough to required shape as necessary including its bending and supply of steel,wastage, over lapping and hooks etc complete required for proper completion of work. |
| 21 | R.C.C. Work cement.coarse sand and 20 mm gauge approved stone ballast in proper ratio of 1:2:4 excluding supply of reinforce me nt and it bending but including its fixing and binding the same with 0.5 mm thick binding wire (to be supply by the contractor) centering ad shuttering supply of all materials, labour,T&P etc required for proper completion of work. |
| 22 | White washing over peviously plastered brick work in two coats. |
| 23 | Supply of ISI Marked GI pipe (schedule 40) of 25mm dia (Raising Main) as per conforming to relevant IS and carting,laying Installation from tubewell to Storage tank. |
| 24 | Supply of Bib cock PTMT Type. |
| 25 | Supply of all material labour and T&P etc. required for fabricated grill for protection of tank. |
| 26 | Construction of chamber. |
| 27 | Supply and installation of signage board. |
| 28 | Provision for power connection of 1 KW. |
| 29 | Provision for electricity charges for 1 KW electric meter with considering 3hrs. Pumping per day. (12 Month x 17 units) Please Enable Macros to View BoQ information |