| 1 | Earthwork excavation in foundation trenches and column and plinth etc in all kinds of soil lead up to 100 Mtrs. and lift upto 1.5 Mtrs including stacking the excavated earth not more than 3 M from the edge of excavation and then rerturning the soil in 15 cm layers when required in plinths and sides of the foundation etc. consolidating each deposited layers by watering, ramming and the disposing offal surplus excavated soil in a lead of 30 Mtrs. as directed by Engineer-in- Charge. all labour charges, cost of transportation charges, minor tools, GST, Cess etc., Complete. |
| 2 | Providing and laying CC 1:3:6 (1 cement, 3 pulvarized sand & 6 stone chips of size 2cm graded Sri Vijaya Puram Local quarry) in all CC works as directed by the EIC, including cost of cement, cost of stone chips and pulvarized sand, screening and washing of both the aggregates, cost of nominal centering and shuttering charges, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator, curing, including cost of all materials, all labour charges, transportation charges, minor tools, GST, Cess etc., Complete. |
| 3 | Providing and laying RCC M20 (1:1.5:3 one cement, one and half mainland river sand & three stone chips) using 20mm graded stone chips from mainland, Mainland river sand 43 grade ordinary portland cement for cast-in- situ concrete and as directed by the EIC, inculding cost of cement, cost of stone chips and mainland river sand all labour charges for mixing conveying placing consolidation screeing and washing of stones chips and sand transportation charges of all materails to work site and running charges of concrete mixer, vibrator, consumables and all other required materials, cost of minor tools and plant, GST, Cess etc., Complete. (But excluding cost of shuttering which will be paid separately) |
| 4 | Supply delivery and transportation of steel of grade Fe 500 HCR/CRS for fabrication and fixing of reinforcement for substructure and superstructure works as per the direction of EIC including cost of fabrication and fixing steel rods, cost of steel rods, all handling charges, cutting, bending, lapping, welding in position wherever necessary and tying with black 18 SWG annealed binding wire, all labour chargs, transportation charges of all materials to Work Site, cost of binding wires, all T&P required for the work, minor tools, GST, Cess etc., complete. |
| 5 | Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc. and removal of the same from reinforced cement concrete and plain concrete work as directed by the EIC, including cost of plywood, centering and shuttering, all labour charges, cost of binding materials, cost of transportation charges of all materials to work site, cost of ballies, cost of minor tools, GST, Cess etc., Complete. |
| 6 | Lifting the Gaint/mini giant tyre from the berthing face of the wharf for replacing GI nipple, GI flange, GI chain, GI D-Shaekle, wire rope, Wire grips etc., including conveying the giant/mini giant tyre from berthing face of wharf to working yard within a lead of 50 M etc., including cost of all labour charges and minor tools, GST, Cess etc., complete. |
| 7 | Fixing of Mini Giant tyre fenders on the berthing face of the jetty/wharf containing one tyre, including making holes, cutting, bending and fixing of GI nipple, GI flange, GI chain, GI D-Shaekle, wire rope, Wire grips etc., but excluding cost of mini giant tyres, GI nipple, GI flange, GI chain, GI D-Shaekle, wire rope, Wire grips etc., which will be supplied by the department on free of cost from ALHW Store at Sri Vijaya Puram, including cost of hire charges of welding machine, cost of electrodes, paking of empty gunny bags inside the tyre, scaffolding charges, transportation charges of all materials to work site, all labour charges, minor tools and plants, GST, Cess etc., complete. |
| 8 | Applying cardium compound on the wire rope / G.I chains of the fender etc., excluding cost of cardium compound but including cost of transportation, scaffolding arrangements, brush, all labour charges, minor tools, GST, Cess etc., Complete. |
| 9 | Painting two coats of synthetic enamel black paint on the surface of 90/30/10 Ton capacity bollars and numbering over the bollards with white paint as required, including cost of paint, brush, transportation charges of all materials to work site, all labour charges and minor tools, GST, Cess etc., complete. |
| 10 | 90/30 Ton Capacity |
| 11 | 10 Ton Capacity |
| 12 | Breaking reinforced cement concrete M20/ M30 or richer mix using air compressor and pavement breaker including cost of hire charges of pavement breaker and air compressor with POL and operator, disposal of unserviceable material within a lead of 50 mtrs cost of all labour charges, minor tools, GST, Cess etc., Complete. |
| 13 | Providing and laying PCC M20 (Wearing coat 1:1.5:3 one cement, one and half mainland river sand & three stone chips) using 20mm graded stone chips from mainland, Mainland river sand 43 grade ordinary portland cement for cast-in- situ concrete and as directed by the EIC, inculding cost of noimal shuttering, cement, cost of stone chips and mainland river sand all labour charges for mixing conveying placing consolidation screeing and washing of stones chips and sand transportation charges of all materails to work site and running charges of concrete mixer, vibrator, consumables and all other required materials, cost of minor tools and plant, GST, Cess etc., Complete. |
| 14 | Steel work welded in built up sections / framed work including cutting, hoisting, fixing in position, welded, bolted and applying a priming coat of approved steel primer using G.I steel tubes & structural steel etc. as required in steel ladder ralling, balcony railings, staircases railing, gate and similar works etc, as per the direction of EIC, including coat of all materials, fitting charges, all labour charges, transportation charges and minor tools, GST, Cess etc., complete G.I pipe 50mm/40mm/25mm dia nominal bore (class B) Complete. |
| 15 | Removing / scrapping dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches including cost of sand paper including cost of all labour charges, minor tools, GST, Cess etc., Complete. |
| 16 | Painting two coats with 1st quality synthetic enamel paint approved quality over the Kerb walls and hand railing as directed by the EIC, including cost of all materilas like paint, brush, scaffolding charge, transportation charges of all materilas to work site, all labour charges, minor tools, GST, Cess etc., complete. |
| 17 | Painting with two or more coats with 1st quality antifungal exterior plastic emulsion paint of approved brand and manufacture to give an even shade including cost of antifungal paint, brush, cost of all other materials, scaffolding arrangements, transportation charges of all materials to work site, all labour charges, minor tools, GST, Cess etc., Complete. |
| 18 | Plastering with cement mortar in 12 mm thick with 1:4 (one cement and four mainland river sand) cement mortar using Mainland river sand and 43 grade Ordinary Portland Cement as per the direction of EIC, including cost of cement, mainland river sand, all labour charges, transportation charges of all materials in work site, scaffolding charges, cost of minor tools and plants, GST, Cess etc., complete. |
| 19 | Cement concrete flooring 1:2:4 (1 cement : 2 mainland coarse sand : 4 graded stone aggregate from mainland) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete including cost of all materials, minior tools, GST, Cess etc., Complete.40 mm thick with 20 mm nominal size stone aggregate Please Enable Macros to View BoQ information |