|
| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: EXECUTIVE ENGINEER PMGSY DIVISION RAMNAGAR Name of Work: Restoration of roads under the jurisdiction of PMGSY Division Ramnagar on emergency basis by way of clearance of snow/slips likely to occur during financial year 2026-2027 on :- 1.Upgradation of road from L.R Marta to Sunetarkhas road Pkg No: - JK14-482 Length: - 6.00 Km 2. Ara to Touri Pkg No JK14-530 Length: - 4.00 km 3. Sunetar to Udak via Baba Khadsar Package No JK14-596 Length: 11.025 km 4. Sunetarkhas to Dhanwalt road Pkg No: - JK14- 351 Length: - 11.700 Km Contract No. JK14-482, JK14-530, JK14-596, JK14-351 Total Length:-32.725 Kms Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. d Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Snow Clearance by Mechanical Means using Machines as specified or equivalent by using Snow Plough 4WD 90 BHP (Trucks) |
| 3 | Slip clearance in ordinary soil incl. safe disposal with all leads and lifts etc. complete job. including Safe disposal as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property. |
| 4 | Slip clearance in soils mixed with moorum kankar/shingle/Boulders incl. safe disposal with all leads and lifts complete job as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property. |
| 5 | Slip clearance in soils mixed with decomposed soils, by blasting or any other means incl. safe disposal with all leads and lifts complete job as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property. |
| 6 | Slip clearance in meduim/ hard rock by blasting incl. safe disposal with all leads and lifts complete job as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property. |
| 7 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared |
| 8 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. |
| 9 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth. |
| 10 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth |
| 11 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Above 240 cm girth |
| 12 | Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out construction of shoring & bracing, removal of stumps and other deleterious materials and disposal up to a lead of 50 Mtr. dressing of sides and bottoms and back filling in trenches with excavated suitable material.Ordinary Soil 70% and Ordinary Rock 30% |
| 13 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. incl all leads, lifts and carriages all complete |
| 14 | Polygonal/Random Rubble Masonry laid dry un coursed brought to course in sub structure including cost of bond/through stones, also including all leads, lifts, carriages,of materials by MT handling and re-handling complete. |
| 15 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. 1000 mm dia. R.C.C. pipe laying by manual/mechanical incl all leads, lifts and carriages all complete |
| 16 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. 600 mm dia. R.C.C. pipe laying by manual/mechanical incl all leads, lifts and carriages all complete |
| 17 | Providing and laying of RBM filling incl. Cost of consolidation and all leads,lifts and carriages complete. incl all leads, lifts and carriages all complete |
| 18 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. incl all leads, lifts and carriages all complete |
| 19 | Dumping stones and cost of stones in horizontal or level incl all leads, lifts and carriages all complete Total in Figures 43307.62 43307.62 INR Forty Three Thousand Three Hundred & Seven and Paise Sixty Two Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |