| 1 | Cleaning of overhead RCC tank at Pump House No. 05 of capacity 0.75 Lakh Gallon using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed.(a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vacuum cleaning (e) Antibacterial spray (f) UV radiation |
| 2 | Cleaning of UG Sump at Pump House No. 07 and P-70 of capacity 0.28 Lakh Gallon using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed.(a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vaccum cleaning (e) Antibacterial spray (f) UV radiation |
| 3 | Cleaning of PVC Sump at Pump House No. 07 of capacity 0.11 Lakh Gallon using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed.(a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vaccum cleaning (e) Antibacterial spray (f) UV radiation |
| 4 | Cleaning of PVC overhead tank at ILP Location of capacity 0.11 Lakh Gallon using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed.(a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vacuum cleaning (e) Antibacterial spray (f) UV radiation |
| 5 | Opening completely pressure filter & oxidation chamber of capacity upto 15000 GPH and taking out existing filter media (sand, gravells) stainers and nozzles, removing and depositing filter media to a distance not exceeding 50 m including necessary repair/welding to make the pressure filter vessels complete leak proof for improving the strength and finally reassembling the pressure filter including filling of new strainer, gravles & sand in existing position duly cleaned replacing worn out gasket and nut bolts and washers, complete all as specified and as directed. Note- Strainers, gravels shall be measured and paid seperatley under relevant items. |
| 6 | Material and labour for prepration of old painted steel/iron surfaces of pressure filter & oxidation chamber by scrapping and cleaning of External and internal surfaces and applying two coats of black bituminious anti corrosive paint internal surface suitable for drinking water and Navy blue paint on outer surface marking the date of cleaning on the body, complete all as specified and as directed. |
| 7 | Supply only PVC push type/threaded type strainer suitable for filteration plant ,complete all as specified and as directed. |
| 8 | Supply only special coarse sand passing through 3.125 x 1.56 mm mesh suitable for use in filteration plant ,complete all as specified and as directed. |
| 9 | Supply only special coarse sand passing through 1.6 x 3.2 mm mesh suitable for use in filteration plant, complete all as specified and as directed. |
| 10 | Supply only new washed, cleaned, dust free, gravel of grading 25 mm to 20 mm graded filter media suitable for use in filteration plant , complete all as specified and as directed. |
| 11 | Supply only new washed, cleaned, dust free, gravel of grading 20 mm to 12 mm graded filter media suitable for use in filteration plant , complete all as specified and as directed. |
| 12 | Supply only new washed, cleaned, dust free, gravel of grading 12 mm to 06 mm. graded filter media suitable for use in filteration plant , complete all as specified and as directed. |
| 13 | Supply only new washed, cleaned, dust free, gravel of grading 06 mm to 03 mm graded filter media suitable for use in filteration plant , complete all as specified and as directed. |
| 14 | Supply and fixing in layers mix of manganese dioxide (MnO2) and treated carbofil in lumps of size 20 mm to 15 mm containing 75% of manganese Dioxide and 25% KG carbofil suitable for use in filltration plant , complete all as specified and as directed. |
| 15 | Supply and fixing live catalytic media (green Sand) suitable for use in filltration plant, complete all as specified and as directed. |
| 16 | Supply and fixing in repair's Butter fly valve PN-1.6 , 150 mm dia use in filltration plant, complete all as specified and as directed. |
| 17 | Supply and fixing in repair's Butter fly valve PN-1.6 , 100 mm dia use in filltration plant, complete all as specified and as directed. |
| 18 | Supply and fixing in repair's Butter fly valve PN-1.6 , 80 mm dia use in filltration plant, complete all as specified and as directed. |
| 19 | S&F Pressure gauge for blower as per existing after taking out old unserviceable one, complete all as specified and as directed by Engineer-in-Charge. |
| 20 | S&F nylon tube ¼ “ dia for chlorine dozing system , complete all as specified and as directed by Engineer-in-Charge. |
| 21 | S&F NRV 8 mm dia (antisyphon valve) for chlorine dozing system, complete all as specified and as directed by Engineer-in-Charge. |
| 22 | Supply of calcium based high strength chlorination chemical for water disinfceant in granular form in factory sealed HDPE container 45 kg drum, chlorine concentratian level 65% to 70% complete all as specified and directed.Note : Test certificate, Date of manufacture and date of expiry to be submitted. |
| 23 | Supply of Raw Water Poly Aluminium Chloride Inorganic Soluble Polymer In Sealed Plastic Bag, Medium Basicity, Suitable for Water Treatment. (PACKED IN 25 Kg. PLASTIC BAGS) complete all as specified and directed by Engr-in Charge. |
| 24 | Supply & fixing elecrtonic dosing pump of chemical dosing system with dosing pump/ injector with minimum pressure 6 Kg/Cm and minimum flow 20 ltr per hour complete all as specified and directed. |
| 25 | Lifting & Lowing of submersible pump of any type and capacity alongwith column pipe and 3 core flat cable complete after disconnecting of all elect and water line connection for the any make of pump & motor. |
| 26 | Developing of tube well by means of air compressor, for number of hours, until sand free clear potable water is obtained including testing to get maximum yield and discharge complete all as specified and as directed.(Note : Above rate is inclusive of T & P & DHPP ) |
| 27 | M&L for re-winding of 22.5/25 HP Submersible motor after lifting up of submersible pump set including column pipe from bore well, disconnecting motor from pump, taking out burnt winding wire of field coil and re-winding of field coil with suitable size of super enameled copper winding wire with necessary insulation materials including complete overhauling and re-fixing motor, pump on frame with new nuts bolts etc and necessary connection to the terminal complete all as directed. |
| 28 | M&L for re-winding of 15 HP Submersible motor after lifting up of submersible pump set including column pipe from bore well, disconnecting motor from pump, taking out burnt winding wire of field coil and re-winding of field coil with suitable size of super enameled copper winding wire with necessary insulation materials including complete overhauling and re-fixing motor, pump on frame with new nuts bolts etc and necessary connection to the terminal complete all as directed. |
| 29 | M&L for re-winding of 12.5 HP to 15 HP induction motor disconnecting motor from pump, taking out burnt winding wire of field coil and re-winding of field coil with suitable size of super enameled copper winding wire with necessary insulation materials including complete overhauling and re-fixing motor, pump on frame with new nuts bolts etc and necessary connection to the terminal complete all as directed. |
| 30 | M&L for re-winding of 3 to 5 HP induction motor after disconnecting motor from pump, taking out burnt winding wire of field coil and re-winding of field coil with suitable size of super enameled copper winding wire with necessary insulation materials including complete overhauling and re-fixing motor, pump on frame with new nuts bolts etc and necessary connection to the terminal complete all as directed. |
| 31 | M&L for dismantling centrifugal pump of capacity 3 to 5 HP from motor and inlet outlet GI pipes and taking out for workshop for repair of impeller,casing water seal, shaft etc complete all as specified and directed. |
| 32 | Supply and fix cast iron foot valve 100 mm dia screwed type ISI marked, as per IS, including necessary rubber gasket, nut bolt,and taking out the unserviceable foot valve complete all as directed. |
| 33 | M&L for re-winding of 5/7.5 HP induction motor after disconnecting motor from pump, taking out burnt winding wire of field coil and re-winding of field coil with suitable size of super enameled copper winding wire with necessary insulation materials including complete overhauling and re-fixing motor, pump on frame with new nuts bolts etc and necessary connection to the terminal complete all as directed. |
| 34 | S&F in repair fully automatic star delta starter 30 HP in sheet steel encloser type MN with single phase protection feature AC 3 Phase 415 Volt 50 Hz all as specified and directed. |
| 35 | Excavation in trenches n exc 1.5 m wide & n exc 1.5 mtr deep in soft/lose soil for taking out pipe & laying of pipe & getting out for diverting of CI pipe line complete all as directed. |
| 36 | Returning, filling in, including spreading, leveling, watering & well ramming in layers n. exc 25 cm thick complete all as directed. |
| 37 | Removal of excavated soil to a distance not exc 50 m and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as directed. |
| 38 | M&L in repair DI pipe of 100 mm bore with spigot and socket end rubber gas cate joint(titon) centrifugally cast class k-7 conforming to IS 8329-2000 laid in trenches/ on surface/ over masonry pillar and connection to old or new position complete all as directed. Cost of joint included in the qoted rate (Make: Electro steel/Tata/ Jindal). |
| 39 | All as per here-in-above but 150 mm bore. |
| 40 | Supply and laying in repair of 3 layered (outer green coloured UV stabilized, middle black coloured UV stabilized and inner most layer white coloured with antimicrobial properly) fusion welder PP-R (Poly proplene randon Co-polymer) pipes laid in trenches incl plain PP-R and brass threaded PP-R fittings or flanged joints any type including all type of fittings Tee, bend, socket, MT, union etc with connecting up with existing system of grade PN 10, SDR-11 of 90 mm outer dia size complete all as specified and directed. |
| 41 | All as per here-in-above but for size 63 mm outer dia. |
| 42 | All as per here-in-above but for size 50 mm outer dia. |
| 43 | All as per here-in-above but for size 32 mm outer dia. |
| 44 | All as per here-in-above but for size 25 mm outer dia. |
| 45 | All as per here-in-above but for size 20 mm outer dia. |
| 46 | M&L DI bend any type, radius and angles, tappers and type (straight, bend, increasing, decreasing, or double socket etc. Tee pipes single branch Y junction, double branch cross (all socket, socket and Spigot or flanged ends) collors, caps and plugs for the Pipes socket and Spigot. All socket and flanged upto bore of 200 mm complete all as specified |
| 47 | M&L rubber gasket joint in repair for 80 mm bore CI/DI Pipe with Spigot & Socket ends after connection of old and new position complete all as directed. |
| 48 | All as per here-in-above but size 100 mm bore |
| 49 | All as per here-in-above but size 150 mm bore |
| 50 | Taking of existing US CI Sluice valve of any size, any type upto 150mm bore from 80 mm bore complete all as directed. |
| 51 | S/F 80 mm bore CI Sluice valve PN – 1.6 IS 14846-2000 with Spindle Iron (Heavy duty) Wheel head and both ends flanged and MS nut bolts and washers and pair of rubber/fiber gasket and fixed in position complete all as directed. |
| 52 | All as per above item but 100 mm bore |
| 53 | All as per above item but 150 mm bore |
| 54 | Refixing of Sluice valve 150 mm bore after taking out, refacing of valve spindle,re grinding, including taking part and reassembling, as per existing and complete descaling and proper functioning at site including replacement of new nuts, bolts, washers and gasket as required at site. (New parts will be measured and paid separately under Item No-46 here-in- after reassembling, testing and re-fixing complete all as directed). |
| 55 | All as per above item but size 100 mm bore |
| 56 | M&L for 50 mm bore gate valve gum metal class-II screwed down high pressure with clutch handle screwed both ends for Iron pipe including taking out of old unserviceable gate valve complete all as directed. |
| 57 | All as per above item but size 40 mm bore |
| 58 | All as per above item but size 25 mm bore |
| 59 | All as per above item but size 20 mm bore |
| 60 | S&F in repair PP-R gate valve (Brass insert) as per requirement of site and fixed of 63 mm bore including taking down all as specified and diretected. |
| 61 | All as per above item for size 32 mm bore |
| 62 | All as per above item for size 25 mm bore |
| 63 | M&L for in repair/rectification of leakage in existing rising/delivery CI/DI Pipe Spigot/ socketed end of 100 mm bore including necessary earth work (i.e. excavation, removal & refilling, of trench), Pumping out water from the ditch and rectify the defects by taking out of existing lead and rejoining The same by using necessary additional lead, Lead Wool, Spun Yarn & etc including testing, commissioning of CI Pipe line complete all as directed Spun yarn & other arrangement for rectification of said defects is included in the cost of item complete). |
| 64 | All as per above item but size 150 mm bore |
| 65 | S&F for straight plain brass ferrules (or connecting screws) screwed bolt ends of 20 mm bore Pipe complete all as directed |
| 66 | All as per above item but size 25 mm bore |
| 67 | Supply and Fixing in repair cast iron Non Return Sluice Valve heavy duty with flanged ends, brass spindle any pattern with Brass spindle with GM Check Nut confirming to IS including jointing and jointing material, nuts, bolts, and washer etc complete all as specified on size 100 mm. Make : Ramco, Zoloto, BIR or equivalent |
| 68 | M&L for brick massonary valve pit with brick in CM (1:6) with 100mm thick PCC work 1:3:6 type C2 from fundation over 75mm thick hard core, sub class B brick full brick thick wall, 15mm thick internal and external plaster at bottom of the pit of size 600x600x600 mm along with valve pit cover made out MS angle iron 50mm x 50mm x 6mm frame work, , MS platecover made out of 3.15mm thick with locking arrangment fixed over the valve pit including a coat of synthetic enamel paint over a coat of red oxide primer complete including necessary frame work welding, drilling etc all as directed by Engr-in-Charge. |
| 69 | M&L for brick massonary valve pit with brick in CM (1:6) with 100mm thick PCC work 1:3:6 type C2 from fundation over 75mm thick hard core, sub class B brick full brick thick wall, 15mm thick internal and external plaster at bottom of the pit of size 900x900x900 mm along with valve pit cover made out MS angle iron 50mm x 50mm x 6mm frame work, , MS platecover made out of 3.15mm thick with locking arrangment fixed over the valve pit including a coat of synthetic enamel paint over a coat of red oxide primer complete including necessary frame work welding, drilling etc all as directed by Engr-in-Charge. |
| 70 | M&L for brick massonary valve pit with brick in CM (1:6) with 100mm thick PCC work 1:3:6 type C2 from fundation over 75mm thick hard core, sub class B brick full brick thick wall, 15mm thick internal and external plaster at bottom of the pit of size 1200x1200x900 mm along with valve pit cover made out MS angle iron 50mm x 50mm x 6mm frame work, , MS platecover made out of 3.15mm thick with locking arrangment fixed over the valve pit including a coat of synthetic enamel paint over a coat of red oxide primer complete including necessary frame work welding, drilling etc all as directed by Engr-in-Charge. |
| 71 | S&F of high pressure PTMT ball float valve suitable for size of 25 mm dia with epoxy coated aluminum rod & HD plastic ball screwed for iron pipe including GI Fitting as reqd after taking out Old U/S item complete all as directed. |
| 72 | All as per above item No. here-in-above but size 20 mm bore Please Enable Macros to View BoQ information |
| 73 | All as per above item No. here-in-above but size 20 mm bore Please Enable Macros to View BoQ information |