| 1 | FittinganderectingoneHTPSCSinglePoleinposition,includingfitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 2 | LabourchargesforloadingHTPSCpolefromthestackingplaceand unloading the same at work site (transportation by any vehicle). |
| 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 4 | Transportingpolesbyhiredvehicletoadistancebeyond5kmand carrying upto 4 numbers of poles. (Running km) |
| 5 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 6 | Additionalrateforprovidingonediscset,PGclampetc.complete,onany type of HT pole for making cut point. |
| 7 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back fillingpit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 8 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 9 | FittingandprovidingoneStrutusingHTPSCpoleincludingdiggingand back filling pit in ordinary soil. |
| 10 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole includingdiggingandbackfillingpitsinordinarysoil,drawingsufficient lengthofGIearthleadstothegroundforearthing(excludingprovisionof earthing). |
| 11 | Fitting one set AB switch on existing DP, giving connection and drawing sufficientlengthofGIearthingleadstothegroundforearthing,excluding provision of earthing. |
| 12 | FittingoneAdditional75x40mm,1.8mChannelcrossarminexisting single pole including conveyance of materials. |
| 13 | FittingoneAdditional2.4m/3mChannelcrossarm(100x50x6mm),in existing 11kV DP including conveyance of materials. |
| 14 | AdditionalrateforexcavationofonePitforHTPole/HTStayinHard Laterite. |
| 15 | AdditionalrateforexcavationofonePitforHTPole/HTStayinSoft Rock. |
| 16 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works. |
| 17 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 18 | ProvidingoneCoilEarthusingNo.8GI-earthwire(50mmdia,115turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 19 | Fitting and providing one HT Fly stay for 11kV pole using A type pole includingdiggingandbackfillingpitsinordinarysoil,drawingsufficient lengthofGIearthleadstothegroundforearthing(excludingprovisionof earthing). |
| 20 | Dismantling(withoutdamage)oneLTPSC/RCCpoleafterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 21 | DisconnectingandloweringdownthesinglephaseWPservice connectionwithguywirefromtheOHlineandreconnectingthesame after completing the line work |
| 22 | FittingoneAdditionalVcrossarminexistingsinglepoleincluding conveyance of materials. |
| 23 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 24 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 25 | Providingconcretemuffingofsize0.45x0.45x1.5m(0.5maboveGLand 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 26 | Additional rate for excavation of one Pit for Coil Earthing in Laterite |
| 27 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 28 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 29 | Reconductoring (changing) one km LT OH Copper/old AAC/ACSR one conductor with new ACSR Rabbit conductor including conveyance of materials to and from the stacking place. |
| 30 | Reconductoring (changing) one km LT single phase 2 wire OH Copper/oldAAC/ACSRconductorlinewithnewACSRRabbitconductor including conveyance of materials to and from the stacking place. |
| 31 | Quoted Amount of BOQ1 in figures |
| 32 | GST Rate in percentage Please Enable Macros to View BoQ information |