| 1 | Construction of Embankment and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 (Local Earth) (Including labour Cess & Excluding GST) |
| 2 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (Including labour Cess & Excluding GST) |
| 3 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (Including labour Cess & Excluding GST) |
| 4 | Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (Including labour Cess & Excluding GST) |
| 5 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including labour Cess & Excluding GST) |
| 6 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.(Grade M-10) (Including labour Cess & Excluding GST) |
| 7 | Reinforced/Plain Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(Grade M-20) (Including labour Cess & Excluding GST) |
| 8 | Supplying, Fitting and Placing un-coated HYSD/TMT bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including labour Cess & Excluding GST) |
| 9 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(Grade M-30) (Including labour Cess & Excluding GST) |
| 10 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401(B) (Including labour Cess & Excluding GST) |
| 11 | Providing & Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling the same with three wheeled road roller 80-100 kN as per Technical Specification Clause 412 (Including labour Cess & Excluding GST) |
| 12 | Providing and erecting a \\"W\\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 (Including labour Cess & Excluding GST) Please Enable Macros to View BoQ information |